2025/07/23 Procedure

Run Diary

2025/12/08 IbIs data for Run 84
2025/10/27 Preparing for LN2 blowout
2025/09/30 Closing IVC
2025/10/13 Preparing for LN2 Transfer, Leak in IVC
2025/09/30 Closing IVC
2025/09/13 Closing IVC, Short on LED and phonon lines
2025/09/05 Tower Installation
2025/07/29
2025/07/28 Electrical check and throughput test at 77K, cryocleaning again.
2025/07/26 LN2 Transfer, Throughput test at Room temp
2025/07/25 More cryocleaning
2025/07/24 IVC, CVJ pumped out, Cryocleaning
2025/07/14 1K Valves leak test results
2025/07/02 1K tests
2025/07/01 Leak on Turbo, 1K test
2025/06/30 Lab Status and Matt's 1K pot test
2025/04/18 Run 83 initial He transfer
2025/03/04 Run 83 LN2 transfer and leak checks
2025/02/28 Run 82 Leak in IVC (part 3)
2025/02/14 Run 82 Leak in IVC (part 2)
2024/01/29 Run 82 Leak in IVC
2024/01/13 Run 82 baratron zero point and one shot to confirm still excess or empty
2024/01/08 Run 82 baratron installed
2024/12/18 Run 82 Stable Base 45 mK, SQUID Tuned
2024/12/16 Run 82 Stable Base 45 mK
2024/11/21 Run 82 LN2 transfer
2024/11/19 Run 82 Turbo pumping and Leak in Main Bath
2024/11/06 Source mover tests at room temperature
2024/11/01 Cryo-Cleaning Procedure
2024/09/19 Cooldown after 5K pumpout procedure
2024/09/18 5K pumpout procedure
2024/09/13 tuning squids, spikes in base temp returns
2024/08/19 LN2 blowout
2024/08/16 LN2 transfer
2024/08/07 Replaced indium seal and pumping down IVC
2024/07/22 LN2 transfer initial steps
2024/07/19 Cryocleaning mixture with manual GHS
2024/07/18 Cryocleaning mixture with manual GHS
2024/07/16 Cryocleaning mixture with manual GHS
2024/06/05 Pumped back all mixture to dump before working on the electricals

Run 80

Run Det Det Type Source Purpose
80 S104 SNOLAB HV prototype 2D Source Mover with shielded Am-241 try N-capture run with NaI-array coincidence
2024/05/06 Initial Data taking started. Source not moved yet. Source location= 0,0,0
2024/05/01
2024/04/23 IbIs taken yesterday manually. Try automated IbIs

Run 79

Run 78

78 S104 SNOLAB HV prototype 1D Source Mover with shielded Am-241 N-capture run with NaI-array coincidence
2023/11/31
2023/11/30
2023/11/29
2023/11/28
2023/11/27
2023/11/26
2023/11/25
2023/11/24
2023/11/23
2023/11/22
2023/11/21
2023/11/20
2023/11/19
2023/11/18
2023/11/17
2023/11/16
2023/11/15
2023/11/14
2023/11/13
2023/11/12
2023/11/11
2023/11/10
2023/11/09
2023/11/08
2023/11/07
2023/11/06
2023/11/05
2023/11/04
2023/11/03
2023/11/02
2023/11/01
2023/10/31
2023/10/30
2023/10/29
2023/10/28 Instruction on using camera python script in Windows
2023/10/27 LN2 blowout and Initial LHe transfer
2023/10/26
2023/10/25 LN2 transfer
2023/10/24
2023/10/23
2023/10/22
2023/10/21
2023/10/20
2023/10/19
2023/10/18
2023/10/17
2023/10/16
2023/10/15
2023/10/14
2023/10/13
2023/10/12
2023/10/11
2023/10/10
2023/10/09
2023/10/08
2023/10/07
2023/10/06
2023/10/05
2023/10/04
2023/10/03
2023/10/02
2023/09/29
2023/08/08
2023/06/17
2023/06/16
2023/06/15
2023/06/14
2023/06/13
2023/06/09
2023/06/08
2023/06/07
2023/06/06
2023/06/05
2023/06/01
2023/05/31
2023/05/17
2023/05/16
2023/05/13
2023/05/12
2023/05/11
2023/05/10
2023/05/09
2023/05/08
2023/05/07
2023/05/05
2023/05/04
2023/05/03
2023/05/02
2023/05/01
2023/04/30
2023/04/29
2023/04/28
2023/04/27
2023/04/26 Turbo pump failure found in the morning.
2023/04/25
2023/04/24
2023/04/23
2023/04/22
2023/04/21 Tower electrical check after installation, at BOB
2023/04/19 Tower Installation and 1st day of Cryocleaning
2023/04/18 Tower Assembly and Electrical checks
2023/04/17

between-run activity

Run 77

Run Det Det Type Source Purpose
77 S104 SNOLAB HV prototype Two Am-source, one fixed, second on 2D source mover with fixed X-arm –

between-run activity

Run 76

Run Det Det Type Source Purpose
76 S104 SNOLAB HV prototype Unshielded Am, 2D movable N-capture run with NaI-array coincidence.
2023/01/03 (Tue)
2022/12/29
2022/12/28
2022/12/27 Continue replacing broken tower wires with mananin.
2022/12/26 (Mon) Begin replacing broken tower wires with manganin
2022/12/22 Finish IVC reassembly. Close IVC with no payload for leakcheck purposes. Leak check IVC - no leak seen at stripline elbow or other seals.
2022/12/20 Replace stripline tube o-rings (use nitrile this time). Remove some rubbery stuff from fridge thermometer connector. Begin IVC reassembly.
2022/12/19 (Mon) Begin IVC disassembly to replace stripline elbow o-ring.
2022/12/16 Remove tower from fridge. Find that the tower wires for the motor coils are all broken. Remove 2D source mover.
2022/12/15 Some research suggests viton o-rings used at stripline elbow degrade with cold-cycling (nitrile is better). Open IVC, begin deinstallation.
2022/12/14 More stripline elbow leak checks. Lower main bath into pit.
2022/12/13 Finish disassembly of NaI array and lead/poly shield. Leak check at 274 K confirms leak at stripline elbow.
2022/12/12 (Mon) Warming up. Shut down NaI array. Start NaI array disassembly.
2022/12/11
2022/12/10
2022/12/09 Warming up. Electrical checks @ 13K confirm damage to SQUETs.
2022/12/08 Begin warmup. Pump mixture to dump.
2022/12/07
2022/12/06
2022/12/05 (Mon)
2022/12/04
2022/12/03
2022/12/02
2022/12/01 Take 0V high-threshold SiHV-triggered data to watch for He films. Warm fridge to 10K, pump out IVC.
2022/11/30
2022/11/29 Cool to base.
2022/11/28 (Mon) Warm fridge to 10K, pump out IVC.
2022/11/27
2022/11/26 Cool to base.
2022/11/25 Take 0V SiHV-triggered data to watch for He films. Work out how to “manually” zap SQUIDs. Warm fridge to 10K, pump out IVC.
2022/11/24 Take low-threshold SiHV-triggered data at -8, -16, -24, -34 V.
2022/11/23 Cool to base. Find that DAQ tools, sequencer doesn't work yet on DCRC2(CentOS7).
2022/11/22 Warm fridge to 10K, pump out IVC.
2022/11/21 (Mon) Take 0V low-threshold SiHV-triggered data.
2022/11/20 Cool to base
2022/11/19 Take -80V low-threshold SiHV-triggered data. Warm fridge to 10K, pump out IVC.
2022/11/18 Finally get MIDAS DAQ working on DCRC2 running CentOS7. Take -80V low-threshold SiHV-triggered data.
2022/11/17 Cool to base
2022/11/16 Take -80V data alternating SiHV- and NaI-triggered. Warm fridge to 10K, pump out IVC.
2022/11/15 Take -80V data alternating SiHV- and NaI-triggered.
2022/11/14 (Mon) Cool to base. Correct NaI trigger setting for lower window. Take -80V data alternating SiHV- and NaI-triggered.
2022/11/13 Warm fridge to 10K, pump out IVC.
2022/11/12 Take -80V data alternating SiHV- and NaI-triggered.
2022/11/11 Cool to base. Set NaI trigger to lower window. Take -80V data alternating SiHV- and NaI-triggered.
2022/11/10 He film symptoms seem to arrive earlier than before. Warm fridge to 10K, pump out IVC.
2022/11/09
2022/11/08 Cool to base.
2022/11/07 (Mon) Find that He-film symptoms arise at about the same time whether or not mixture is in fridge while IVC is closed for a day while warm. Warm fridge to 10K, pump out IVC.
2022/11/06 Take 0V SiHV-triggered data to monitor baselines.
2022/11/05 Cool to base.
2022/11/04 Close IVC valves and pump mixture into dump. Leave it like that for a day with the fridge warm.
2022/11/03 More evidence that He-film symptoms arrive earlier when IVC is left closed for a day before cooling. Warm fridge to 10K, pump out IVC.
2022/11/02 Determine that He-film symptoms show up earlier when the IVC is left closed for a day while warm. Take 0V SiHV-triggered data to monitor baselines.
2022/11/01 Cool to base
2022/10/31 (Mon) Close IVC valves and leave it like that for a day with the fridge warm
2022/10/30 Warm fridge to 10K, pump out IVC.
2022/10/29
2022/10/28 Cool to base
2022/10/27 Take -80V data alternating SiHV- and NaI-triggered. Warm fridge to 10K, pump out IVC.
2022/10/26 Take -80V data alternating SiHV- and NaI-triggered.
2022/10/25 Cool to base. Bring PuBe source back into lab. Take -80V data alternating SiHV- and NaI-triggered.
2022/10/24 (Mon) Warm fridge to 10K, pump out IVC.
2022/10/23 Take -80V low-threshold SiHV-triggered data.
2022/10/22 Cool to base. Take -80V low-threshold SiHV-triggered data.
2022/10/21 Take -80V data alternating SiHV- and NaI-triggered. Warm fridge to 10K, pump out IVC. Move PuBe source out of lab.
2022/10/20 Take -80V data alternating SiHV- and NaI-triggered
2022/10/19 Reduce upper threshold of NaI trigger to avoid saturation. Cool to base. Take -80V data alternating SiHV- and NaI-triggered
2022/10/18 Warm fridge to 10K, pump out IVC.
2022/10/17 (Mon) Take -80V low-threshold SiHV-triggered data
2022/10/16
2022/10/15 Cool to base
2022/10/14 Pump out IVC. Add still more vacuum grease to stripline elbow joint, lower stripline elbow all the way.
2022/10/13 Track rise in phonon baselines as He films build up
2022/10/12
2022/10/11 Cool to base
2022/10/10 (Mon) Pump out IVC. Add more vacuum grease to stripline elbow joint, lower stripline elbow all the way.
2022/10/09 Warm fridge
2022/10/08
2022/10/07
2022/10/06 Cool to base
2022/10/05 Continue pumping IVC
2022/10/04 Warm fridge to 10K, pump out IVC. Add vacuum grease to stripline elbow joint, lower stripline elbow all the way.
2022/10/03 (Mon) Take -80V low-threshold SiHV-triggered data
2022/10/02 Take -80V low-threshold SiHV-triggered data
2022/10/01 Cool to base. Take -80V low-threshold SiHV-triggered data
2022/09/30 Warm fridge to 10K, pump out IVC. Try raising stripline elbow as far as possible. Bring PuBe source back into lab
2022/09/29 Take low-threshold SiHV-triggered bg data at 0V and -80V
2022/09/28
2022/09/27 Cool to base.
2022/09/26 (Mon) Warm fridge to 10K, pump out IVC. Try raising stripline elbow.
2022/09/25 Take -20V and -80V bg data, SiHV- and NaI-triggered
2022/09/24 Take -4V bg data, SiHV- and NaI-triggered
2022/09/23 Cool to base. Remove PuBe source from lab. Take 0V bg data, SiHV- and NaI-triggered
2022/09/22 Warm fridge to 10K, pump out IVC
2022/09/21 Take -80V data, alternating SiHV- and NaI-triggered
2022/09/20 Take -80V data, alternating SiHV- and NaI-triggered
2022/09/19 (Mon) Cool to base. Take -80V data, alternating SiHV- and NaI-triggered
2022/09/18 Warm fridge to 10K, pump out IVC
2022/09/17 Take -80V data, alternating SiHV- and NaI-triggered
2022/09/16 Cool to base
2022/09/15 Phonon channels stuck in normal. Warm fridge to >5K. IVC = 0.1 ubar. Pump out IVC overnight.
2022/09/14
2022/09/13
2022/09/12 (Mon) Cool to base
2022/09/11 Phonon channels stuck in normal. Warm fridge to >5K. IVC = 0.1 ubar. Pump out IVC overnight.
2022/09/10
2022/09/09
2022/09/08
2022/09/07
2022/09/06 Take 0V SiHV-triggered data.
2022/09/05 (Mon)
2022/09/04 Start 1K Pot and start circulation, cool to base.
2022/09/03 Start 1K Pot and start circulation, 1K Pot failure, stop circulation.
2022/09/02
2022/09/01 Phonon channels stuck in normal. Warm fridge to >5K. IVC = 0.10 ubar. Pump out IVC overnight.
2022/08/31 Take -85V coincidence data, alternating SiHV and NaI triggering. Pulses suppressed by helium film around 9pm.
2022/08/30 Temperature spikes return. Take -85V coincidence data, alternating SiHV and NaI triggering
2022/08/29 (Mon) Start 1K Pot and start circulation, cool to base. Can't set bias above -85V without high leakage.
2022/08/28 Phonon channels stuck in normal. Warm fridge to >5K. IVC = 0.1 ubar. Pump out IVC overnight.
2022/08/27 Take -84V PuBe data. Leakage too high at higher biases.
2022/08/26 Temperature spikes return. Take -4V, -20V, -65V PuBe data.
2022/08/25 Start 1K Pot and start circulation, cool to base
2022/08/24 Phonon channels require high biases or are stuck in superconducting. Warm fridge to >5K. IVC = 0.25 ubar. Pump out IVC overnight.
2022/08/23 Phonon channels stuck in normal.
2022/08/22 (Mon) Temperature spikes return. Phonon channels look OK. Take 0V PuBe data, data looks OK.
2022/08/21 Start circulation, cool to base
2022/08/20 Start 1K Pot
2022/08/19 Recent data looks bad, attributed to helium films. Warm fridge to >5K. IVC = 4.6 ubar. Pump out IVC overnight.
2022/08/18 Find that HV can't be increased above ~-90V without high leakage
2022/08/17
2022/08/16
2022/08/15 (Mon) Suddenly apply 100s of V to HV box due to DAQ error. (This seems to have caused some damage.)
2022/08/14
2022/08/13 Evidence that TESs are colder than normal - could be thermal short from He films
2022/08/12
2022/08/11
2022/08/10
2022/08/09
2022/08/08 (Mon)
2022/08/07
2022/08/06
2022/08/05
2022/08/04
2022/08/03
2022/08/02 MC temperature spikes seen - first sign of He films problem
2022/08/01 (Mon)
2022/07/31 Start circulation, cool to base
2022/07/30 Initial LHe transfer
2022/07/29 Transfer LN2
2022/07/28 Mixture throughput is OK at ~120K (blockage gone)
2022/07/27
2022/07/26
2022/07/25 (Mon) Fridge failure: impedance blockage
2022/07/24
2022/07/23
2022/07/22 Do NaI calibrations with PuBe
2022/07/21
2022/07/20
2022/07/19 Do NaI calibrations with PuBe
2022/07/18 (Mon) Do NaI calibrations with PuBe and Na-22
2022/07/17
2022/07/16
2022/07/15 Do NaI calibrations with PuBe and Na-22
2022/07/14 Do NaI calibrations with PuBe and Na-22
2022/07/13
2022/07/12 Take HV-varied data, -200V → 0V
2022/07/11 (Mon) Take -200V PuBe data alternating Si-triggered and NaI-triggered.
2022/07/10
2022/07/09 Take -200V PuBe data alternating Si-triggered and NaI-triggered. Take 0V NaI-triggered data.
2022/07/08 Build new E-box purge bag. Take -200V PuBe data alternating Si-triggered and NaI-triggered.
2022/07/07 Take -200V PuBe data alternating Si-triggered and NaI-triggered.
2022/07/06 Take 0V PuBe data. Take -200V PuBe data alternating Si-triggered and NaI-triggered.
2022/07/05 Take -200V PuBe data alternating Si-triggered and NaI-triggered.
2022/07/04 (Mon) Take -200V PuBe data. Take test data while ramping HV down to 0V. Take 0V PuBe data. Take -200V PuBe data, alternating Si-triggered and NaI-triggered. MIDAS crash after midnight.
2022/07/03 Powercycle DCRC1 to fix DAQ problem. Take 0V PuBe data. Take -200V PuBe data, alternating Si-triggered and NaI-triggered. HV leakage probably high.
2022/07/02 Take 0V PuBe data. Take -200V NaI-triggered PuBe data. MIDAS crash, only 12 minutes of biased data.
2022/07/01 Move PuBe into lab. Set NaI array trigger window to 7.6-11.2 MeV. Take 0V PuBe data. Try HV but leakage too high.
2022/06/30 Apply voltage to source mover motor coils, all still seem to clearly be open. Power interruption shut off fridge pumps - fridge recovered after restarting pumps.
2022/06/29
2022/06/28
2022/06/27 (Mon)
2022/06/26
2022/06/25
2022/06/24 Remeasure source mover motor coils, all read open
2022/06/23 Source mover motor coils all read open
2022/06/22
2022/06/21
2022/06/20 (Mon)
2022/06/19
2022/06/18
2022/06/17 Take 0V Side2 data with bottom NaI configured for muon coincidence test. One series with S104 triggering, the next with NaI triggering.
2022/06/16
2022/06/15 Test NaI trigger rates with PuBe present. Take 0V Side2 data with PuBe (this time with boron shields). Remove lead from South wall to adjust boron socks, then put it back. Retest NaI trigger rates with PuBe present.
2022/06/14 Put Borax-filled socks around lower NaI detectors. Test NaI trigger rates with PuBe present. Hang 6 borax-filled socks over vertical NaI stack.
2022/06/13 (Mon) Fit-test “sock” shield for NaI, filled with salt
2022/06/12
2022/06/11
2022/06/10 Adjust NaI rack to accommodate boron shield tubes
2022/06/09 Test NaI trigger rates with PuBe present. Take 0V Side2 data with PuBe.
2022/06/08 Build platform to elevate PuBe paraffin drum. Receive new LakeShore RuOx thermometer. Test NaI trigger rates with PuBe present. Take 0V Side2 data with and without PuBe.
2022/06/07 Optimize lead wall for PuBe shielding with NaI array setup
2022/06/06 (Mon) Install lead and poly in North wall of lead/poly shield. Stack lead to build lead wall for PuBe gamma shielding.
2022/06/05
2022/06/04
2022/06/03
2022/06/02
2022/06/01 Take 0V Side2 data with Na-22 for coincidence test
2022/05/31 Take 0V Side2 data with and without Na-22, with three NaI detectors enabled for coincidence test. Adjust 1K Pot needle valve.
2022/05/30 (Mon)
2022/05/29
2022/05/28 Test NaI rate for Na-22 coincidence test
2022/05/27 Install lead on South wall of lead/poly shield (NaI side)
2022/05/26
2022/05/25
2022/05/24
2022/05/23 (Mon)
2022/05/22
2022/05/21
2022/05/20
2022/05/19
2022/05/18
2022/05/17
2022/05/16 (Mon)
2022/05/15
2022/05/14
2022/05/13 Take 0V and -3.8V Side2 data.
2022/05/12
2022/05/11
2022/05/10 Take 0V and -196V Side2 data.
2022/05/09 (Mon) Take 0V Side2 data. Something looks wrong with it.
2022/05/08
2022/05/07
2022/05/06
2022/05/05 Set DCRC4 to read trigger pulses from NaI array. Triggering on DCRC4 looks OK.
2022/05/04
2022/05/03 Take -240V Side2 data. Breakdown event during prebias.
2022/05/02 (Mon) Reset remote-HV maximum
2022/05/01
2022/04/30
2022/04/29
2022/04/28 Take -180V Side2 data.
2022/04/27 Take -220V Side2 data.
2022/04/26 Take -180V and -200V Side2 data. (-180V data anomalously noisy.)
2022/04/25 (Mon) Take -80V, -120V, -140V, -160V Side2 data.
2022/04/24 Start N2 purge at ebox
2022/04/23 Try HV remotely, but baselines elevated - suspect humidity is causing leakage at E-box
2022/04/22 Take 0V and -100V Side2 data. 14keV line resolvable in pulse width.
2022/04/21 Take 22V Side2 data. Can't resolve 14keV line.
2022/04/20 Take 100V Side2 data. Can't resolve 14keV line.
2022/04/19 With correct connections HV for Side2-readout works fine. Do mini-IbIs to set QET biases.
2022/04/18 (Mon) Discover mistake in connecting cables to HV box
2022/04/17
2022/04/16
2022/04/15 Find short from a Side2 channel to chassis - same intermittent tower short that appeared during installation. Try Side2-readout HV board, same problem: TES's go normal when bias applied. Measure NaI trigger rate again.
2022/04/14 Discover high leakage current with HV, suggesting short to chassis
2022/04/13 Problem applying HV in Side1-readout mode, TES's go normal
2022/04/12
2022/04/11 (Mon) Problems with DCRC1, fix by swapping DCRC1&3. Using DCRC6 measure trigger rates from NaI array at different thresholds.
2022/04/10
2022/04/09
2022/04/08 Set up Side1-readout HV board
2022/04/07
2022/04/06 Data indicates that source didn't move in expected direction. Move source back to center position. Take 2-sided 0V data. 1
2022/04/05 Trigger problems with DCRC6 reading NaI array triggers. Move source in positive y direction, see heating. Take 2-sided 0V data.
2022/04/04 (Mon) Modify LHe transfer procedure to maximize recovery efficiency
2022/04/03
2022/04/02
2022/04/01 Successfully connect NaI trigger signals to DCRC6. Trigger problems with DCRC6.
2022/03/31 Prepare board to connect trigger signals from NaI array to a DCRC
2022/03/30 Mini-IbIs. Take 2-sided 0V data
2022/03/29 Mini-IbIs on phonon channels to tune dP/dI
2022/03/28 (Mon) Test 2D source mover, move source to 0. See fridge heating. Get pulses in all 12 channels by swapping DCRCs 1&3
2022/03/27
2022/03/26
2022/03/25 Try and fail replacing DCRC1 with DCRC5
2022/03/24 Troubleshoot problems with DCRC1, try and fail with DCRC6
2022/03/23 Calibrate NaI array with PuBe gammas.
2022/03/22 MC = 28 mK. See pulses on some channels. No pulses on DCRC1.
2022/03/21 (Mon) Start circulation. MC → 28 mK. Goldman thermometer on Fridge wiring not reading correctly. Assemble 2 walls of lead/poly shield. Put new NaI array on South side of fridge.
2022/03/20
2022/03/19 Blow out LN2. Initial LHe transfer.
2022/03/18 Transfer LN2. Finish replacing end of Fridge Thermometer Cable 1. Start pumping out IVC at 10:30pm.
2022/03/17 Turbopump failure - cryostat vacuum jacket pressure high. Drop MB and open IVC, repair broken connection to motor coil. Continue work on Fridge Thermometer Cable 1. Pump out IVC and CVJ in parallel.
2022/03/16 Cryoclean mixture. Continue warmup. Begin pumping out cryostat vacuum jacket
2022/03/15 Blow out LN2. Discover IVC leak. Begin warmup, let gas into cryostat vacuum jacket. Begin replacing end on Fridge Thermometer Cable 1
2022/03/14 (Mon) Find on motor coil connection broken. Cryoclean mixture. LN2 transfer.
2022/03/13
2022/03/12 Fix tower short. Reinstall tower and begin pumping out IVC. Cryoclean mixture.
2022/03/11 More 2D source mover tests. Begin tower installation - find short, remove tower. Cryoclean mixture.
2022/03/10 Prepare interposer and diverter for accessories (2D source mover). Test 2D source mover in fridge clean tent. Cryoclean mixture.
2022/03/09 Assemble tower. Tower electrical check.
2022/03/08 Prepare connections for Goldman thermometer and piezoelectric sensor in 2D source mover
2022/03/07 (Mon) Finish Kapton striplines for 2D source mover. Test mover upside-down on bench.
2022/03/06
2022/03/05
2022/03/04 Adjust length of 2D source mover striplines. Solder sockets to ends of connectors for 2D source mover controller. Test new LakeShore resistance bridge with scanner.
2022/03/03 Make Kapton striplines for 2D source mover wires
2022/03/02 Realize 2D source mover must be used upside-down based on how it's mounted in housing
2022/03/01 Fit Am source into new lead collimator cup for 2D source mover. Test new LakeShore bridge without scanner. Disconnect 2D source mover wires from the controller connectors.
2022/02/28 (Mon) Damage lead collimator cup for 2D source mover. Receive new LakeShore Resistance Bridge with scanner. Map wires on fridge thermometer cables.
2022/02/27
2022/02/26

Run 75

Run Det Det Type Source Purpose
75 S104 SNOLAB HV prototype Unshielded Am, movable Test new Si-HV detector, find optimal settings/threshold, measure position dependence. Prep for n-capture run.
2022/02/25 Rewirebond S104 Side1pF
2022/02/24 Disassemble tower. Remove smoke-detector Am source from 1D source mover.
2022/02/23 Remove tower from fridge
2022/02/22 Begin tower deinstallation
2022/02/21 (Mon) Lower main bath and erect clean tent
2022/02/20 Continue warmup, MC → 294 K. Pump out cryostat vacuum jacket.
2022/02/19
2022/02/18 Continue warmup, MC → 255 K
2022/02/17 Continue warmup, MC → 135 K. Remove lead/poly shield.
2022/02/16 Begin warmup. Let bath boil off, stop circulation and 1K Pot, soften vacuum jacket, pump mixture to dump.
2022/02/15 Adjust QET biases to reduce dP/dI to 0.4 uV. Take +100V Side2 data.
2022/02/14 (Mon) Adjust QET biases to reduce dP/dI to 0.7 uV. Take +100V Side2 data.
2022/02/13 Adjust QET biases to reduce dP/dI from 1.0 to 0.9 uV. Take +100V Side2 data.
2022/02/12 Perform somewhat hotter Al flash. Take +100V Side2 data.
2022/02/11 Take +100V Side2 data. Data analysis confirms channel mapping incorrect. Verify that naming convention for DCRC connections on Side2-readout HV board are opposite those for Side1-readout board.
2022/02/10 Take +100V Side2 data. Move source to y=0mm.
2022/02/09 Tower = 38 mK, cooler with Side2-readout board c/w Side1-readout. Mini-IbIs suggests that maybe the presumed channel mapping is incorrect. Connect two of the HV board ground planes to improve noise.
2022/02/08 Modify Side2-readout board so that CONN2 LED wires are connected. Test Side2-readout board - noisy but working
2022/02/07 (Mon) Bench-test Side2-readout HV board.
2022/02/06
2022/02/05 Take +100V and -100V Side1 data.
2022/02/04 Take +100V Side1 data, this time with prebias. Move source to y=+30 mm.
2022/02/03 Take +150V Side1 data.
2022/02/02 Set up remote-control HV. Take +100V Side1 data.
2022/02/01 Double-check dead Side1pF with different DCRC. Set up Side1-readout HV. Take +20V Side1 data.
2022/01/31 (Mon) Repair Side1-readout HV board.
2022/01/30
2022/01/29
2022/01/28 Pump out vacuum jacket of transfer line
2022/01/27
2022/01/26 Take 2-sided (0V) data.
2022/01/25 Take 2-sided (0V) data. Move source to y=0 mm. Measure some Tc's
2022/01/24 (Mon) Take 2-sided (0V) data. Move source to y=+10 mm. Measure some Tc's
2022/01/23
2022/01/22
2022/01/21 Take 2-sided (0V) data. Move source to y=+20 mm. Measure some Tc's
2022/01/20
2022/01/19 Take 2-sided (0V) data. Move source to y=+30 mm.
2022/01/18 Take 2-sided (0V) data.
2022/01/17 (Mon) Take 2-sided (0V) data. 41.3 mK. Move source to y=+40 mm.
2022/01/16 Take 2-sided (0V) data. 44.7 mK
2022/01/15 Move source to y=+30 mm. Do hot Al flash.
2022/01/14 Take 2-sided (0V) data.
2022/01/13
2022/01/12
2022/01/11 Automated IbIs
2022/01/10 (Mon) Tower(Goldman) = 41 mK. Automated IbIs.
2022/01/09 Tower(Goldman) = 42 mK. Mini-IbIs on all channels. Take 2-sided (0V) data.
2022/01/08 Turn off 15V power on DCRC3&4 but turn it off on DCRC1 - this causes further cooling. Take 2-sided (0V) data.
2022/01/07 Move source to y=+20 mm. Do hot Al flash.
2022/01/06
2022/01/05 Do hot Al flash which restores Side2pD PCE. Take 2-sided (0V) data.
2022/01/04 Low amplitudes seen in Side2pD. Move source to y=+10 mm. Take 2-sided (0V) data.
2022/01/03 (Mon) Move source to y=+2 mm. Take 2-sided (0V) data. Begin adjusting QET biases based on temperature.
2022/01/02 Mini-IbIs on all channels @ Goldman = 48 mK.
2022/01/01 Evidence that +steps on source mover move it in -y direction
2021/12/31 Mini-IbIs on all channels @ Goldman = 48 mK.
2021/12/30
2021/12/29 Move source to y=-2 mm. Square-wave temperature pattern.
2021/12/28 Mini-IbIs on all channels @ Goldman = 51 mK. Take 2-sided (0V) data
2021/12/27 (Mon) Mini-IbIs on all channels @ Goldman = 51 mK
2021/12/26
2021/12/25
2021/12/24 Mini-IbIs
2021/12/23 Tower(Goldman) = 48 mK. Mini-IbIs. Measure Tc's of three channels
2021/12/22 Take 2-sided (0V) data.
2021/12/21 Install lead/poly shield
2021/12/20 (Mon) Take 2-sided (0V) data
2021/12/19
2021/12/18
2021/12/17
2021/12/16
2021/12/15 Tower(Goldman) = 50 mK. Automated IbIs
2021/12/14 Tower(Goldman) = 51 mK. Automated IbIs
2021/12/13 (Mon) Tower(Goldman) = 53 mK. Automated IbIs
2021/12/12
2021/12/11
2021/12/10 Tower(Goldman) = 56 mK. Side1pF not working, seems open. Do automated IbIs
2021/12/09 Tower(Goldman) = 58 mK. Tune SQUIDs
2021/12/08 Tower(Goldman) = 63 mK. Tune SQUIDs.
2021/12/07 Tower(Goldman) → 54 mK. Connect DCRCs, see first pulses.
2021/12/06 (Mon) Begin circulation. Tower(Goldman thermometer) → 58 mK
2021/12/05
2021/12/04
2021/12/03 Initial LHe transfer
2021/12/02 LHe delay continues. Blow out LN2 to do tests, then transfer LN2 into MB again.
2021/12/01 Transfer more LN2 because LHe not available
2021/11/30 Transfer LN2
2021/11/29 (Mon) Cryoclean mixture. Lower and raise MB because we forgot to attach the fill funnel.
2021/11/24 Cryoclean mixture. Prepare Goldman thermometer connection to cable/DCRC diverter board. Test setup for 77K tests of 2D source mover.
2021/11/23 Cryoclean mixture
2021/11/22 (Mon) Cryoclean mixture
2021/11/19 Cryoclean mixture
2021/11/18 Cryoclean mixture
2021/11/17 Cryoclean mixture
2021/11/16 (Tue) Cryoclean mixture
2021/11/05 Remove external electrode from housing, to use housing for 2D source mover
2021/11/03 Raise main bath. Cryoclean mixture
2021/11/02 Cryoclean mixture. Prepare cable for Goldman thermometer readout.
2021/11/01 (Mon) Finish tower installation, start pumping IVC.
2021/10/29 Wirebond work on SQUET ZC-70, reduce shunt resistances. Continue tower installation
2021/10/28 Wirebond work on SQUET ZC-39, reduce shunt resistances. Continue tower installation
2021/10/26 Wirebond work on SQUET ZC-13, reduce shunt resistances
2021/10/25 (Mon) Begin tower installation
2021/10/22 Tower electrical check
2021/10/21 Assemble tower for Run75. Attach resistors from source mover endstops to chassis.
2021/10/20 S104 electrical check. Prepare LED wires. Finish replacing resistors on HV board.
2021/10/19 Rewire connector for Tower thermometer. Prepare connector wires for Goldman thermometer.
2021/10/18 (Mon) Mount Goldman thermometer to housing lid
2021/10/15 Work on SQUET/stripline interposer board for accessories. Work on mounting for Goldman thermometer.
2021/10/14 More twisted pairs, continue replacing resistors on HV board
2021/10/13 Finish S104 wirebond repairs. Begin replacing resistors on HV board.
2021/10/12 Start twisted-pair assemblies for phonon channels
2021/10/11 (Mon) S104 wirebond repairs. Disassemble Run74 tower

Run 74

Run Det Det Type Source Purpose
74 USD1 USD-Ge 100mm 4Q Unshielded Am, movable Test time-dependent impact ionization properties of USD1. Followup of Run67
2021/10/08 Remove tower. Begin replacing resistors on HV board, to set up for HV bias to 6 Side2 phonon channels.
2021/10/07 Deinstall up to 100 mK stage. S104 wirebond repairs. Order bias resistors for HV board.
2021/10/06 Deinstall 4K stage
2021/10/05 Open IVC, begin deinstallation
2021/10/04 (Mon)
2021/10/01 Pump out CVJ for a few hours. Lower MB. Erect clean tent.
2021/09/30 Let gas into CVJ again, warming too slowly.
2021/09/29 Continue warmup. MC reaches 260 K. Pump out cryostat vacuum jacket.
2021/09/28 Continue warmup
2021/09/27 (Mon) Start warmup. Soften vacuum in cryostat vacuum jacket. Remove lead/poly shield from fridge.
2021/09/26 +10/0V data @ 4-6 K. Noise data as high as 10 K.
2021/09/25 +10/0V data @ 1.3 - 3.3 K. Also take noise before-and-after bias at various temperatures.
2021/09/24 +10/0V data @ 4.7 K. 1K Pot failure. Tower bottoms out at 3.3 K. Cool further by pumping on mixture, treating it as a 4He fridge. +10/0V data at various temperatures from 2-4 K.
2021/09/23 Let MB boil away - then decide to transfer more. Do “initial” LHe transfer.
2021/09/22 +10/0V data (and one -10/0V series) at various temperatures 2-3.5 K
2021/09/21 +9/0V data @ base. Breakdown tests. Stop circulation and 1K Pot. +10/0V data @ 0.8 K and 1.3 K
2021/09/20 (Mon) +8/0V data @ base. Noise data before-and-after bias. +10/0V data.
2021/09/19
2021/09/18 +10/0V data @ base
2021/09/17 +10/0V, -10/0V data @ 2.3 K. Restart circulation.
2021/09/16 +10/0V data @ 2.1 K
2021/09/15 +10/0V data @ 1.9 K
2021/09/14 -10/0 / +10/0V data, +10/0V data @ 1.5 K. Stop fridge circulation, 1K Pot still on.
2021/09/13 (Mon) +10/0 / +12/0V data. +10/0V data at base, then 1.15 K, then base again.
2021/09/12
2021/09/11 +12/0V data, but it overtriggered.
2021/09/10 -10/0V, -12/0V data. +8/0V, +10/0V data - seems to have fallen into “weak” state. Warm to 1.0 K, take +10/0V data.
2021/09/09 -8/0V data. Breakdown tests on Side2, both polarities.
2021/09/08 Ba-133 +8/0V data. -8/0V data.
2021/09/07 Take +8/0V, +10/0V data. Then +8/0 / +10/0V alternating. Then Ba-133 +8/0V data.
2021/09/06 (Mon) Take 0/-8 / 0/-10 V data.
2021/09/05 Take 0/-8V data
2021/09/04 Take 0/-10V / 0/-8V alternating data.
2021/09/03 Take 0/-10V data with half the FETs turned off. Impact ionization is stronger than before. Try again with all FETs on, i.i. still strong. Seems to be in stronger state.
2021/09/02 Take +10/0V data at base, 1.0 K, base again. Impact ionization slightly stronger at higher temperature.
2021/09/01 Noise problems, turned out that 2 channels were left biased. Take +10/0V data. Do some stepper motor tests at room temperature.
2021/08/31 Take some data with bias changed during series. Take +10/0V data at 0.87 K and at base.
2021/08/30 (Mon) Take +10/0V data
2021/08/29
2021/08/28
2021/08/27 Take +12/0V data (detector in strong i.i. state)
2021/08/26 Take some data with bias changed during series. Detector seems to have shifted to stronger state.
2021/08/25 Take some data with bias changed during series.
2021/08/24 Take +12/0V, +14/0V, 0/-16V data.
2021/08/23 (Mon) Take +9.8/0V, +10/0V, 0/-10V data. Detector seems to have shifted to weaker state.
2021/08/22
2021/08/21 Take 9.8/0V data
2021/08/20 Take data scanning +6/0V to +9.5/0 V
2021/08/19 Take +10/0V data at base, 0.86 K, base again. Detector transitions to stronger state. Try going from +10/0V to +10/-8V after i.i. peak - causes breakdown.
2021/08/18 Move source to y=0 mm. Take 0/-10 V data at 0.4 K and at base.
2021/08/17 Take 0V/-12V data, 0V/-10V data. Move source, take data with source near/over blocker.
2021/08/16 (Mon) some data mistakes - wrong thresholds, no flash
2021/08/15 overtriggered data
2021/08/14 Notice DCRCs have been unsynced since 07/26. Resync DCRCs
2021/08/13 Take 0V/-12V data with Na-22 source. Change bias during series: 0/-9 → 0/-12 V and 0/-12 → 0/0 V. Detector transitions to stronger i.i. “state”.
2021/08/12 Take 0V/-12V data with Na-22 source
2021/08/11 Take 0V/-9V data, repeat with Na-22 source.
2021/08/10 Take 0V/-15V data while measuring leakage current.
2021/08/09 (Mon) Take 0V/-12V data with source above q3. Move source to y=-40 mm. Take 0V/-12V data with source above q2. Move source to y=0mm.
2021/08/08
2021/08/07 Take 0V/-12V data. Move source to y=-30 mm.
2021/08/06 Take 0V/-12V data. Move source to y=-20 mm.
2021/08/05 Take 0V/-9V data. Move source to y=-10 mm.
2021/08/04 Take 0V/-12V data.
2021/08/03 Take 0V/-15V data. See transient breakdown (dropout) during data series. Try monitoring test resistor, too much noise.
2021/08/02 (Mon) Take 0V/-15V data. See transient breakdown (dropout) during data series.
2021/08/01
2021/07/31
2021/07/30 Problem with /data/cdms1, can't take data
2021/07/29 Take 0V/-15V data
2021/07/28 Try removing pi filters to see if it improves oscillation noise. Detector has shifted into medium-strength “state”. Try long flash. Repair some wirebonds on S104.
2021/07/27 Take 0V/-15V data
2021/07/26 (Mon) Take 0V/-15V data at base temperature. Detector has shifted into strong impact ionization “state”
2021/07/25
2021/07/24
2021/07/23 Take data at 0.66 K
2021/07/22 Take Na-22 data.
2021/07/21 Measure rate with Na-22. Take Na-22 data.
2021/07/20 Measure rate with Na-22. Take Na-22 data. Take data while moving source.
2021/07/19 (Mon) Take Na-22 data
2021/07/18
2021/07/17
2021/07/16 Measure event rates in detector with and without external Ba source present.
2021/07/15 Take 0V/-15V data and move source about 0.5 mm during data series.
2021/07/14 Take 0V/-15V data. Verify that source is at center (or at least that it is over q4).
2021/07/13 Take 0V/-15V data. Noise is higher than previous week.
2021/07/12 (Mon)
2021/07/11
2021/07/10 Move source to far endstop, then move it to center again.
2021/07/09 Take 0V/-15V data, determine source is over q3 (not at center). Discover broken wires on source mover diverter board, repair these.
2021/07/08 Realize source position is unknown - move to what might be the center. Try taking 0V/-15V data.
2021/07/07 Much lower noise in charge channels. Take 0V/-15V data.
2021/07/06 Find lower limit for source mover power. Take 0V/+15V data.
2021/07/05 (Mon)
2021/07/04
2021/07/03 Try source mover at lower voltage to reduce heating
2021/07/02 Check S104, find many broken wirebonds.
2021/07/01 Reach endstop, verified by contact resistance (wire labeled “far endstop”). Measure fridge cooling curve and compare with heating from source mover.
2021/06/30 Move source at 5.3 mm/hour without runaway heating. Receive SNOLAB Si-HV prototype detector S104 from SLAC.
2021/06/29 Experiment with different source mover movement speeds. 9.5 mm/hour results in runaway heating.
2021/06/28 (Mon) Confirm that source reached far endstop (or one of them at least) by backing up then moving forward again and seeing drop in temperature spikes. Start moving in the other direction toward near endstop.
2021/06/27
2021/06/26
2021/06/25 Move source further than should be needed to reach far endstop, but not seeing contact.
2021/06/24
2021/06/23
2021/06/22 Move source up to 128 steps with no decrease in current. Move far enough to reach near endstop.
2021/06/21 (Mon) Test source mover.
2021/06/20
2021/06/19
2021/06/18
2021/06/17
2021/06/16
2021/06/15 High noise in charge channels, oscillations @ ~3 kHz
2021/06/14 (Mon) Manage to get MIDAS working on cdms1 (still on Scientific Linux)
2021/06/13
2021/06/12 Tower thermometer suspected to be reading too high
2021/06/11 Start circulation. MC → 33 mK
2021/06/10 Initial LHe transfer
2021/06/09 Cryoclean mixture. Transfer LN2
2021/06/07 (Mon) Leak check IVC at 300K. Raise MB.
2021/06/04 Cryoclean mixture. Finish tower installation, pump out IVC.
2021/06/03 Cryoclean mixture
2021/06/02 Install tower. Fix broken connection on tower thermometer plug.
2021/06/01 (Tue) Install lower stripline heatsink
2021/05/28 Install 30mK can and middle IVC section
2021/05/27 Install 100mK can and MC spool
2021/05/26 Reassemble plumbing at top of fridge. Install upper stripline heatsink.
2021/05/25 Install stripline tube and upper IVC section.
2021/05/24 (Mon) Finish filing holes in fridge baffles, raise stripline tube again.
2021/05/23
2021/05/22
2021/05/21 Remove stripline tube again because new scratches are visible. Try filing edges of holes in fridge baffles.
2021/05/20 Reattach loose stripline baffles. Cover holes in baffles with Kapton tape, raise stripline tube into place.
2021/05/19 Sand fridge port for stripline tube, holes in fridge baffles
2021/05/18 (Tue) Polish 30mK, 100mK cans
2021/05/13 Remove o-ring from stripline elbow. Polish scratches out of top of stripline tube.
2021/05/12 IVC disassembly: remove upper IVC section and stripline tube
2021/05/11 IVC disassembly: remove middle IVC section, 30mK can, MC spool, 100mK can
2021/05/10 (Mon) Deinstall tower
2021/05/09 Warming, fridge → 275K
2021/05/08 Warming, fridge → 240K
2021/05/07 Warming, fridge → 123K
2021/05/06 Verify that leak is probably not from dilution unit. Try 1K Pot, doesn't cool effectively as expected due to IVC leak. Let He into cryostat vacuum jacket
2021/05/05 Initial LHe transfer. AGAIN, IVC pressure starts rising during transfer. IVC leak still present.
2021/05/04 Transfer LN2
2021/05/03 (Mon) Tighten bolts on upper IVC flanges, then raise MB again
2021/05/02 Fridge → 276 K
2021/05/01 Warming, fridge → 240K
2021/04/30 Try to identify gas in IVC. Warming, fridge → 183K.
2021/04/29 Let He into cryostat vacuum jacket, warm to 76K
2021/04/28 Initial LHe transfer. Again, IVC pressure starts rising during transfer, evidently an IVC leak. Conclude that it's not the stripline elbow. Seems to be one of the upper IVC flanges.
2021/04/27 Transfer LN2
2021/04/26 (Mon) Cryoclean mixture. MIDAS fails to work after cdms2 upgrade to CentOS.
2021/04/25
2021/04/24
2021/04/23 Leak check IVC indium seals at room temperature, no leaks detected. Replace bottom indium seal, repump out IVC.
2021/04/22 Warming, fridge → 270 K
2021/04/21 Warming, fridge → 230 K
2021/04/20 Warming, fridge → 160 K. Leak seems to disappear.
2021/04/19 (Mon) Let He into cryostat vacuum jacket, warm to 50K
2021/04/18 IVC leak still present at 4K, can't pump it down below 0.16 mbar
2021/04/17
2021/04/16 Initial LHe transfer. IVC pressure starts rising during transfer, evidently an IVC leak.
2021/04/15 Transfer LN2
2021/04/14 Cryoclean mixture. Raise main bath.
2021/04/13 Identify Side Coax Extender as likely location of short. Modify Tower and reinstall, seal IVC
2021/04/12 (Mon) Remove tower
2021/04/11 Lower Main Bath
2021/04/10 Pump out cryostat vacuum jacket
2021/04/09 Continue warmup
2021/04/08 Fix wirebonds on Side Coax ST-3-8
2021/04/07 At 77K short disappears then reappears. Blow out LN2, start warming
2021/04/06 Transfer LN2. q4 FET Gate short reappears. Conclude that problem is with Side Coax ST-3-10
2021/04/05 (Mon) Continue pumping IVC, cryoclean mixture
2021/04/04 Continue pumping IVC, leak signal falling
2021/04/02 Continue pumping IVC, leak signal falling
2021/04/01 Continue pumping IVC. Leak signal falls slowly
2021/03/31 Find very high leak signal in IVC. Later theorize this was caused by overpressurizing IVC with He. Cryoclean mixture.
2021/03/30 Insulate SQUET flyover cable, hoping to fix short. Close IVC and pump out. Cryoclean mixture.
2021/03/29 (Mon) Open IVC, investigate electrical short, find thermal short
2021/03/28 Continue warmup
2021/03/26 Continue warmup
2021/03/25 Continue warmup, let He into IVC and Cryostat Vacuum Jacket
2021/03/24 Tower stuck at 0.4 K. Test source mover, Tower heats to 0.8 K. Begin warmup to fix electrical short and thermal problem.
2021/03/23 Tower only cools to 0.4 K. Fix power problem in DCRC1(55). Noise in q4 somewhat better; take +11/0V data, resolution bad.
2021/03/22 (Mon) Warm to 3.7 K. q4 short still present. Bump fridge, see q4 short jump around. Start cooldown.
2021/03/21 Discover hard short from q4 FET gate to chassis. Start warming to pump He out of IVC.
2021/03/20 Troubleshoot q4 noise.
2021/03/19 Excess noise in q4
2021/03/18 Take +10/-10V data, see delayed tower heating - from LN2 transfer?
2021/03/17 Take +10/-10V data, see tower heating.
2021/03/16 Take +10/0V data, -11/0V data
2021/03/15 (Mon) Take 0/-15V data, see 60keV line and impact ionization.
2021/03/14 Take +11V/0V data. Take 0/-15V data, notice tower heating.
2021/03/13 Troubleshoot power problems with DCRC1(55). Successfully use HV supply with no excess noise.
2021/03/12 More Side2 connection troubleshooting, take 0/-15 V data using HV on Side2, DIB1 only.
2021/03/11 Take +11V data with DIB1 only.
2021/03/10 Tower → 91 mK after partial warmup and cooldown. Troubleshoot Side2 connection by grounding it through breakout box. Successfully use HV supply.
2021/03/09 Warm tower to 3.5 K, establish Side1/Side2 continuity. Start cooling again.
2021/03/08 (Mon) Start warming MC to recheck Side1/Side2 continuity
2021/03/07 Take -11V data.
2021/03/06 q4 noise spontaneously disappears. Take 11V data, finally see 60keV line. Estimate CCE from muons.
2021/03/05 High noise in q4, can't fix it.
2021/03/04 Try HV biasing but connecting to HV supply produces high noise. Later, high q4 noise.
2021/03/03 Investigate theory that Side2 isn't connected. Take 7V data with Side2 floating.
2021/03/02 High noise in q4 - later it spontaneously disappears. Take 7V data.
2021/03/01 (Mon) Take -7V data. Investigate theory that Side2 isn't connected. Take 7V data.
2021/02/28 Take 1V, 3V, 7V data
2021/02/27 Take 5V data. Establish recommended setup for LHe transfers.
2021/02/26 Take 7V data.
2021/02/25 Take 7V data, trigger thresholds too low.
2021/02/24 Fix unstable baseline problem by depowering SQUIDs. Take 0V test data
2021/02/23 Take 5V data. Unstable baseline problem continues.
2021/02/22 (Mon) Take 5V test data. Unstable baseline problem continues.
2021/02/21
2021/02/20
2021/02/19 Take test data. Unstable charge baselines.
2021/02/18 Start 1K Pot, start circulation. Set up DCRCs.
2021/02/17 Initial LHe transfer. First use of new LHe transfer line.
2021/02/16 (Tue) Transfer LN2
2021/02/12 Cryoclean mixture.
2021/02/11 Cryoclean mixture. Prepare room-temperature HV diverter board.
2021/02/10 Cryoclean mixture.
2021/02/09 Cryoclean mixture.
2021/02/08 (Mon)
2021/02/07
2021/02/06
2021/02/05
2021/02/04
2021/02/03 Cryoclean mixture. Adjust MB bolts.
2021/02/02 (Tue) Cryoclean mixture. Raise MB - problems with bolts.
2021/01/29 Remove fridge clean tent. Pump out fridge and traps.
2021/01/28 Complete tower installation. Tower electrical checkout is good. Begin pumping out IVC.
2021/01/27 Plug in SQUETs for a tower electrical checkout - see shorts at first but then they disappear. Continue tower installation.
2021/01/26 Remove tower and check in clean room - no electrical problems seen at tower, detector, side coax. Begin reinstalling tower.
2021/01/25 (Mon) Continue tower removal
2021/01/22 Tower electrical checkout: find shorts from DIB1 channels to chassis. At tower, it seems like these channels are not connected to detector. Begin deinstallation.
2021/01/21 Finish tower installation, attach SQUETs.
2021/01/20 Continue tower installation
2021/01/19 (Tue) Redo connector for source mover motor coils. Begin reinstalling tower.
2021/01/15 Begin repairing source mover motor coil connectorl
2021/01/14 Continue tower installation. After removing fridge stand do electrical check: find broken source mover motor coil. Deinstall tower.
2021/01/13 Assemble Run 74 tower. Begin tower installation.
2021/01/12 Find broken wirebond on USD1, repair wirebond.
2021/01/11 (Mon) Tower assembly check
2021/01/07 Bend pin on side coax extender so we can re-route the USD1 Side2 bias electrode wire for HV biasing. Arrange wiring for accessories which will bypass the SQUET (source mover motor, endstops, HV electrode).
2021/01/06 Solder source mover coil wires to connector.
2021/01/04 (Mon) Reassemble source mover motor and mount source mover in housing. Electrical check of USD1 detector and side coaxes.
2020/12/30 Make Kapton stripline for wires from second motor coil. New LHe transfer line arrives.
2020/12/23 Re-wind motor coil with broken ends. Electroplate ends of motor coil wire.
2020/12/22 Make Kapton stripline for wires from one motor coil. On the second coil the ends break off - unwind this coil in prep to electroplate again.
2020/12/15 Re-wind second motor coil. Begin electroplating ends of NbTi wire
2020/12/14 Re-wind one source mover motor coil in prep for electroplating
2020/12/11 Disassemble source mover motor and unwind coils

Run 73

Run Det Det Type Source Purpose
73 G101D 100mm Ge HV Unshielded Am, movable Test GeHV with etched side 2 and movable source with solder joint heat sinking. Post pandemic shutdown continuation of Run 72
2020/12/04 Disassemble Run 73 Tower
2020/11/24 Remove tower as 1-person job, using scissor-jack.
2020/11/23 Troubleshoot DAQ after IT changes, get it working.
2020/11/20 Investigate bad phonon channel. Remove 4K and 100mK stages.
2020/11/19 Open IVC, disconnect striplines, remove diverter and SQUETs
2020/11/18
2020/11/16 (Mon) Erect clean tent. Hook up DCRC1 for DAQ tests.
2020/11/13
2020/11/12 Lower main bath.
2020/11/11 Warming up. MC→282 K. Pump out cryostat vacuum jacket.
2020/11/10 Warming up. Finish removing lead/poly shield from lab. MC→265 K.
2020/11/09 (Mon) Warming up. MC→248 K.
2020/11/07 Warming up. Soften cryostat vacuum jacket with N2. MC→93 K.
2020/11/06 Warming up, MC→27 K. Start disassembling lead/poly shield.
2020/11/05 Begin final warmup: stop circulation and 1K Pot, turn on heaters. Tower → 17 K
2020/11/04 Take 0V data (despite confusing DCRC4 IbIs). Troubleshoot DCRC4 IbIs by switching to a different DCRC - behavior persists. Move source to pB inner edge.
2020/11/03 More strange IbIs behavior in DCRC4 channels. Detector temperature ~ 69 mK.
2020/11/02 (Mon) Isolate 1K Pot. Warm Tower with heaters and LEDs, max 7.5 K. Restart 1K Pot. Restart circulation. Tower thermometer → 63 mK.
2020/11/01 IbIs suggests detector temperature much higher than Tower thermometer. Strange “stretched” IbIs in one channel. Stop circulation to try partial warmup.
2020/10/31 Strange IbIs behavior, perhaps due to helium films.
2020/10/30 Take 0V data. Do hot Al flash to try to remove trapped flux.
2020/10/29 Take 0V data. See lower amplitudes, faster fall-times - either trapped flux or helium films? Try faster source moving
2020/10/28 Powercycle DCRC2 to get DAQ working again. View waveforms from Arduino motor driver to test faster source moving. Take 0V data.
2020/10/27 Move source until it hits endstop, at y = -41.936 mm. Take 0V data, +300V drifted data. DAQ crash during data series.
2020/10/26 (Mon) Take -10V drifted data. Try moving source until it contacts endstop, don't quite reach it.
2020/10/25 Take +10V, -100V drifted data
2020/10/24 Take -300V drifted data, 0V data, +300V,+100V drifted data.
2020/10/23 Take +300V,+100V,10V drifted data. Take 0V data. Take -100V,-300V drifted data. Move source to y = -41.010 mm
2020/10/22 Solve HV problem - need to make sure remote-control DCRC is electrically isolated. Take +300V,+100V drifted data. Move source to y = -39.357 mm
2020/10/21 Take +10V drifted data with manual HV drifting. Find Kepco supply is working, reconnect for remote HV. But later discover HV won't go above 1V
2020/10/20 Check HV supply - looks like Kepco supply is dead, later turns out to be OK
2020/10/19 (Mon) Take -300V,-10V drifted, 0V data. Problem with HV, won't go above 1V
2020/10/18 Evidence that Tower Thermometer is reading much higher than detector temperature. IbIs suggests detector temperature is lower an much stabler. Take -300V,-10V,-100V drifted data. Move source to y = -36.116 mm
2020/10/17 Take 0V and +300V,+100V,+10V drifted data, adjusting QET biases constantly.
2020/10/16 Take 0V and -300V,-100V,+100V, +300V drifted data, adjusting QET biases constantly. Move source to y = - 29.501 mm
2020/10/15 Take 0V data. Start using Root macro to adjust QET biases constantly based on Tower temperature. Take -300V, -100V, -10V drifted data. Failed source move because Dwell inadvertently set to 0 ms. Move source to y = -24.077 mm.
2020/10/14 Take 0V and +300V, +100V drifted data, adjusting QET biases during data.
2020/10/13 Take 0V and -300, +300V drifted data. Adjust QET biases during data to correct for temperature variations.
2020/10/12 (Mon) Take -300V drifted data. Try adjusting QET biases during data to correct for temperature variations. Move source to y = -19.712 mm
2020/10/11 Take -100V drifted data.
2020/10/10 Measure IbIs. Create curves for optimal QET bias versus temperature. Take 0V and +100,+300V drifted data.
2020/10/09 Tower = 68 mK. Measure IbIs. Take 0V and +100V drifted data.
2020/10/08 Start 1K Pot and start circulation. MC→31 mK
2020/10/07 Blow out LN2. Initial LHe transfer.
2020/10/06 1K Pot throughput test at 287 K. Transfer LN2.
2020/10/05 (Mon) MC = 286 K. Pump out IVC
2020/10/02 MC → 274 K. Pump out CVJ.
2020/10/01 1K Pot throughput test at 230 K. Continue warmup toward RT
2020/09/30 1K Pot throughput test at 122 K and 130 K. Let more gas into CVJ to accelerate warmup
2020/09/29 1K Pot throughput test at >7K. Let gas into IVC and cryostat vacuum jacket to accelerate MB boiloff.
2020/09/28 (Mon) 1K Pot doesn't work. Apparently leaving it open to IGH during warmup caused it to become contaminated with ice. 1K Pot throughput test at 4 K
2020/09/27 MC unusually warm again, 11 K. Add transfer gas to cool again. Realize DCRCs were on, which apparently was keeping it warm.
2020/09/26 MC unusually warm after LHe transfer. 1K Pot doesn't work. Add exchange gas to IVC to recool, then pump out again
2020/09/25 Initial LHe transfer
2020/09/24 Continue warmup (with no gas added to cryostat vacuum jacket)
2020/09/23 Tower ~ 70 mK, unstable. Stop circulation and 1K Pot to warm up. Add helium to IVC. Use heaters and LEDs to accelerate warming.
2020/09/22 Tower = 62 mK. Measure IbIs. Take +300V, -100V, -300V drifted data. Move source to y = -17.992 mm
2020/09/21 (Mon) Tower = 65 mK. Measure IbIs. Take 0V, +100V drifted data. Temperature excursions.
2020/09/20 Tower → 66 mK. Not as good as last cooldown.
2020/09/19 Start 1K Pot. Start circulation. MC → 31.5 mK (with DCRCs on)
2020/09/18 Initial LHe transfer.
2020/09/17 Cryoclean mixture. Mixture throughput test at 257 K. Perform 1K Pot throughput test. Transfer LN2.
2020/09/16 Cryoclean mixture. Warm to MC = 244 K. Pump out cryostat vacuum jacket overnight.
2020/09/15 Warm to MC = 150 K
2020/09/14 (Mon) Let helium into IVC and cryostat vacuum jacket to accelarate warmup. Pump mixture to dump.
2020/09/13 Tower = 60 mK. Take +300V, -100V drifted data. Move source to y = -12.502 mm. Stop circulation and 1K Pot to begin warmup.
2020/09/12 Tower temperature excursions, 60s-80s mK. Take 0V and 100V data.
2020/09/11 Take 0V data. Spiky triggers. 1K Pot develops partial blockage (perhaps correlated with transfer from Praxair Dewar) Move source to y = -9.988 mm
2020/09/10 Take -300V, -100V drifted data. Move source to y = -5.887 mm, over blocker.
2020/09/09 Tower = 48 mK. Start using ROOT Sequencer. Take +300V, +100V drifted data.
2020/09/08 Take +300V drifted data. MIDAS sequencer lag worse than usual.
2020/09/07 (Mon) Move source to y = -3.969mm. Take 0V data
2020/09/06 Take -100V drifted data at elevated base temperature
2020/09/05
2020/09/04 Take -250V and +250V constant-bias data
2020/09/03 Take -50V drifted data
2020/09/02 Take -250V, -300V drifted data
2020/09/01 Tower = 49 mK. Take -200V data
2020/08/31 (Mon) Tower = 50 mK. Take +200V, +250V, +300V drifted data. Pump cryostat vacuum jacket.
2020/08/30 Tower = 49 mK
2020/08/29 Tower = 49 mK.
2020/08/28 Tower = 49 mK. Take -150V data.
2020/08/27 Tower = 49 mK after zap. Take 0V, -100V data.
2020/08/26 Tower = 53 mK. Take +150V data. Switch turbo pump back to IVC.
2020/08/25 Tower = 53 mK. Take 0V, +100V data.
2020/08/24 (Mon) Tower = 53 mK. Switch turbo to pump on cryostat vacuum jacket instead of IVC.
2020/08/23 Tower = 53 mK.
2020/08/22 Tower = 48 mK. Take 0V data. Fixed EBox purge.
2020/08/21 Tower = 45-48 mK. Take +75V data
2020/08/20 Start 1K Pot, start circulation. MC → 29 mK.
2020/08/19 Let He into cryostat vacuum jacket to boil off bath. Warm fridge to 12 K, see He in IVC. Pump He out of IVC and pump out jacket, do an “initial” LHe transfer.
2020/08/18 Stop circulation and 1K Pot.
2020/08/17 (Mon) Tower = 51 mK. Take 0V, +75V data - no spiky junk seen. Add more 4He to mixture. Try to cool down, stuck at 0.4 K
2020/08/16 Tower = 50-55 mK. Powercycle DCRC1. Take 0V data, see restored gain. Take +100V data, see spiky noise events.
2020/08/15 Tower = 52 mK. Take +75V, 0V data. Reduced gains seen in only DCRC1.
2020/08/14 Tower = 53-60 mK. Take +40V data with no Ebox purge. MIDAS crash. Spiky low-energy junk events seen. Take 0V data. Take +40V, +75V data. Reduced gain seen. Perform another hot Al flash.
2020/08/13 Tower = 55-58 mK. Take -75V. Try source mover (+4 and -4 steps), tower temperature spikes to 760 mK. Take +40V data with Ebox purge off. Perform hot Al flash.
2020/08/12 Tower = 52-58 mK. Take +75V prebiased, -50V, -75V data
2020/08/11 Tower = 52-56 mK. Take +50V, +75V data. MIDAS crash.
2020/08/10 (Mon) Tower = 53-57 mK. Take +40V prebiased data, +50V data
2020/08/09 Tower = 52-58 mK. Take +30V, +40V data
2020/08/08 Tower = 52-58 mK, trouble keeping it low. Perform IbIs at 57 mK. Take -30V, +30V drifted data.
2020/08/07 Take -20V, -30V drifted data. Some difficulty keeping Tower temperature down.
2020/08/06 Tower = 52 mK. Take -20V drifted data.
2020/08/05 Take 15V, 20V drifted data.
2020/08/04 Tower = 51 mK. Take 0V, -15V, 15V drifted data. Instability in HV seen.
2020/08/03 (Mon) Tower = 52 mK. Perform IbIs. Take -10V drifted data. Variations in sequencer lag.
2020/08/02 Tower = 50 mK. Take 10V, -10V drifted data. Test source mover motor control.
2020/08/01 Take 5V drifted data. Test source mover motor control.
2020/07/31 Tower = 51 mK. Take 5V drifted data with sequence variations.
2020/07/30 Tower = 52 mK. Take 0V/10V/0V constant data.Take 5V drifted data with sequence variations
2020/07/29 Tower = 52 mK. Take +5V drifted, -5V drifted, 0V/-10V/0V constant data.
2020/07/28 Tower = 53 mK. Take 0V and 5V drifted data.
2020/07/27 (Mon) Tower = 52 mK. Reattach pi-filters, phonon noise improves. IbIs. Take 0-Volt data. Bake detector for 1 hour.
2020/07/26 Tower = 53 mK. Find that DCRC55(1) powers up again. Take 0-Volt data
2020/07/25 Tower→53 mK. Test external source mover, can control directly from a Windows computer (not through network). Find that DCRC50(3) does not drive LEDs properly. Stop circulation and warm Tower to 1.3 K, then cool fridge again.
2020/07/24 Tower→55 mK. Finish IbIs. Take 0-Volt data, find much worse noise sigma, much lower gain than Run72. (still haven't attached pi-filters)
2020/07/23 Tower→57 mK. Tune some SQUIDs. Seeing ugly noise (still haven't replaced pi-filters). Begin IbIs.
2020/07/22 Tower→61 mK. Start purging E-box with N2
2020/07/21 Tower→62 mK. Recalibrate HV.
2020/07/20 (Mon) Tower 66-70 mK, not stable. Take 0-Volt data, see jagged noise. Note: pi-filters were inadvertently not attached.
2020/07/19 Tower→70 mK. Find that DCRC55(1) will not power up
2020/07/18 Start circulation. MC→32.2 mK
2020/07/17 Initial LHe transfer, using new one-person method.
2020/07/16 Cryoclean mixture, tape plastic over stripline elbow. Transfer LN2.

between-run activity

2020/07/15 Cryoclean mixture
2020/07/14 Leakcheck T-pipe by itself. Try a Q-compound test: it doesn't look like Q-compound reduces a leak, looks as though He goes right through it
2020/07/10 Disassemble E-box again, try leakchecking T-pipe by itself
2020/07/07 Leak still present near stripline elbow
2020/07/01 Move steel plates for PuBe storage shielding into PAN 443. Disassemble E-box to replace stripline elbow KF-flange o-ring.
2020/06/30 Add Q-compound to stripline elbow
2020/06/29 Add Q-compound to stripline elbow
2020/06/25 Leak seen at stripline elbow
2020/06/24 Polish surfaces of KF flange at stripline elbow
2020/06/22 Leak seen at KF flange at stripline elbow
2020/06/19 Clean surfaces of KF flange at stripline elbow
2020/06/17
2020/06/15 Add Q-compound to stripline elbow
2020/06/11 Add Q-compound to stripline elbow
2020/06/08 Add Q-compound to stripline elbow
2020/06/05 Start adding Q-compound to stripline elbow to block leak
2020/06/03 Let IVC up to 1atm and adjust stripline elbow position.
2020/05/21 Cryoclean mixture. Leak near stripline elbow returns. Build hooks for LHe transfer line.
2020/05/20 Cryoclean mixture. Design hooks to hang LHe transfer line for one-person transfers
2020/05/19 Leak check IVC at top of fridge. No leaks seen.
2020/05/18 Attempt to improve stripline tube seal at top of fridge
2020/05/12 Reassemble and test leak detector with repaired pump
2020/03/22
2020/03/21
2020/03/20
2020/03/19
2020/03/18
2020/03/17 Put lab into Covid-19 hibernation

Run 72

Run Det Det Type Source Purpose
72 G101D 100mm Ge HV Unshielded Am, movable Test GeHV with etched side 2 and movable source with solder joint heat sinking
2020/03/16 (Mon)
2020/03/15 Start warmup
2020/03/14 Start circulation. 1K Pot working much better. MC temperature unstable, suggesting helium in IVC
2020/03/13 Initial LHe transfer
2020/03/12 Transfer LN2
2020/03/11 Continue warmup. Flush 1KPot. Cryoclean mixture.
2020/03/10 Attempt to measure capacitance of detector+electrode. Continue warmup, soften cryostat vacuum jacket
2020/03/09 (Mon) Attempt to use source mover, but there are network problems, can't connect.
Begin warmup - switch to one-shot mode, stop 1K Pot
2020/03/08 Tower 72-81 mK
2020/03/07 Tower 59-72 mK. Check HV at Ebox some more.
2020/03/06 Tower = 52 mK. Check HV at the Ebox, investigating too-low Luke gain. Tower temperature rises to 66 mK
2020/03/05 Tower = 57 mK. Take 100V-drifted, -250V-drifted data.
2020/03/04 Tower = 52 mK. IbIs measurements. Take 0V, 300V-drifted, 150V-drifted data
2020/03/03 Tower = 51 mK. Take 200V-drifted data
2020/03/02 (Mon) Build lead/poly tower shield. Take 250V-drifted data.
2020/03/01 Tower = 55 mK
2020/02/29 Still pressure/temperature suddenly fall to lower baseline. Temporary problem with LakeShore bridge thermometer readings
2020/02/28 Take 300V-drifted data
2020/02/27 Tower → 53 mK. Take 300V-drifted data
2020/02/26 Tower → 54 mK. Take 250V- and 300V-drifted data
2020/02/25 Tower → 55 mK. Calibrate remote HV. Take 180V-drifted data
2020/02/24 (Mon) Tower → 57 mK. Take 0-Volt data
2020/02/23 Tower → 58 mK
2020/02/22 Tower → 61 mK
2020/02/21 Tower → 64 mK. Find that Side1pE is inoperative.
2020/02/20 Tower → 67 mK. Test motor coils with DC current.
2020/02/19 Begin circulation. Tower → 72 mK. Test screw terminals.
2020/02/18 Initial LHe transfer
2020/02/17 (Mon) Transfer LN2
2020/02/16
2020/02/15
2020/02/14 Install tower, pump out IVC
2020/02/13 Prepare threaded rods for stack. Assemble tower. Repair one broken detector wirebond.
2020/02/12 Cryoclean mixture.
2020/02/11 Cryoclean mixture. Build SQUET/stripline interposer for source mover, screw terminals, HV electrode wiring.
2020/02/10 (Mon) Cryoclean mixture. Assemble source mover and other accessories in housing. Realize we don’t have threaded rods long enough for 3 housing stack.
2020/02/09
2020/02/08
2020/02/07 Cryoclean mixture. Build twisted-pair substitute for a side coax. Build Al screw terminal test rig for NbTi wiring.
2020/02/06 Cryoclean mixture. Mount LEDs. Remove G132 from its housing.
2020/02/05 Heatsink source mover motor solder joints. Re-wirebond G101.
2020/02/04 Modified G101 arrives, most wirebonds are broken
2020/02/03 (Mon) Disassemble source mover motor
2020/01/27 Checking the longer side coaxes
2020/01/22 Updates on G101c Side2 etching
2020/01/15 Package G101c and ship it to TAMU to have the Side2 channels etched away
2020/01/07 Move howitzer (PuBe storage) from Tate to PAN 443. The PuBe source is now officially ours.
2020/01/06 Update DCRC IP addresses

Run 71

Run Det Det Type Source Purpose
71 G106a 100mm iZIPv6 Unshielded Am, movable test movable source
2019/12/12
2019/12/11 Remove tower.
2019/12/09 (Mon) Begin deinstallation.
2019/12/02 (Mon)
2019/11/26
2019/11/25 (Mon) Move source in -y direction all the way to endstop. Begin warmup.
2019/11/24 Move source further in -y direction.
2019/11/23 Tower reaches 32 mK. Move source 0.5 mm, then another 0.5 mm, determine that it is past the blocker. Move source further in -y direction.
2019/11/22 Tower reaches 33 mK. Move source over a blocker, verify decrease in 60keV rate. Move 0.5 mm further.
2019/11/21 Unjam source mover by increasing current. Start moving source in -y direction.
2019/11/20 Move source into the +y endstop. Determine that source is jammed, won't move backward.
2019/11/19 First clear evidence that source moved. Move source further in +y direction
2019/11/18 (Mon) Start using source mover in multiple short steps.
2019/11/17
2019/11/16 Tower reaches 34 mK. Take some -4/+4V and +4/-4V data.
2019/11/15 Study heating versus current applied to stepper motor.
2019/11/14 Tower reaches 35 mK. Move source to a total of 862 steps, s/b 14.3 mm. Scope measurements suggest motor only moves a few steps each time it's operated.
2019/11/13 Tower reaches 36 mK. Restore phonon collection efficiency with Al flash. No clear evidence yet that source is moving.
2019/11/12 Tower reaches 37 mK. Fix MIDAS biasing glitch. Try moving source farther. Quantify loss in phonon collection efficiency.
2019/11/11 (Mon) Tower reaches 38 mK. Develop hotter LED flash to remove trapped flux in Al fins.
2019/11/10 Tower reaches 39 mK. More bias scan data with incorrect biasing.
2019/11/09 Take bias scan data. MIDAS glitch causes incorrect detector biasing.
2019/11/08 Tower reaches 42 mK. Try source mover. Heats tower above 1 K.
2019/11/07 Tower reaches 43 mK. Take some bias scan data.
2019/11/06 Begin circulation. Tower reaches 46 mK.
2019/11/05 Initial LHe transfer
2019/11/04 (Mon) Transfer LN2
2019/11/01 Open IVC. Polish flanges. Reseal IVC. Begin IVC pumpout.
2019/10/31 Cryoclean mixture
2019/10/30 Blow out LN2. Discover leak into IVC. Begin warmup
2019/10/29 Transfer LN2
2019/10/28 (Mon) Cryoclean mixture
2019/10/25 Repair SQUET ZC-74 with jumpers. Begin IVC pumpout.
2019/10/24 Finish tower installation. More connection problems with SQUET ZC-74
2019/10/23
2019/10/22 (Tue) Receive Tower T1 back from TAMU. Rebuild tower.
2019/10/16
2019/10/15 Tower IT4 breaks! Send 3“ diameter housings to TAMU.
2019/10/14 (Mon) Finish tower assembly
2019/10/11
2019/10/10 (Thu)
2019/10/04 Find broken part of movable source potentiometer. Rebuild source mover with no potentiometer, add endpoint sensors
2019/10/03 Drop main bath. IVC leak not visible at room temperature. Remove tower.
2019/10/02
2019/10/01 Let N2 into cryostat vacuum jacket to accelerate warmup
2019/09/30 (Mon) At 124 K IVC leak smaller but present, probably located below top of main bath fill funnel.
2019/09/29
2019/09/28
2019/09/27
2019/09/26
2019/09/25 Start warmup. Check SQUIDs at 4K.
2019/09/24 Start 1K Pot. Can't cool below 3K, apparently because of IVC leak
2019/09/23 (Mon) Initial LHe transfer. Evidence of leak into IVC. Stepper motor for movable source appears to be stuck.
2019/09/22 Transfer more LN2.
2019/09/21 Successful 77K throughput test. Some issues with electrical checkout.
2019/09/20 Transfer LN2. Throughput test at 300 K (room temperature)
2019/09/19 Repair SQUET ZC-74 with external wires. Finish tower installation. Pump out IVC.
2019/09/18 Cryoclean mixture. Install tower. Connection problems with SQUET ZC-74.
2019/09/17 Cryoclean mixture. Drill larger (18 mil) hole for small lead collimator for bare smoke-detector Am source. Mount movable source. Assemble tower.
2019/09/16 (Mon) Cryoclean mixture. Modify SQUET ZC-74 back to 20 mOhm shunts

Run 70

Run Det Det Type Source Purpose
70 G101c (aka “HV #2”) SNOLAB HV prototype Unshielded Am n,gamma coincidence NR calibration attempt with vacuum interface and modified HV wiring
2019/09/12
2019/09/11
2019/09/10
2019/09/09 (Mon)
2019/09/08
2019/09/07
2019/09/06 Start warmup.
2019/09/05
2019/09/04
2019/09/03
2019/09/02 (Mon)
2019/09/01
2019/08/31
2019/08/30
2019/08/29
2019/08/28
2019/08/27
2019/08/26 (Mon)
2019/08/25
2019/08/24
2019/08/23
2019/08/22
2019/08/21
2019/08/20
2019/08/19 (Mon)
2019/08/18
2019/08/17
2019/08/16
2019/08/15
2019/08/14
2019/08/13
2019/08/12 (Mon)
2019/08/11
2019/08/10
2019/08/09 Remove PuBe from lab
2019/08/08
2019/08/07
2019/08/06
2019/08/05 (Mon)
2019/08/04
2019/08/03
2019/08/02
2019/08/01
2019/07/31
2019/07/30
2019/07/29 (Mon)
2019/07/28
2019/07/27
2019/07/26
2019/07/25
2019/07/24
2019/07/23
2019/07/22 (Mon)
2019/07/21
2019/07/20
2019/07/19 Repair Pfeiffer vacuum gauge, put it back on the turbo pump station.
2019/07/18 Cool back down to base of 40 mK
2019/07/17 Cool down again after fridge failure
2019/07/16 Fridge failure: pumps shut down after power interruption
2019/07/15 (Mon) Activate detector with PuBe for 15.75 hours.
2019/07/14
2019/07/13
2019/07/12
2019/07/11
2019/07/10
2019/07/09
2019/07/08 (Mon)
2019/07/07
2019/07/06
2019/07/05 Activate detector with PuBe for 3.5 hours.
2019/07/04
2019/07/03
2019/07/02
2019/07/01 (Mon) Take 180→400V data w/rate: 2.49V/min.
2019/06/30 Take 180→400V data w/rate: 2.49V/min.
2019/06/29 Take 180→400V data w/rate: 2.49V/min.
2019/06/28 Take 180→400V data w/rate: 2.49V/min.
2019/06/27 Take 180→400V data w/rate: 2.49V/min.
2019/06/26 Take 180→400V data w/rate: 2.49V/min.
2019/06/25 Take 180→400V data w/rate: 2.49V/min. Apply heat to still
2019/06/24 (Mon) Take 180→400V data w/rate: 2.49V/min
2019/06/23 Tower→40mK. Take 180→400V data w/rate 2.49V/min
2019/06/22 Tower→41mK. Take 180→400V data w/rate 2.49V/min
2019/06/21 Tower→41mK. Take 0V data, take 0V unplugged data
2019/06/20 Tower→41mK. Take 100V, 180V, 220V, & 300V data.
2019/06/19 Tower→42mK. Take 180→400V data w/rate: 2.52V/min
2019/06/18 Tower→41mK. Add PuBe source. Take 180→400V data w/rate 2.52V/min
2019/06/17 (Mon) Tower→41mK. Take 0V data & 180→400V w/rate 2.52V/min
2019/06/16 Take 180→400V data w/rate: 2.418V/min
2019/06/15 Tower → 41mK. Take 180→400V data w/rate: 2.418V/min
2019/06/14 Tower → 42mK.
2019/06/13 Tower→42mK. Take 220→400V data w/rate: 2.418V/min & 160→220V data w/rate: 2.418V/min & 140→400V w/rate 2.418V/min & 0V data
2019/06/12 Tower→42mK. Take -200→-400V data w/rate: -2.418V/min & -200→-400V w/rate: -2.796V/min & -180→-400V w/rate: -2.418 & -220→400V w/rate: -2.418V/min
2019/06/11 Tower→43mK. Take 200→400V data w/rate: 2.34V/min
2019/06/10 (Mon) Tower→43mK. Bad data taken (triggering off)
2019/06/09 Tower→44mK. Take 200→400V data w/rate: 2.64 V/min
2019/06/08 Tower → 44mK. Take 200→400V data w/rate: 2.64V/min
2019/06/07 Tower → 45 mK. Take 250→400V data w/rate: 3.9V/min & 200→400V w/rate: 2.76V/min. Build lead/poly fridge shield.
2019/06/06 Tower → 46 mK. Take 200→400V data w/rate: 3.9V/min
2019/06/05 Tower → 46 mK. Take 300→400V data w/rate:3.9V/min
2019/06/04 Tower → 47 mK. Take 300→400V data w/rate: 3.9V/min
2019/06/03 (Mon) Tower → 48mK. Take constant -125V data, 300→400V data w/rate: 3.9V/min
2019/06/02 Tower → 50 mK.
2019/06/01 Tower → 51mK. Take 0V data.
2019/05/31 Tower → 54 mK. Take constant 125V data.
2019/05/30 Tower → 56 mK.Take 0V data.
2019/05/29 Tower → 59 mK. First pulses.
2019/05/28 Tower → 62 mK
2019/05/27 (Mon) Tower → 68 mK. Slow cooling this run. MC = 32 mK
2019/05/26 Tower → 73 mK.
2019/05/25 Start 1K Pot, start circulation. Tower → 78 mK
2019/05/24 LHe transfer
2019/05/23 LN2 transfer
2019/05/22 Cryoclean mixture
2019/05/21
2019/05/20 1K pot blockage, warming back up
2019/05/19 LHe transfer
2019/05/18 LN2 transfer
2019/05/17 Cryoclean mixture.
2019/05/16 Cryoclean mixture.
2019/05/15 Discover blockage at 77K
2019/05/14
2019/05/13 (Mon)
2019/05/12
2019/05/11
2019/05/10 Cryoclean mixture.
2019/05/09 Leak check the Still Pumping Line, find a leak, replace some o-rings.
2019/05/08 Another blockage found. Throughput tests at 77K and 120K, blocked both times. Start warming up again.
2019/05/07 LN2 transfer (third try)
2019/05/06 (Mon) Cryoclean mixture.
2019/05/05
2019/05/04
2019/05/03 Cryoclean mixture.
2019/05/02 Throughput test at 228 K, looks ok. Cryoclean mixture.
2019/05/01 Another fridge blockage. Identify problem with rough pump in leak detector.
2019/04/30 3He pump failure - turns out to be relay in power box, switch to spare. LN2 transfer.
2019/04/29 (Mon) Cryoclean mixture
2019/04/28
2019/04/27
2019/04/26 Discover blockage. Let gas in cryostat vacuum jacket to warm up.
2019/04/25 LN2 transfer
2019/04/24 Raise dewar, begin cleaning mix.
2019/04/23 Tower installation
2019/04/22 (Mon) SQUET modifications. Begin tower install.
2019/04/19 Tower modifications.
2019/04/18 Begin tower deinstallation

Run 69

Run Det Det Type Source Purpose
69 G101c (aka “HV #2”) SNOLAB HV prototype Unshielded Am n,gamma coincidence NR calibration attempt with vacuum interface
2019/04/17
2019/04/16 Room temp electrical check.
2019/04/15 (Mon) Continue warmup. Pump on dewar jacket.
2019/04/14 Continue warmup. Pump on dewar jacket.
2019/04/13
2019/04/12 Continue warmup. Work on 4He pump rebuild.
2019/04/11 Continue warmup.
2019/04/10 Continue warmup. Let helium into cryostat vacuum jacket for fast warmup.
2019/04/09 Electrical checks, find some SQUET damage. Begin warmup.
2019/04/08 (Mon) HV leakage tests, suggest leakage is in SQUETs
2019/04/07 Heat MC to try to avoid QET oscillations
2019/04/06 Take 60 → 120V data.
2019/04/05 Severe HV leakage returns. Evidence of damage to SQUETs.
2019/04/04 Take -300 → -400V data, constant -300V and 300V data with in-run randoms, 300 → 400V data. Lower Am lines visible.
2019/04/03 Tune some SQUIDs. 0V and constant 300V and -300V data.
2019/04/02 IbIs. Try to find good QET settings without oscillations. Tower = 40 mK.
2019/04/01 (Mon)
2019/03/31 Take background data at 300→400 V. mhttpd crash problem seemingly improved by adjusting ODB settings
2019/03/30 Take background data at 300→400 V
2019/03/29 Take background data at 300→400 V
2019/03/28 HV leakage much improved after HV board mod
2019/03/27 Modify HV board: disconnect all HV connections to non-used channels. Discover pA is now broken.
2019/03/26 Severe HV leakage at 400V.
2019/03/25 (Mon) Return PuBe source to Tate.
2019/03/24 HV leakage gets worse
2019/03/23
2019/03/22 HV leakage starts getting worse
2019/03/21 PuBe data. MIDAS mhttpd keeps crashing.
2019/03/20 Bring PuBe source into lab. Start PuBe data taking at 300→400 V.
2019/03/19 Finish lead/poly shield. Bg rate = 46 Hz. Take bg data at HV = 201 V.
2019/03/18 (Mon) Tower reaches 44.1 mK. Take superconducting and normal noise data. Bg rate = 99 Hz. Begin installing lead/poly shield.
2019/03/17 Tower reaches 44.8 mK
2019/03/16 Tower reaches 45.7 mK
2019/03/15 Tower reaches 47.5 mK. Take bg data with increasing HV bias. Calibrate remote HV to 440V.
2019/03/14 Tower reaches 47.8 mK. Test HV to 400 V. Build lead stack for PuBe gamma shield.
2019/03/13 Tower reaches 51.1 mK. Test data with constantly increasing HV bias. Confirm 4He Pump oil filter causes recovery leak.
2019/03/12 Tower reaches 52.5 mK. Test data at 190 V.
2019/03/11 (Mon) Tower reaches 55.7 mK. First pulses. HV test to 200 V
2019/03/10 Tower reaches 57.1 mK
2019/03/09 Tower reaches 61.7 mK
2019/03/08 Tower reaches 65.2 mK
2019/03/07 Start circulation. Tower reaches 71.2 mK
2019/03/06 Initial LHe transfer. HPGe detector size measurements.
2019/03/05 Transfer LN2. Set up HPGe detector for detector size measurements
2019/03/04 (Mon) Install tower, start IVC pumpout
2019/03/03
2019/03/02 Put Cf source on tower in purge cabinet
2019/03/01 Assemble tower.
2019/02/28 Modify tower crown to mount LEDs
2019/02/27 Cryoclean mixture. Mount 100mm electrode. Re-discover that G101c has no internal LEDs - we will need to mount external ones somehow
2019/02/26 Cryoclean mixture. Make 20-mil spacers.
2019/02/25 (Mon)
2019/02/22 Start to mount 100mm external electrode, but realize we don't have the right clamps & spacers.
2019/02/21 Deinstall, remove tower from fridge.
2019/02/19 Disassemble lead stack, stack bricks against West wall.
2019/02/18 Remove wirebonds from Side 2 of GeHV detector (G101c). Return G101c to source safe for activation
2019/02/15 Put GeHV detector (G101c) in source safe with Cf-252 source for activation.

between-run activity

2019/02/07 more DCRC tests.
2019/02/05 Try to reproduce DCRC glitches on the bench.
2019/02/04 Try to reproduce DCRC glitches on the bench.
2019/01/22 Put PuBe source in lab for some measurements with the NaI detectors.
2019/01/02 Put PuBe source in lab for some measurements with the NaI detectors.
2018/12/14 Get PuBe source from Tate, put in 4th floor lead-lined storage.

Run 68

Run Det Det Type Source Purpose
68 S101 (aka “HV #4”) SNOLAB HV prototype Unshielded Am n,gamma coincidence NR calibration attempt with reduced shunt resistances
2018/10/19
2018/10/18
2018/10/17
2018/10/16
2018/10/15 (Mon)
2018/10/14
2018/10/13
2018/10/12
2018/10/11
2018/10/10 Stop circulation. Begin warmup.
2018/10/09
2018/10/08 (Mon)
2018/10/07
2018/10/06
2018/10/05
2018/10/04
2018/10/03
2018/10/02
2018/10/01 (Mon)
2018/09/30
2018/09/29
2018/09/28
2018/09/27
2018/09/26
2018/09/25
2018/09/24 (Mon)
2018/09/23
2018/09/22 Start taking -125 V data
2018/09/21
2018/09/20
2018/09/19
2018/09/18
2018/09/17 (Mon)
2018/09/16
2018/09/15
2018/09/14
2018/09/13
2018/09/12
2018/09/11 IbIs data at -80V
2018/09/10 (Mon) IbIs data at -80V
2018/09/09 Take -80V bkg data.
2018/09/08 Take -80V bkg data.
2018/09/07 Take -80V bkg data.
2018/09/06 Take -80V PuBe data with PuBe removed from paraffin barrel
2018/09/05 Take -80V PuBe data with PuBe removed from paraffin barrel
2018/09/04 Take -80V PuBe data.
2018/09/03 (Mon) Take -80V PuBe data.
2018/09/02 Take -80V bkg data.
2018/09/01 Take -80V bkg data.
2018/08/31 Take -70,-80 V bkg data
2018/08/30 Take -Vbias scan bkg data.
2018/08/29 Take +/-40V bkg data.
2018/08/28 Take 40V PuBe/bkg data.
2018/08/27 (Mon) Take 40V PuBe data.
2018/08/26 Take 40V PuBe data.
2018/08/25 Take 40V PuBe data.
2018/08/24 Take 40V PuBe data and NaI calibration data.
2018/08/23 Take 40V PuBe data.
2018/08/22 Take 40V PuBe data.
2018/08/21 Take 40V PuBe data.
2018/08/20 (Mon) Take 40V bkg and PuBe data.
2018/08/19 Take 40V bkg data.
2018/08/18 Take 40V bkg data.
2018/08/17 Take 40V bkg data.
2018/08/16 Take NaI calibration data. Take 40V bkg data.
2018/08/15 Take 40V PuBe and bkg data.
2018/08/14 Take 40V PuBe data.
2018/08/13 (Mon) Take 40V PuBe data.
2018/08/12 Take 40V PuBe data.
2018/08/11 Take 40V PuBe data.
2018/08/10 Take 40V PuBe data.
2018/08/09 Take 40V PuBe data.
2018/08/08 Take 40V bkg and PuBe data
2018/08/07 Take 40V bkg data.
2018/08/06 (Mon) Cool to base. Take bias scan data.
2018/08/05
2018/08/04
2018/08/03
2018/08/02 Blow out LN2. 77K leak check, electrical check, throughput test all OK.Initial LHe transfer.
2018/08/01 Cryoclean mixture. Transfer LN2.
2018/07/31 More leak checks, none seen. Cryoclean mixture.
2018/07/30 (Mon) Room temperature leak checks from bath to IVC, fridge lines to IVC, fridge top to IVC, none seen
2018/07/27 Electrical check @ 210 K, looks OK. Leak check from bath to IVC, none detected.
2018/07/26 Warmup. Accidentally let air into IVC @ 9K.
2018/07/25 Continue thermal tests of helium in IVC
2018/07/24 Watch changes in temperatures and IVC pressure during transfers, investigating helium leak into IVC
2018/07/23 (Mon) Suspend circulation and 1K Pot, warm tower with heaters, see evidence of helium in IVC again
2018/07/22 Base becomes unstable, Tower rises above 100 mK
2018/07/21 Helium film noise now gone, take data at 0V and 40V
2018/07/20 Cool to base again, reach 29.5 mK at tower
2018/07/19 Warm fridge while pumping on IVC, thermal connection broken. Clear indication of helium in IVC
2018/07/18 Suspend circulation and 1KPot, warm fridge with IVC isolated - thermal connection to bath evident
2018/07/17 Take 0V and 40V data with helium film noise present. 1K Pot failure overnight.
2018/07/16 (Mon) Discover jagged noise, later identified as helium films
2018/07/15
2018/07/14
2018/07/13
2018/07/12
2018/07/11
2018/07/10 Tower base around 33 mK
2018/07/09 (Mon) Mount NaI detectors. Take IbIs data @ 40V
2018/07/08 Finish reestablishing circulation, Tower reaches 30 mK with DCRCs on
2018/07/07 Slowly reestablishing circulation. Seems stuck at 1K, then pressures start oscillating, then finally starts to cool again, reaches 29 mK
2018/07/06 Try closing then reopening V6: doesn't help. Stop circulation, warm to 8 K, restart circulation. Tower falls to 200 mK but then rises again. Stop circulation again. Throughput test at 10 K. Restart circulation slowly - Tower never falls below 1 K
2018/07/05 Tower temperature rises to 60 mK. Stop circulation, warm to 6 K, restart circulation. Can't cool below 1 K
2018/07/04 Tower temperature wavering between 32 and 36 mK
2018/07/03 1K Pot runs dry, fridge failure. Restart circulation. Cool to 30 mK. Lower transfer stick a little early during LHe transfer, thermal shock. After that, base temperature less stable.
2018/07/02 (Mon) 1K pot still unstable, needle valve needs to be tweaked open every several hours. 50V data with and without flashing
2018/07/01 HV-scan data
2018/06/30 Take 70V data
2018/06/29 Take noise data, take 0V pulse data, bring PuBe neutron source into lab. LHe transfer without blowoff using long extender.
2018/06/28 Tower <35 mK with DCRCs off. 1K pot semi-unstable. Construct 1T lead shield.
2018/06/27 Tower 44-45 mK with DCRCs on. Still heating reduces temperature to 37 mK but then uncontrolled rise. One-shot test.
Build lead/poly shield
2018/06/26 Turn on DCRCs. Tower 45-50 mK
2018/06/25 (Mon) Add 13.7 mbar 4He to mixture. Restart circulation. Overnight temperature oscillations, 36-55 mK
2018/06/24 Tower around 80 mK
2018/06/23
2018/06/22 Overnight temperature oscillations, 37-52 mK. One-shot test. Restart circulation
2018/06/21 Clean 4He cold trap. Restart circulation.
2018/06/20 Cooling power test, much worse than it should be
2018/06/19 Adjust still heat, 1K Pot, can't get base better than 38 mK (with DCRCs off)
2018/06/18 (Mon) Start DCRCs. About 30 min later Tower rises to 100 mK.
2018/06/17 Tower stable overnight ~ 38 mK
2018/06/16 Tower stable overnight ~ 40 mK
2018/06/15 More tower temperature oscillations
2018/06/14 Tower temperature oscillates between 40 and 52 mK
2018/06/13 Restart circulation.
2018/06/12 Stop and restart circulation. Try to improve base temperature
2018/06/11 (Mon) Restart circulation. Tower reaches 35 mK. But after transfer Tower rises to 100 mK.
2018/06/10
2018/06/09 Transfer LHe without “precool” (waiting for plume)
2018/06/08 Stop circulation
2018/06/07 1K Pot failure, circulation pressures rise above 1 bar. Struggle with 1K Pot
2018/06/06 1K Pot problems, keeps running dry
2018/06/05 Attempt 100V data with flashing
2018/06/04 (Mon) Set up remote biasing, take bias-sweep data
2018/06/03 Tower reaches 35.2 mK. Take data at 60V.
2018/06/02 Take data at 80V
2018/06/01 Take data at 100V
2018/05/31 IbIs measurements. Begin nitrogen purge at ebox.
2018/05/30 Automated IbIs measurements at 0V. Tower reaches 38.8 mK
2018/05/29 See first pulses. Troubleshoot HV biasing.
2018/05/28 (Mon) Tower reaches 41.4 mK
2018/05/27 Tower reaches 44.7 mK
2018/05/26 Tower reaches 46.5 mK
2018/05/25 Start circulation. Tower reaches 51.3 mK
2018/05/24 Initial LHe transfer
2018/05/23 Cryoclean mixture. Transfer LN2
2018/05/22 Cryoclean mixture
2018/05/21 (Mon)
2018/05/18 Replace o-rings on 1K Pot needle valve shaft
2018/05/17
2018/05/16 1K Pot not working. Begin warmup
2018/05/15 Initial LHe transfer
2018/05/14 (Mon) Cryoclean mixture. Transfer LN2
2018/05/13
2018/05/12 Fridge blockage. Begin warmup.
2018/05/11 Cryoclean mixture. Transfer LN2
2018/05/10 Open IVC and look for touch - none found. Seal and pump out IVC
2018/05/09 Warm up fridge
2018/05/08 MC will not cool much below 4K. Suspect a touch from 4K to 100mK stages
2018/05/07 (Mon) Start 1K Pot, cooling slow, 1K pot cools only to 3.5 K, MC to 4.5 K
2018/05/06
2018/05/05
2018/05/04 Initial LHe transfer. 250L LHe storage Dewar vacuum failure/boiloff.
2018/05/03 Polish bottom flange of IVC middle can. Cryoclean mixture. Transfer LN2. LN2 transfer is slow.
2018/05/02
2018/05/01 Blow out LN2. Discover leak from bath to IVC. Begin warmup.
2018/04/30 (Mon) Cryoclean mixture. Transfer LN2
2018/04/29
2018/04/28 Pump out cryostat vacuum jacket
2018/04/27 Remove tower, determine that Side Coax ST-3-9 is causing the short to chassis.
Swap out side coax, reassemble and install tower, pump out IVC, cryoclean mixture
2018/04/26
2018/04/25 Discover short to chassis (again) from DIB3 QETA. Blow out LN2. Begin warmup.
2018/04/24 Cryoclean mixture. Transfer LN2.
2018/04/23 (Mon) 300 K throughput test. Remove tower, remove DIB3 pin2 wirebond to repair short. Reinstall tower, pump out IVC
2018/04/22
2018/04/21
2018/04/20 Discover short to chassis from DIB3 QETA. Blow out LN2. Throughput low, partial blockage. Begin warmup.
2018/04/19 Redo indium seal at IVC bottom. Transfer LN2.
2018/04/18 Continue warmup. IVC leak not present at 235 K. Cryoclean mixture.
2018/04/17 Blow out LN2. Discover leak from bath to IVC. Begin warmup.
2018/04/16 (Mon) Cryoclean mixture. Transfer LN2.
2018/04/15
2018/04/14
2018/04/13 Cryoclean mixture. Finish tower installation. Some bad pin connections on SQUET ZC-74. Pump out IVC.
2018/04/12 Cryoclean mixture. Install tower.
2018/04/11 Cryoclean mixture. Assemble tower.

Run 67

Run Det Det Type Source Purpose
67 USD1 USD-Ge 100mm 4Q 4 Am-241 Re-test charge performance
2018/04/10
2018/04/09 (Mon) Remove tower
2018/04/08
2018/04/07
2018/04/06 Modify wirebonding on SQUET ZC-24. Open IVC and begin disassembly
2018/04/05
2018/04/04
2018/04/03 Evidence that some mixture was lost.
2018/04/02 (Mon) Stop circulation, begin warmup.
2018/04/01
2018/03/31 1K Pot failure. Circulation pressures rise above 1 atm.
2018/03/30
2018/03/29
2018/03/28
2018/03/27
2018/03/26 (Mon)
2018/03/25
2018/03/24
2018/03/23
2018/03/22
2018/03/21
2018/03/20 Blow out LN2. First LHe transfer.
2018/03/19 (Mon) Finish warm-up. Redo lower IVC seal. LN2 transfer.
2018/03/18
2018/03/17
2018/03/16
2018/03/15 Fridge blockage discovered. Blow out LN2. Discover another big leak into the IVC.
2018/03/14 Transfer LN2 (with no mixture in fridge), cryoclean mixture. 77K short not present this time.
2018/03/13 Deinstall tower, change side coax and tower face orientation, reinstall tower, pump IVC, cryoclean mixture
2018/03/12 (Mon)
2018/03/11 Let nitrogen into cryostat vacuum jacket to accelerate warmup.
2018/03/10
2018/03/09 More test signal calibration data. Let helium into cryostat vacuum jacket for fast warmup.
2018/03/08 Take test signal calibration and bias sweep data.
2018/03/07 More difficulty cooling to 1K, attempt to circulate. Probably leak to IVC is too big.
2018/03/06 Take 4K data. Difficulty cooling to 1K.
2018/03/05 (Mon) Blow out LN2. Evidence of leak from main bath to IVC. Initial LHe transfer.
2018/03/04 Successful 77K throughput test. Short to chassis still present but smaller. Transfer more LN2 (no LHe available)
2018/03/03 Cryoclean mixture. Transfer LN2.
2018/03/02 Remove tower. Examine possibilities for 77K short. Swap out the SQUET. More side coax wirebond breaks, fix these. Reinstall tower, pump IVC.
2018/03/01 Transfer LN2. Discover fridge blockage. Short to chassis in charge wiring appears at 77K. Soften vacuum in cryostat jacket to start warming fridge.
2018/02/28 Cryoclean mixture, install tower, pump out IVC.
2018/02/27 Joseph Mammo arrives from USD. Find broken wirebonds on side coaxes, fix these. Assemble tower. Cryoclean mixture.
2018/02/26 (Mon) Disassemble Run66 tower. USD1 electrical check.
2018/02/22 Examine USD1 detector, add a double wirebond

between-run activity

2018/02/07
2018/02/06
2018/01/31
2018/01/26 Reinforce connector ends of new striplines. Begin to reassemble fridge cans.
2018/01/25 Install Striplines 41,43,48
2018/01/24 Prepare Striplines 41,43,48 for installation
2018/01/23 Remove Striplines 19,20,27
2018/01/22 (Mon) Polish end of stripline tube
2018/01/19 Prepare to remove Striplines 19,20,27

Run 66

Run Det Det Type Source Purpose
66 G101c (aka “HV #2”) SNOLAB HV prototype none Test with reduced shunt resistances. n,gamma coincidence NR calibration attempt.
2018/01/18 Remove tower and put in clean room
2018/01/17 Begin tower deinstallation
2018/01/16 (Tue) Finish removing lead/poly shield, lower main bath, open IVC. (10 days to warm up without softening main bath vacuum)
2018/01/12
2018/01/11
2018/01/10
2018/01/09
2018/01/08 (Mon) Return PuBe source to Tate
2018/01/07
2018/01/06
2018/01/05
2018/01/04 Pump mixture to dump. Continue warmup.
2018/01/03 IbIs and noise data on two Side 2 channels with shorted shunt resistors. Begin warmup
2018/01/02 Remove HV box, switch to 2-sided readout
2018/01/01 (Mon)
2017/12/31
2017/12/30
2017/12/29 Tests with floating the phonon grounds. Possibly damaged a SQUID
2017/12/28 Test triggering from multiple DCRCs
2017/12/27 Take overnight 70V data with flashing and in-series randoms
2017/12/26 Take overnight -70V data with flashing
2017/12/25 (Mon) Take overnight 70V data with flashing
2017/12/24 Take overnight 70V data with flashing
2017/12/23 Take overnight 70V data with flashing
2017/12/22 Take overnight 70V data with flashing
2017/12/21
2017/12/20 Modify triggerfe pileup rejection algorithm, take test data. Tests with partial HV (disconnect some channels from bias).
2017/12/19 Take noise data
2017/12/18 (Mon) Warm tower to 53 mK and take test data. Noise data in s/c
2017/12/17
2017/12/16 Test data with half the channels flipped (reverse polarity). Noise data in superconducting state
2017/12/15 Randoms rate scan with reduced trace lengths.
2017/12/14 HV scan data. Test data with no pileup rejection.
2017/12/13 NaI pulse data taken through DCRC.
2017/12/12 Strong PuBe activation. Randoms-only test.
2017/12/11 (Mon) Test triggering on different channels. Strong PuBe activation.
2017/12/10 PuBe weak activation. Randoms rate scan. Test signal frequency scan, triggering on test signal
2017/12/9 PuBe weak activation. Test triggering on different channels
2017/12/8 PuBe weak activation
2017/12/7 PuBe weak activation. Clean Pfeiffer vacuum gauge (gauge on turbo pump)
2017/12/6 PuBe weak activation
2017/12/5 Automated IbIs. Get PuBe source from Tate.
2017/12/4 (Mon) Choose standard QET biases. Humid day, used E-box purge.
2017/12/3 Noise versus HV data
2017/12/2 Noise versus HV data
2017/12/1 Replace power supply in cryo computer (vuk-01), working now.
2017/11/30 Remote HV control work. Reach 22 mK.
2017/11/29 Problems with cryo computer (vuk-01). Automated IbIs at 45 V. Reach 23 mK
2017/11/28 Automated IbIs at 45 V
2017/11/27 (Mon) Complete 0V IbIs. Automated IbIs at 45 V. Install south shield frame with NaI detectors.
2017/11/26 MIDAS DAQ programs won't stay on, DCRCs stuck, require powercycle. Automated IbIs
2017/11/25 Automated IbIs. Reach 24 mK
2017/11/24 Automated IbIs
2017/11/23 Automated IbIs. Reach 26 mK
2017/11/22 Automated IbIs
2017/11/21 Raise front-end gains. Automated IbIs, remote HV control.
2017/11/20 (Mon) Automated IbIs. Remote HV control via DCRC.
2017/11/19 Automated IbIs. Reach 29 mK
2017/11/18 Automated IbIs. MIDAS freeze-ups during sequences.
2017/11/17 Tune SQUIDs. HV scan. Automated IbIs. Reach 33 mK
2017/11/16 Begin cooling to base, 38 mK
2017/11/15 Initial LHe transfer
2017/11/14 Cryoclean mixture, transfer LN2
2017/11/13 (Mon) Install tower, pump out IVC
2017/11/12
2017/11/11
2017/11/10 Wirebond repairs on G101c (HV#2). Assemble tower.
2017/11/09 Fridge reassembly. Modify SQUET ZC-31 to reduce shunt resistances.
2017/11/08 Re-attach 600mK rod. Modify SQUET ZC-74 to reduce shunt resistances.

Run 65

Run Det Det Type Source Purpose
65 S1502 6inch Si 5Q device 4X Am Test 6” detector quality and modifications to 6“ setup
2017/11/07 Remove tower. Modify SQUET ZC-68 to reduce shunt resistances. Design circuit to control external HV bias with a DCRC.
2017/11/06 (Mon) Lower cryostat
2017/11/05
2017/11/04
2017/11/03 Test SQUET re-wirebonding
2017/11/02 Test different flashing modes. Stop circulation, begin warmup
2017/11/01 Test different flashing modes
2017/10/31 Test different flashing modes
2017/10/30 (Mon) Test different flashing modes
2017/10/29
2017/10/28
2017/10/27 Test external LEDs.
2017/10/26 Test external LEDs. Tower = 83 mK
2017/10/25
2017/10/24
2017/10/23 (Mon)
2017/10/22
2017/10/21
2017/10/20 Tower → 86 mK.
2017/10/19 Begin recording data. Tower → 0.22 K
2017/10/18 Begin circulating. Tower falls only to 0.88 K. Test DCRC52(6).
2017/10/17 Transfer LN2, blow out LN2, initial LHe transfer. Verify no interchannel shorts. Pumped out IVC a little too early, Tower ~ 10 K.
2017/10/16 (Mon) Seal and pump out IVC
2017/10/13 Cryoclean mixture. Looks like some mixture was lost during oil change (780→740 mbar). Begin tower installation.

Run 64

Run Det Det Type Source Purpose
64 S1502 6inch Si 5Q device 4X Am Test 6” detector quality and modifications to 6“ setup
2017/10/12 Test new DCRC from Berkeley, DCRC52(6). Fix shorts on S1502.
2017/10/11 Disassemble tower. Test and pump out 3He pump
2017/10/10 Change oil in 3He pump. DCRC stuck-output tests
2017/10/09 (Mon) Begin cryopumping 3He pump for oil change. DCRC stuck-output tests.
2017/10/08 DCRC stuck-output tests
2017/10/07 DCRC stuck-output tests
2017/10/06 DCRC stuck-output tests. Discover some charge trace lengths are bad, lead to output freezing.
2017/10/05 Deinstall tower, DCRC stuck-output tests
2017/10/04 DCRC stuck-output tests
2017/10/03 DCRC stuck-output tests
2017/10/02 (Mon) Measure mixture pressure in dump
2017/10/01 Let N2 into cryostat vacuum jacket to accelerate warmup.
2017/09/30 Pump mixture out of fridge. Let He into cryostat vacuum jacket to accelerate warmup.
2017/09/29 Stop circulation, begin warmup.
2017/09/28
2017/09/27
2017/09/26
2017/09/25 (Mon) Confirm all 5 channels active. Try to get 3 dcrcs working.
2017/09/24 Bake detector overnight with UV LEDs.
2017/09/23 Tower reaches 65 mK. First charge pulses seen, no ringing. Bake detector for 7 hours with UV LEDs.
2017/09/22 Cool to base: 69 mK at tower, 52 mK at MC
2017/09/21 Blow out LN2. Successful throughput @ 92K. Initial LHe transfer. 250L storage Dewar lost its vacuum and boiled off a bunch of LHe.
2017/09/20 Transfer LN2, with mixture in fridge. Electrical check.
2017/09/19 Cryoclean mixture
2017/09/18 (Mon) Discover He-3 pump is very loud. Deciding what to do about it. Successful room-temperature throughput test.
2017/09/15 Swap SQUETs to solve LED wiring problem. Begin pumping IVC
2017/09/14 Install tower: discover that electrode LED wiring is incompatible with SQUET. Install warming tube for helium recovery.
2017/09/13 Finish tower assembly. Begin tower installation. Finish assembling warming tube for helium recovery.
2017/09/12 Add copper foil shielding to side coaxes and extenders
2017/09/11 (Mon) Assemble 150mm tower with new side coax extenders
2017/09/08 Repair wirebond on detector. Assemble detector&electrode stack. Fix some inter-channel shorts. Begin assembling warming tube for helium recovery.
2017/09/07 Assemble electrode/sources/LEDs. Re-space clamps on detector, breaking one wirebond
2017/09/06 Adjust collimator for bare Am source
2017/09/05 (Tue)
2017/09/01 Finish reassembling fridge. Modify 150mm electrode for 4 Am sources
2017/08/31 Begin reassembling fridge
2017/08/30 Disassemble fridge to remove 600mK rod
2017/08/29
2017/08/28 (Mon) Finish wirebonding S1502. Also some surgery
2017/08/18 Begin wirebonding S1502
2017/08/17 Flip S1502 (150mm/6inch/6” 5Q TAMU device) in its housing

Run 63

Run Det Det Type Source Purpose
63 G132 SNOLAB Ge iZIP Pathfinder (iZIPv7) Am, Pb Verify Tc recipe and characterize Ge iZIP for SNOLAB project
2017/09/08 More Run 63 post-mortem
2017/09/07
2017/09/06 More Run 63 post-mortem
2017/09/05 (Tue) More Run 63 post-mortem. Broke some wirebonds on a side coax.
2017/09/01
2017/08/31
2017/08/30 Run 63 post-mortem. Disassemble and examine a SQUET (broke some wirebonds)
2017/08/29 Finish tower deinstallation
2017/08/28 (Mon)
2017/08/25 Begin deinstallation
2017/08/24
2017/08/23
2017/08/22 Pump out cryostat vacuum jacket
2017/08/21 (Mon) Remove lead/poly shield
2017/08/18
2017/08/17 Fridge at 237 K, put N2 in cryostat vacuum jacket
2017/08/15
2017/08/14 (Mon)
2017/08/13 Pump mixture to dump
2017/08/12
2017/08/11 Begin warmup
2017/08/10
2017/08/09
2017/08/08
2017/08/07 (Mon) Ship G114 to SLAC
2017/08/06
2017/08/05
2017/08/04
2017/08/03 Inspect S1502 (150mm/6inch/6“ 5Q TAMU device), find DIB pads don't line up
2017/08/02
2017/08/01
2017/07/31 (Mon)
2017/07/30
2017/07/29
2017/07/28
2017/07/27
2017/07/26
2017/07/25
2017/07/24 (Mon)
2017/07/23
2017/07/22
2017/07/21
2017/07/20
2017/07/19
2017/07/18
2017/07/17 (Mon)
2017/07/16
2017/07/15
2017/07/14
2017/07/13
2017/07/12 Tower = 26 mK. Start IbIs measurements.
2017/07/11 Tower = 27 mK. Finish all 4 lead shield walls.
2017/07/10 (Mon) Two phonon channels not working on DCRC4
2017/07/09
2017/07/08
2017/07/07 Build half of lead/poly shield. Event rate 148 → 134 Hz
2017/07/06 Notice phonon baseline rise when bias applied
2017/07/05 Measure Tc's
2017/07/04
2017/07/03 (Mon) Cool to base, 29.2 mK. Measure a couple of Tc's
2017/07/02
2017/07/01
2017/06/30 Throughput OK. Blow out LN2, initial LHe transfer.
2017/06/29 Room temperature throughput check. Transfer LN2.
2017/06/28 Blow out LN2 and begin warming fridge.
2017/06/27 Transfer LN2. Fridge blockage.
2017/06/26 (Mon) Pump out IVC, leak check. Raise main bath.
2017/06/23 Finish tower installation. Reroute broken stripline trace.
2017/06/22 Find shorts from phonon channels to chassis as seen at SLAC. Begin installing tower.
2017/06/21 Install Am and Pb internal sources, external LEDs. Assemble tower
2017/06/20 Repair wirebonds on side coaxes
2017/06/19 (Mon) Discover broken charge channels on side coaxes
2017/06/16 Detector G132 arrives from SLAC

Run 62

Run Det Det Type Source Purpose
62 S101 (aka “HV #4”) SNOLAB HV prototype Unshielded Am First Si HV prototype test for SNOLAB project
2017/06/20
2017/06/19 (Mon)
2017/06/16
2017/06/15
2017/06/14
2017/06/13 Begin warmup
2017/06/12 (Mon)
2017/06/11
2017/06/10
2017/06/09
2017/06/08
2017/06/07
2017/06/06
2017/06/05 (Mon)
2017/06/04
2017/06/03
2017/06/02
2017/06/01
2017/05/31
2017/05/30
2017/05/29 (Mon)
2017/05/28
2017/05/27
2017/05/26
2017/05/25
2017/05/24
2017/05/23
2017/05/22 (Mon)
2017/05/21
2017/05/20
2017/05/19
2017/05/18
2017/05/17
2017/05/16
2017/05/15 (Mon)
2017/05/14
2017/05/13
2017/05/12
2017/05/11
2017/05/10
2017/05/09
2017/05/08 (Mon)
2017/05/07
2017/05/06
2017/05/05
2017/05/04
2017/05/03
2017/05/02
2017/05/01 (Mon)
2017/04/30
2017/04/29
2017/04/28
2017/04/27
2017/04/26
2017/04/25
2017/04/24 (Mon)
2017/04/23
2017/04/22
2017/04/21
2017/04/20
2017/04/19 Install NaI detectors on South lead/poly shield wall
2017/04/18
2017/04/17 (Mon)
2017/04/16
2017/04/15
2017/04/14
2017/04/13
2017/04/12
2017/04/11
2017/04/10 (Mon)
2017/04/09
2017/04/08
2017/04/07
2017/04/06
2017/04/05
2017/04/04
2017/04/03 (Mon)
2017/04/02
2017/04/01
2017/03/31
2017/03/30
2017/03/29
2017/03/28
2017/03/27 (Mon)
2017/03/26
2017/03/25
2017/03/24
2017/03/23
2017/03/22
2017/03/21
2017/03/20 (Mon)
2017/03/19
2017/03/18
2017/03/17
2017/03/16
2017/03/15
2017/03/14
2017/03/13 (Mon)
2017/03/12
2017/03/11
2017/03/10
2017/03/09
2017/03/08
2017/03/07
2017/03/06 (Mon) Build lead shield
2017/03/05
2017/03/04
2017/03/03
2017/03/02
2017/03/01
2017/02/28
2017/02/27 (Mon)
2017/02/26
2017/02/25
2017/02/24
2017/02/23
2017/02/22 Switch to HV mode
2017/02/21
2017/02/20 (Mon)
2017/02/19
2017/02/18
2017/02/17
2017/02/16
2017/02/15
2017/02/14
2017/02/13 (Mon) IbIs work
2017/02/12
2017/02/11
2017/02/10
2017/02/09 Assess non-functioning channels
2017/02/08
2017/02/07
2017/02/06 (Mon)
2017/02/05
2017/02/04
2017/02/03
2017/02/02 Tune DIB1 SQUIDs
2017/02/01 Measure Tc's on working DIB3 channels using DC method. Tower reaches 40 mK (DCRCs powered)
2017/01/31 Investigate heating problem with DIB1 LEDs.
2017/01/30 (Mon) Measure Tc's on working DIB4 channels using DC method. Tower reaches 41 mK (DCRCs powered)
2017/01/29 Tower reaches 45 mK (DCRCs powered)
2017/01/28 Tower reaches 47 mK (DCRCs powered)
2017/01/27 Problems with DCRC3. Tower reaches 49 mK (DCRCs powered)
2017/01/26 Measure DIB1 Tc's using DC method. Find that some channels seem to be broken. Tower reaches 61 mK (DCRCs powered)
2017/01/25 First pulses seen. Attempt Tc measurement but test signal seems to drive TESs normal. Tower reaches 65 mK (DCRCs powered)
2017/01/24 Cool to base. MC reaches 34 mK, Tower reaches 67 mK. Tower cools slowly in this run…
2017/01/23 (Mon) LN2 transfer. This time good throughput. LHe transfer.
2017/01/22
2017/01/21 Room-temperature throughput test. Cryoclean mixture.
2017/01/20 Warm fridge again. Notice high levels of contamination after cryocleaning. Cryoclean mix again.
2017/01/19 Warm fridge to near room temp, LN2 transfer, another blockage seen.
2017/01/18 Blow out LN2, discover blockage (failed throughput test). Start warming fridge.
2017/01/17 (Tue) Transfer LN2
2017/01/16
2017/01/15
2017/01/14
2017/01/13
2017/01/12
2017/01/11 Raise main bath
2017/01/10 Small leak at top of stripline tube
2017/01/09 (Mon) Finish installing tower, begin pumping IVC
2017/01/08
2017/01/07
2017/01/06 Begin tower installation
2017/01/05 Repair broken wirebond, assemble tower
2017/01/04 Assemble external LED holder, drill LED window hole in source holder plate.
Wirebond break during stack assembly.
2017/01/03 (Tue)
2016/12/30 Finish drilling second holes in four fridge bath ports to further dampen Taconis oscillations.
Build source holder adapter for unshielded 241Am source.
2016/12/29 Repair broken wirebond
2016/12/28 (Wed) Re-wirebond S101. Receive unshielded 241Am source from UCB.
2016/12/21
2016/12/20 S101 initial electrical check
2016/12/19 (Mon) Detector S101 arrives at UMN

Run 61

Run Det Det Type Source Purpose
61 G101c (aka “HV #2”) SNOLAB HV prototype none First HV prototype test for SNOLAB project
2016/12/21
2016/12/20 Remove tower
2016/12/19 (Mon) Lower main bath, open IVC, begin tower removal
2016/12/18
2016/12/17
2016/12/16 Begin warmup
2016/12/15
2016/12/14
2016/12/13
2016/12/12 (Mon) Take 90V pulse data
2016/12/11
2016/12/10 Noise data versus HV with varied pre-biasing schemes. Take 75V pulse data
2016/12/09 Noise data versus HV with varied pre-biasing schemes. Take 60V pulse data
2016/12/08 Elevate tower to 67 mK and study IbIs & 10kHz oscillations. Take 45V pulse data
2016/12/07 Take 15V pulse data
2016/12/06 Take 30V pulse data
2016/12/05 (Mon) Switch to 1-sided HV mode, full IbIs at 0V
2016/12/04 22Na data with external NaI trigger for Compton study
2016/12/03 22Na data for Compton study
2016/12/02 IbIs stability studies. Take 2-sided data with modified (higher) QET bias settings.
2016/12/01 IbIs stability studies. Take 2-sided data.
2016/11/30 Full IbIs measurements.
2016/11/29 Full IbIs. Take 2-sided 0V data
2016/11/28 (Mon) Mini-IbIs stability
2016/11/27
2016/11/26
2016/11/25
2016/11/24
2016/11/23
2016/11/22 PuBe neutron activation, 3 hours.
2016/11/21 (Mon)
2016/11/20
2016/11/19
2016/11/18
2016/11/17
2016/11/16 Mini-IbIs and dIb/dIs for Rn, Rp, Rtes, compare&contrast
2016/11/15 Mini-IbIs for Rn, Rp, Rtes
2016/11/14 (Mon) Coincidence data with 88Y and external NaI source as trigger
2016/11/13
2016/11/12 Coincidence data with 88Y and external NaI source as trigger
2016/11/11 Coincidence data with 88Y and external NaI source as trigger
2016/11/10 DCRC hiccup, readjust QET biases, take pulse data (good dataset)
2016/11/09 Switch back to 2-sided setup, take pulse data
2016/11/08 PuBe neutron activation, 4 hours. Long-trace data to study muon pulses
2016/11/07 (Mon) Noise data versus HV bias with pre-biasing (aka overshooting)
2016/11/06 Noise data versus HV bias, -HV. Cf activation
2016/11/05 Noise data versus HV bias, +HV
2016/11/04 Sampling glitch seen, then it goes away again
2016/11/03 Erect lead-poly shield, reduces background rate 80→20 Hz. dIb/dIs data, noise data, pulse data
2016/11/02 Bill Page arrives. Rparasitic, Rnormal. Superconducting and normal-state noise.
2016/11/01 QET biases suddenly too low, need to be increased
2016/10/31 (Mon) Mini-IbIs, parasitic resistance
2016/10/30 Cf activation
2016/10/29 Cf activation
2016/10/28 Test HV to +70V HV, +50V on detector. Cf activation.
2016/10/27 Mini-IbIs
2016/10/26 Test HV bias to ±30 V
2016/10/25 Set up 1-sided HV-mode (Side 1 readout). Take noise and pulse data
2016/10/24 (Mon) Take 2-sided data. Cf activation.
2016/10/23 Activate detector with Cf source
2016/10/22 1K Pot failure, recover 1K Pot and cool back to base. Take zero-bias data
2016/10/21 Measure Rnormal and Rbiased
2016/10/20 Select new QET biases lower in transition. Take zero-bias data
2016/10/19 Tune SQUIDs, set high-ish QET biases. Take zero-bias data
2016/10/18 dIb-dIs measurements, mini-IbIs measurements. Oscillations in phonon traces at certain QET bias settings
2016/10/17 (Mon) First pulses. Measure Tc's
2016/10/16 Bake detector
2016/10/15 Bake detector
2016/10/14 Cool to base, 38 mK
2016/10/13 Blow out LN2, throughput test, initial LHe transfer
2016/10/12 Seal and leak check IVC, drill holes in fridge port tubes to fix Taconis problem, transfer LN2
2016/10/11 Reroute two broken wires on Stripline 19, finish tower installation
2016/10/10 (Mon) Build tower, begin installation
2016/10/09
2016/10/08
2016/10/07 Final G101c wirebond repair
2016/10/06 Re-wirebond G101c, build LEDs into source holder
2016/10/05 Deinstall tower and cans. Begin G101c wirebond repairs.
2016/10/04 Plan LED installation for G101c, whose housing lacks LEDs.
2016/10/03 (Mon) Lower Dewar. Receive G101c, which has some problems.

Run 60

Run Det Det Type Source Purpose
60 150 mm Si Contact-Free 1 x Am-241
2016/10/02
2016/10/01
2016/09/30
2016/09/29
2016/09/28
2016/09/27
2016/09/26 (Mon)
2016/09/25
2016/09/24
2016/09/23
2016/09/22
2016/09/21
2016/09/20
2016/09/19 (Mon)
2016/09/18
2016/09/17
2016/09/16
2016/09/15 Blow out LN2, successful throughput test, initial LHe transfer
2016/09/14 Cryoclean mixture, transfer LN2, verify no dilution-to-IVC leak
2016/09/13 Install tower, seal IVC
2016/09/12 (Mon) Install tower, repair tower thermometer wire
2016/09/11
2016/09/10
2016/09/09 Seal IVC and check for IVC-to-dilution unit leak, none seen
2016/09/08 Open MC and replace MC indium seal
2016/09/07 Remove entire IVC, attempted leak checks
2016/09/06 Room-temperature leak checks from IVC to dilution unit
2016/09/05 (Mon)
2016/09/04
2016/09/03
2016/09/02 Leak from dilution unit to IVC discovered at 77K. Begin warmup to fix leak.
2016/09/01 Discover SQUET wiring inconsistencies, seal and pump on IVC
2016/08/31 (Wed) Tower Electrical check, install tower.