2023/11/11 (Saturday)
- Lab in-personnel: Zach
| Status | Run 78 in progress. |
|---|---|
| Swapped DCRC3 to Cable2+diverter board and DCRC1 to Cable 1. This step was done by Matt in Run 76 to make the channels in Cable 1 show response to QET bias change |
| 1341 | Tower(U28)/MC(H35)/Coldplate = 79.8/34.0/163 mK, Still(P1) = 1.19 K / 0.11 mbar / 0 mW, G1/G2 = 174/157 mbar, 1K Pot(P2) = 37.5° / 1.63 K / 22 mbar, MB = 32.7% |
|---|---|
| 1343 | Fill LN2 cold trap 1 from dewar |
| 1352 | Begin LHe transfer @ MB = 31.6% |
| 1433 | End LHe transfer @ MB = 93.1% |