2022/05/30 (Monday)
- Lab in-personnel: Matt
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| 1415 | Begin LHe transfer @ MB = 36.8% |
| 1425 | Fill LN2 cold trap bath |
| 1457 | End LHe transfer @ MB = 95.6% |