| Status | Run 74 finished. |
| | All mixture is in dump. Fridge isolated. 1K Pot isolated. LN2 Trap 2 still has contaminants in it. MB in pit, clean tent erected. Cryostat vacuum jacket (CVJ) pumped out. IVC open |
| | Yesterday the 4K, 600mK, 100mK stages were all deinstalled. |
| 1300 | Remove Tower from cryostat, using scissor jack. Put tower in cleanroom anteroom. |
| 1500 | Begin replacing resistors on HV board, to set up for HV bias to 6 Side2 phonon channels. |
| 1630 | Remeasure S104 channel resistances, see preparation |
| 1650 | Put tower from R74 deinstallation into nitrogen purge |