UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230609

2023/06/09 (Friday)

Previous Day

  • Lab in-personnel: Ping
1223 Check contents of warm LN2 Trap 1: 10.5 mbar (11.1 on G1). Pump it out with the scroll pump.
1228 G1 = 2.3 mbar and stable, stop pumping on Trap 1
1229 Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2
1235 Begin cryocleaning mixture through cold trap 2 following the procedure in procedure:cryoclean_mixture
1244 Open V6 to 11.7% to restart flow
1256 Open V6 to 12.0% to restart flow
1302 G2 increasing too quickly, reduced V6 to 11.9%
1341 End cryocleaning mixture through trap 1. Pump mixture to dump
1411 P1 = 0.007 mbar, G1 = 1.6 mbar and stable. Close all valves and turn off 3He pump, leaving 716.1 mbar in dump
1413 Remove cold trap 1 from the LN2 bath to warm up overnight

Next Day