2018/06/09 (Saturday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)
overnight: Stopped circulation for the weekend due to unstable 1K pot.
1101 Tower = 1.56 K, G1/G2 = 25/23 mbar, MB=39.6%
1110 Start LHe transfer, MB=39.6%. Due to He shortage, don't precool transfer stick. Instead of waiting for the plume, only waited ~10s so all air could flow from transfer stick. This was a much more violent start than normal, the recovery meter went crazy for about 3 minutes. Wait until it settles down to a normal rate to pressurize the dewar.
1115 Fill LN2 cold trap full.
1155 Cease LHe transfer, MB=92.8%.