2021/11/05 (Friday)

Previous Day

  • Lab in-personnel: Derek, Scott
Status Beginning Run 75.
1K Pot isolated. MB in pit. Cryostat vacuum jacket (CVJ) pumped out.
1230 Disassemble old housing with 100 mm electrode.
1300 Finish disassembly of housing and electrode, housing taken to be machined for source mover use.
Detector housing with electrode, electrode is facing towards the top-side of the housing (side with the dib slots)
Removal of all top-side clamps and spacers. The components are shown here with two of the thicker spacers being used for each clamp.
Comparison of the the two spacer thicknesses (thick and thin)
Removal of all bottom-side clamps and spacers. The components are shown here with two spacers being used for each clamp, one thick and one thin.