2019/05/07 (Tuesday)
| Status | Room temperature, after second blockage. IVC and cryostat vacuum jacket pumped out. Several cleanings yesterday. Dump left open to cold LN2 Trap 2 overnight. Removed 6.0 mbar of contaminants from mixture overnight. |
|---|---|
| Setup | DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 |
| 0840 | Fill LN2 cold trap bath |
| 0845 | Pump mixture from cold LN2 Trap 2 to dump. |
| 0855 | LN2 Trap 1 is warm. Check contents: 5.3-0.6 = 4.7 mbar on G1. Pump out with scroll pump. |
| 0905 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.9% |
| 0910 | Increase V6 → 13.1% to restart flow |
| 0915 | Increase V6 → 13.2% to restart flow |
| 0930 | Increase V6 → 13.3% to speed up flow |
| 1010 | Stop cleaning through Trap 1 after 65 min. G2 flow pressure was 575-680 mbar. Pump mixture to dump. Removed 5.2 mbar. |
| 1050 | LN2 Trap 2 is warm. Check contents: 6.1-0.1 = 6.0 mbar on G1. Pump out with scroll pump. |
| 1125 | LN2 Trap 1 is mostly warm. Check contents: 5.2-0.0 = 5.2 mbar on G1. Pump out with scroll pump. |
| 1140 | Check fridge pressures: LHe trap/Condenser/Still = 0.3/0.2/0.018 mbar. Pump out with scroll pump. |
| 1140 | Open dump to both sides of fridge lines via LN2 cold trap 1. |
| 1145 | With 1K Pot speedivalve and needle valve closed, pump on Main bath with scroll pump. Once P2 < 100 mbar, open 1K pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2. |
| 1150 | Close off scroll pump, then pressurized bath and 1K Pot (both sides) to (SKIP THIS PART: about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar.) Pressurize main bath and 1K Pot (both sides) to 377 mbar +1atm on G3, then close 1K Pot speedivalve and needle valve. |
| 1150 | Turbo on IVC = 7.4 nbar. With turbo valved out for a few minutes, IVC = 100 nbar. |
| 1155 | Let 5.4 mbar He exchange gas into IVC |
| 1200 | MC(Cernox) = 292.4 K, Sorb = >249 K (max), IVC = 5.4 mbar, G1 (fridge) = 618.2 mbar, Level resistor = 0.985 kΩ. DIB4 pD SQUID = 3.313 kΩ. |
| 1200 | Begin LN2 transfer |
| 1215 | MC(Cernox) = 292.3 K, Sorb = >249 K (max), IVC = 4.6 mbar, G1 (fridge) = 619.1 mbar, Level resistor = 0.990 kΩ. DIB4 pD SQUID = 3.286 kΩ. |
| 1230 | MC(Cernox) = 283.7 K, Sorb = >249 K (max), IVC = 4.0 mbar, G1 (fridge) = 619.4 mbar, Level resistor = 1.004 kΩ. DIB4 pD SQUID = 2.988 kΩ. |
| 1245 | MC(Cernox) = 261.5 K, Sorb = >249 K (max), IVC = 3.4 mbar, G1 (fridge) = 619.1 mbar, Level resistor = 1.014 kΩ. DIB4 pD SQUID = unstable at first, then 2.592 kΩ. |
| 1300 | MC(Cernox) = 241.9 K, Sorb = >249 K (max), IVC = 3.0 mbar, G1 (fridge) = 619.0 mbar, Level resistor = 1.028 kΩ. DIB4 pD SQUID = 2.29 kΩ. |
| 1320 | MC(Cernox) = 203.7 K, Sorb = >249 K (max), IVC = 2.5 mbar, G1 (fridge) = 618.4 mbar, Level resistor = 1.079 kΩ. DIB4 pD SQUID = 4.7 kΩ, unstable. |
| 1330 | MC(Cernox) = 184.7 K, Sorb = >249 K (max), IVC = 2.2 mbar, G1 (fridge) = 618.1 mbar, Level resistor = 1.114 kΩ. DIB4 pD SQUID = 1.807 kΩ. |
| 1345 | MC(Cernox) = 165.9 K, Sorb = >249 K (max), IVC = 2.2 mbar, G1 (fridge) = 617.5 mbar, Level resistor = 1.169 kΩ. DIB4 pD SQUID = 3 kΩ, unstable with Fluke; also unstable with Wavetek. |
| 1400 | MC(Cernox) = 145.9 K, Sorb = 242.7, IVC = 1.9 mbar, G1 (fridge) = 617.0 mbar, Level resistor = 1.232 kΩ. DIB4 pD SQUID = 1.665 kΩ. |
| 1415 | MC(Cernox) = 132.6 K, Sorb = 200.2, IVC = 1.9 mbar, G1 (fridge) = 616.1 mbar, Level resistor = 1.269 kΩ. DIB4 pD SQUID = 10 kΩ, unstable. |
| 1430 | MC(Cernox) = 120.3 K, Sorb = 165.3, IVC = 1.9 mbar, G1 (fridge) = 615.4 mbar, Level resistor = 1.296 kΩ. DIB4 pD SQUID = 8 kΩ, unstable. |
| 1445 | MC(Cernox) = 113.3 K, Sorb = 149.4, IVC = 1.6 mbar, G1 (fridge) = 615.4 mbar, Level resistor = 1.308 kΩ. DIB4 pD SQUID = 200 kΩ, unstable. |
| 1450 | Stop LN2 transfer. Put ping-pong ball cover on exhaust port. |
| 1450 | DIB4 pD SQUID = 1.86 kΩ, a little unstable. |
| 1630 | MC(Cernox) = 85.8 K, Sorb = 129.4, IVC = 1.6 mbar, G1 (fridge) = 616.4 mbar, Level resistor = 1.237 kΩ. DIB4 pD SQUID = 1.345 kΩ. |
| Leak detector test | |
|---|---|
| 1405 | Set up leak detector with the forepump disconnected and capped. Hook the pump line to our scroll pump to pump with it instead. The P2 foreline pressure goes down to like 3e-2 mbar, much lower than the forepump seems to be capable of (3-12 mbar). Doing a test, the turbo pump is valved in right away. |
| 1435 | Doing a test on the blank - 1.5e-12 mbarL/s, super low. P2 = 4.0e-3 mbar (that's the test port pressure), P1 = 2.0e-2 mbar (that's the foreline pressure). |