2018/07/12 (Thursday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)
1317 Fill LN2 cold trap full.
1319 Tower = 32.5 mK, G1/G2 = 148.1/142.8 mbar, P1 = 0.140 mbar (Still heater = 4 mW), 1K pot = 1.630 K / 28 mbar. MB = 63.2%.