UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20171230

2017/12/30 (Saturday)

Previous Day

Setup: DIB1/3/4 → SL 27/19/20 → 3.2 MHz filters → cables 2,1,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3). DCRC4 → HV power supply.
1515 Tower/MC/Coldplate = 23.1/25.4/151 mK, Still = 1.6 K / 0.100 mbar, G1/G2 = 194/163 mbar, 1K Pot = 1.61 K / 22 mbar, MB = 21.4%
1520 Fill LN2 cold trap bath.
1530 Start LHe transfer (MB = 21.1%)
1625 End LHe transfer (MB = 92.9%)

Next Day