UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20231220

2023/12/20 (Wednesday)

Previous Day

  • Lab in-personnel: Himangshu, Zach
1348 Check contents of LN2 cold trap 1: 15.3 mbar, pump out with scroll pump
1353 Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2
1355 Continue to fill cold trap dewar, turn on He-3 pump and let mixture into the cold trap.
1400 Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture
1407 Open V6 to 12.0% to restart flow
1422 Open V6 to 12.2% to restart flow
1436 Open V6 to 12.3% to restart flow
1452 Open V6 to 12.4% to restart flow
1555 End cryocleaning mixture through trap 1. Pump mixture to dump
1604 P1 = 0.300 mbar, G1 = 2.2 mbar and stable. Close all valves and turn off 3He pump, leaving 618.4 mbar in dump
1607 Remove cold trap 1 from the LN2 bath to warm up overnight

Next Day