UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210208

2021/02/08 (Monday)

Previous Day

  • Lab in-person: Derek
  • Virtual partner: Matt
Status Run 74 prep. Main bath is up. Need to do more cryocleaning and prepare room-temperature circuit for HV biasing.
For HV we need to use the D-sub diverter to connect the HV wire to a 400 MOhm ballast resistor and a 1 MOhm test resistor in series. As seen in the Jan 7 run diary the HV is connected to QET A RETURN #1. The diverter board page indicates that this corresponds to Pin 1 - I think this is the same for the d-sub connectors and the side connections.
1610 Close V12b and remove LN2 Trap 2 from the bath to warm up.

Next Day