UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20200318

2020/03/18 (Wednesday)

Previous Day

Setup Run 72. DIB 1/3/4 → Stripline 43/41/48 → Cable 3/2/1 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1). Lead/poly shield erected (4 lead walls, 2 poly walls).
Status Second Run 72 circulation attempt failed due to helium in IVC. Warming up again.
Helium and nitrogen in IVC and cryostat vacuum jacket. 1K Pot isolated. All mixture in dump. LN2 Trap 1 cleaned. MB recovery valve open. Plan is to try to fix leak at top of stripline tube.
Lab is in hibernation because of novel coronavirus.
0344 Recovery meter = 343774.75 cuft. Rate = 0.026 cuft/hour
0945 MC(Cernox) = 240.6 K.
1154 Recovery meter = 343774.8 cuft. Rate = 0.0104 cuft/hour
1720 MC(Cernox) = 252.7 K.
2025 MC(Cernox) = 259.2 K.

Next Day