start › cdms › k100 › run_diary › 20220914

2022/09/14 (Wednesday)

Previous Day

  • Lab in-personnel: Zach
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe behind lead wall on West side of lead/poly shield.
NaI trigger window: 7.6-11.2 MeV
Cooled to base on Monday, Sixth 5K pumpout. Taking +100V NaI-triggered data overnight
Temperature spikes become worse overnight
0957 Previous data run wont stop? Stop DCRC programs, does nothing. Cant log into cdms1, I think because I (Zach) lost permissions
1120 Matt was able to log into cdms1. Killed and restarted MIDAS. Stopped the data series.
1124 HV = 97.8 V, Vtest = 15.5 mV, Ileak = 17.1 uA, Vdet = 91 V (93%).
1130 Pulses look ok
1133 Start +97.8 V PuBe data series 43 min long, SiHV-triggered, with 1000 initial randoms, 5 Hz in-run randoms, trigger on DCRC1pB threshold 10.
Start series with the Start Button
1220 Made the mistake of enabling DCRC2 for a second when it was on version 3.1 instead of 3.0, so bias went very high for a minute (sorry Matt)
1221 Dial HV up to +230V nominal, +228.5V actual, for 15% prebias
1227 HV = 228.5 V, Vtest = 316.2 mV, Ileak = 347.9 uA, Vdet = 89.4 V (39%).
Leakage very bad, not dropping at all
1228 Dial HV down to +200V nominal, +198.4V actual
1230 HV = 198.4 V, Vtest = 245.9 mV, Ileak = 270.5 uA, Vdet = 90.2 V (45%).
It seems around 90V is the max we can get at the detector
1232 Dial HV down to 0
1400 Check phonon channels. Pulses look fine but five of the channels have very different baselines c/w before the “jolt”. Relocking restored two of them…
1410 Adjusted offsets on the remaining three to get baselines near -0.8V. One good thing - on DCRC3pA&D the offsets aren't as extreme as before.
Let's try nominal 115V prebias, 100V bias like yesterday, see if the leakage is the same
1414 Dial HV up to +115V nominal, 112.9 V actual using RootSequencer
1420 HV = 112.9 V, Vtest = 16.7 mV, Ileak = 18.4 uA, Vdet = 105.6 V (93%). Seems to be better than yesterday.
1421 Dial HV down to +100V nominal, 97.9 V actual
1427 HV = 97.9 V, Vtest = 11.2 mV, Ileak = 12.3 uA, Vdet = 92.9 V (95%). Better than yesterday.
1427 Dial HV up to +150V nominal, 148.0 V actual
1430 HV = 148 V, Vtest = 124.4 mV, Ileak = 136.8 uA, Vdet = 93.3 V (63%). Vtest seems flat. Not good.
1431 Dial HV down to +130V nominal, 128.0 V actual
1433 HV = 128 V, Vtest = 78.5 mV, Ileak = 86.4 uA, Vdet = 93.5 V (73%).
1434 Dial HV down to +120V nominal, 118.1 V actual
1435 HV = 118.1 V, Vtest = 57.2 mV, Ileak = 62.9 uA, Vdet = 92.9 V (79%).
1436 Dial HV down to +115V nominal, 112.9 V actual
1437 HV = 112.9 V, Vtest = 47 mV, Ileak = 51.7 uA, Vdet = 92.2 V (82%). So there's hysteresis. Leakage was much better at this bias just 20 minutes ago.
1439 Dial HV down to +100V nominal, 97.9 V actual
1441 HV = 97.9 V, Vtest = 14.8 mV, Ileak = 16.3 uA, Vdet = 91.4 V (93%). OK finally back up above 90% (though a bit worse than earlier). Looks like +100V nominal is the highest we can go.
1442 Dial HV down to 0V
1459 MC/Coldplate = 30.6/150 mK, Still = 1.13 K / 0.075 mbar / 0 mW, G1/G2 = 134/126 mbar, 1K Pot = 45° / 1.59 K / 13±1 mbar, MB = 33.7%
1510 Begin LHe transfer @ MB = 33.6%
1525 Fill LN2 cold trap bath
1550 Ended LHe transfer @ MB = 94.0%
The transfer seems to have affected G1 and G2, G1 rose to 145 then fell to 120 and is now settling at 130
1730 Check phonon channels. They seem OK although DCRC1pA baseline has shifted (that was the one that was still good after the “jolt”).
1740 Tune all offsets to get baselines near -0.80 V. We can see if/when they start drifting.
2200 Traces still look OK. Presumably they'll be dead by morning.
0430 No pulses, elevated baselines - TESs have gone normal