2021/11/05 (Friday)
- Lab in-personnel: Derek, Scott
| Status | Beginning Run 75. |
|---|---|
| 1K Pot isolated. MB in pit. Cryostat vacuum jacket (CVJ) pumped out. | |
| 1230 | Disassemble old housing with 100 mm electrode. |
| 1300 | Finish disassembly of housing and electrode, housing taken to be machined for source mover use. |
![]() |
| Detector housing with electrode, electrode is facing towards the top-side of the housing (side with the dib slots) |
![]() |
| Removal of all top-side clamps and spacers. The components are shown here with two of the thicker spacers being used for each clamp. |



