UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220430

2022/04/30 (Saturday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRC52(6)
1400 Begin LHe transfer @ MB = 36.8%
1415 Fill LN2 cold trap bath
1440 MC/Coldplate = 28.4/140 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 108/124 mbar, 1K Pot = 18° / 1.56 K / 10±1 mbar
1551 End LHe transfer @ MB = 90.8%

Next Day