UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20231111

2023/11/11 (Saturday)

Previous Day

  • Lab in-personnel: Zach
Status Run 78 in progress.
Swapped DCRC3 to Cable2+diverter board and DCRC1 to Cable 1. This step was done by Matt in Run 76 to make the channels in Cable 1 show response to QET bias change
1341 Tower(U28)/MC(H35)/Coldplate = 79.8/34.0/163 mK, Still(P1) = 1.19 K / 0.11 mbar / 0 mW, G1/G2 = 174/157 mbar, 1K Pot(P2) = 37.5° / 1.63 K / 22 mbar, MB = 32.7%
1343 Fill LN2 cold trap 1 from dewar
1352 Begin LHe transfer @ MB = 31.6%
1433 End LHe transfer @ MB = 93.1%

Next Day