UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170709

2017/07/09 (Sunday)

Previous Day

Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4)
1252 Fill LN2 cold trap full.
1300 Tower/MC/Coldplate = 27.2/30.3/185 mK, Still = 1.25 K / 0.055 mbar, G1/G2 = 139/133 mbar, 1K Pot = 1.67 K / 24 mbar. MB = 60.4% (Predicted level: 63.1%)

Next Day