2022/10/21 (Friday)

Previous Day

  • Lab in-personnel: Zach
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe source behind lead wall on West side of lead/poly shield.
NaI trigger window: 7.6-11.0 MeV
Cooled to base two days ago after fifteenth 5K pumpout.
Taking NaI-triggered data overnight
0950 DCRC1pA baseline: -0.823 V
1001 Start -82.3 V PuBe data series 84 min long, SiHV-triggered with 1000 initial randoms, 5 Hz in-run randoms, trigger on DCRC1pB threshold 10.
Start series with the Start Button
1005 MC base = 30.2 mK. Most spikes peak below 33 mK, some above 36 mK
1005 HV = -91.7 V, Vtest = -21.2 mV, Ileak = -23.3 uA, Vdet = -82.3 V (90%).
1126 Start -82.4 V PuBe data series 368 min long, NaI-triggered with 1000 initial randoms, 5 Hz in-run randoms, trigger on DCRC4pA threshold 20.
Start series with the Start Button
1145 DCRC1pA baseline: -0.823 V
1145 HV = -91.7 V, Vtest = -21.2 mV, Ileak = -23.3 uA, Vdet = -82.4 V (90%).
1411 MC/Coldplate = 30.3/149 mK, Still = 1.09 K / 0.090 mbar / 0 mW, G1/G2 = 103/114 mbar, 1K Pot = 45° / 1.58 K / 10±1 mbar, MB = 33.8%
1412 Fill LN2 cold trap bath
1620 DCRC1pA baseline: -0.822 V
1620 MC base = 30.1 mK.
1730 DCRC1pA baseline: -0.816 V. MC base has risen a little, from about 30.1 to 30.4 mK. Could be the first signs of helium films.
1740 Dial HV down to 0V
1746 Close V6 to stop circulation.
1750 V6 is now fully closed (light is off on IGH, Still pressure is rising, Condenser pressure falling). Turn off 3He pump
1752 Close 1K Pot needle valve
1753 Open V3 to let mixture from Condenser side into Still side.
1754 MC = 0.28 K
1755 Turn on Still and MC heaters to 20 mW each
1756 Turn off DAQ programs and unplug DCRCs 1&3
1605 Move PuBe source out of K100 lab into storage (Howitzer in PAN434)
1810 Start NaI spectrum scan, 0-12 MeV step 0.05 MeV, 12 minutes per step. Should end around 9pm tomorrow.
1812 Close 1K Pot speedivalve, V4a, 4He pump inlet valve. Turn off 4He pump. Close recovery valve to 4He pump outlet. NOTE: remember to open recovery valve when the pump is turned back on.
1820 MC/1KPot = 2.93/3.03 K
1824 Check pressure in IVC: 0.12 ubar. Start pumping out IVC with turbo pump
1850 MC/1KPot = 3.87/3.88 K. G1(fridge) = 760 mbar
1900 G1(fridge) = 789 mbar. Open V9 to release pressure into the dump.
2135 Tower = 11.05 K. Turn off MC and Still heaters, a little late (meant to do it at 10 K)