UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20190712

2019/07/12 (Friday)

Previous Day

Setup DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer ?/3/2 → HVConn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)
DCRC33(2) → 1kV power supply → HV input

Three walls of the lead/poly shield are up.
0850 Tower/MC/Coldplate = 38.5/31.1/196 mK, Still = 1.35 K / 0.18 mbar / 6 mW, G1/G2 = 202.9/195.5 mbar, 1K Pot = 1.614 K / 18 mbar. MB = 36.8 %
0910 Fill LN2 cold trap bath.
1350 Begin LHe transfer, MB=28.9%
1430 End LHe transfer, MB=91.8%
1625 Fill LN2 coldtrap bath.

Next Day