2017/01/23 (Monday)
| Status: Bath at room temperature. He exchange gas in IVC. Small leak at top of stripline tube. Mixture is in dump, fridge evacuated. | |
| 0835 | Trap 2 has been warm since Saturday. Trap 2 (G1) = 18.6 mbar, after 95 minutes cryocleaning. A little less than after the Friday cleaning. |
| 0840 | IVC = 6.3 mbar. Crept up from 4.6 mbar on Saturday, a little concerning. Pump out IVC and refill with 4.6 mbar He exchange gas. |
| 0850 | Pump out Trap 2, put it back in LN2 bath, fill LN2 trap bath |
| 0900 | Flush main bath then pressurize with He gas |
| 0905 | Begin cryocleaning mixture through Trap 2 |
| 0910 | Begin LN2 transfer |
| 0915 | MC (Cernox) = 290 K, IVC = 4.6 mbar |
| 0920 | MC (Cernox) = 290 K, IVC = 4.0 mbar |
| 0940 | MC (Cernox) = 276 K, IVC = 3.4 mbar |
| 1005 | MC (Cernox) = 240 K, IVC = 2.5 mbar |
| 1005 | Stop cryocleaning, pump mixture back to dump |
| 1005 | MC (Cernox) = 207 K, IVC = 2.2 mbar, level resistor = 1.318 kΩ |
| 1025 | Open up fridge lines to Trap 1 (through v12a+speedivalve, v3, v1, condenser speedivalve, still gate valve). Then close V12a+speedivalve and let mixture from G2 volume into Trap 1 through v13a. (v9 is closed, so most of the mixture is still in the dump.) |
| 1005 | MC (Cernox) = 194 K, Sorb = 248 K, IVC = 2.2 mbar, level resistor = 1.336 kΩ Stop LN2 transfer |
| 1035 | Try throughput test with the small amount of mixture in the G2 volume only. Before opening V12a, G2 read 480 mbar. After letting mixture into still, G1 rose to 230 mbar, then after isolating the still and opening the condenser to G1, G1 fell to minimum of 14 mbar. Then G1 began to rise, so there is throughput :). Throughput = 3.2 mbar/min. |
| 1050 | Allow mixture to trickle into still and condenser from dump through Trap 1 and partially-open v12a speedivalve. |
| 1055 | MC (Cernox) = 168 K, Sorb = 200 K, IVC = 1.9 mbar |
| 1135 | MC (Cernox) = 136 K, Sorb = 155 K, IVC = 1.6 mbar |
| 1250 | MC (Cernox) = 105 K, Sorb = 134 K, IVC = 1.6 mbar |
| 1310 | Pump mixture out of fridge, back to dump and Trap 1 |
| 1315 | MC (Cernox) = 98 K, Sorb = 132 K, IVC = 1.4 mbar |
| Will perform throughput test @ about 100K through Cold Trap 1 |
- All mixture in dump, LN2 traps cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2.
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1320 | Perform throughput test. G1 reaches maximum of 640 mbar before isolating mix in still, then falls to minimum of 85 mbar after opening G1 to condenser, then begins to increase. Throughput = 45 mbar/min. Lower than Oct 13 when it was 57 mbar/min, but this is a higher temperature so we expect it to be lower. |
|---|---|
| 1340 | Open fridge lines (condenser and still) to Trap 1. Leaving v13b closed, so some mixture is still in the dump. Turn off 3He pump. |
| 1345 | MC (Cernox) = 92 K, Sorb = 130 K, IVC = 1.4 mbar |
| 1400 | MC (Cernox) = 89.6 K, Sorb = 129.3 K, IVC = 1.4 mbar |
| 1405 | Begin blowing out LN2 from main bath |
| 1415 | G3 (main bath) pressure has fallen from 600 to 175 mbar, hose limp, blowout is maybe finished |
| 1425 | MC (Cernox) = 86.6 K, Sorb = 131 K, IVC = 1.4 mbar MC is still cooling (but Sorb is warming). Trying to decide when to pump out the exchange gas during the blowout. Probably wait until MC stops getting colder. |
| 1440 | Pump out main bath with scroll pump. P2 falls below 1 mbar after 8 minutes so it looks like the bath is empty. |
| 1450 | Pump out 1K pot with scroll pump, too |
| 1455 | Fill main bath with He gas. Also let some He into the 1K Pot during this process. |
| 1455 | MC (Cernox) = 85.0 K, Sorb = 141 K, IVC = 1.4 mbar |
| 1455 | Begin pumping out IVC with scroll pump |
| 1503 | Begin LHe transfer |
| 1505 | Let 46 μbar He transfer gas into IVC |
| 1510 | MC(Cernox) = 84.8 K, Sorb = 142 K, IVC = 46 μbar, Fridge(G1) = 610 mbar |
| 1535 | MC(Cernox) = 78.8 K, Sorb = 108 K, IVC = 22 μbar, Fridge(G1) = 590 mbar |
| 1540 | Perform electrical check on detector as on Jan 18. Some things are the same, some problems went away: |
- On DIB4, there appears to be a 60 nS (15 MΩ) short to chassis from the qInner wire between the feedback resistor, coupling capacitor, and FET gate. This could be either in the side coax or the FET card. (symptoms: chassis→qIfeedback = 15 nS, chassis→qIsource = 60 nS, chassis→qIdrain = 50 nS, qIfeedback→chassis = 18 nS, qIdrain→chassis = 0.1 nS, qIsource→chassis = 0.1 nS.
On DIB3 there is a 26 nS short to chassis from qIfeedback- On DIB1, LED1 seems to leak in the reverse direction at 309 kΩ. (This was seen at the detector tests too)
| 1555 | MC(Cernox) = 66.8 K, Sorb = 56 K, IVC = 12 μbar, Fridge(G1) = 400 mbar |
|---|---|
| 1605 | 1K Pot temperature falls into readable range, <7 K |
| 1610 | MC(Cernox) = 58.9 K, Sorb = 9.1 K, IVC = 8.6 μbar, Fridge(G1) = 290 mbar |
| 1615 | MC(Cernox) = 56.9 K, Sorb = 7.9 K, IVC = 8.6 μbar, Fridge(G1) = 285 mbar, MB = 17.5% |
| 1625 | Remove Trap 2 from LN2 bath. Fill LN2 bath. |
| 1635 | MC(Cernox) = 47.3 K, Sorb = 7.0 K, IVC = 7.4 μbar, Fridge(G1) = 265 mbar, MB = 48.9% notice that sound from the recovery meter has the same rhythm as the Xmas song “Sleigh Ride” |
| 1645 | MC(Cernox)/Sorb/1K Pot = 42.4/6.9/5.4 K, IVC = 7.4 μbar, Fridge(G1) = 260 mbar, MB = 76.4% |
| 1655 | Stop LHe transfer @ 90.4% |
| 1655 | Fridge pressure went up when transfer was ended, to 340 mbar, then fell again |
| 1700 | MC(Cernox)/Sorb/1K Pot = 33.9/6.6/5.2 K, IVC = 7.4 μbar, Fridge(G1) = 330 mbar |
| 1715 | MC(Cernox)/1K Pot =23/4.5 K, Fridge(G1) = 337 mbar. (NOTE: These measurements were taken at 17:30 using VI graphs). |
| 1720 | MC(Cernox) = 17 K |
| 1730 | MC(Cernox)/Sorb/1K Pot = 4.5/5.7/4.5 K, IVC = ?? μbar, Fridge(G1) = 345 mbar. Noticed steep temperature drop and started pumping on IVC with turbopump before we could note IVC pressure. |
| 1737 | MC(Cernox)/Sorb/1K Pot = 4.3/6.1/4.7 K, IVC = 34 nbar, Fridge(G1) = 356 mbar. |
| 1752 | MC(Cernox)/Sorb/1K Pot = 4.29/6.5/5.4 K, IVC = 22 nbar, Fridge(G1) = 373 mbar. |
| 1819 | MC(Cernox)/Sorb/1K Pot = 4.37/6.7/5.2 K, IVC = 22 nbar, Fridge(G1) = 385 mbar. |
| 1900 | MC(Cernox)/Sorb/1K Pot = 4.40/6.8/5.3 K, IVC = 22 nbar, Fridge(G1) = 396 mbar. |
| 1920 | MC(Cernox)/Sorb/1K Pot = 4.41/6.9/5.4 K, IVC = 25 nbar, Fridge(G1) = 399 mbar. Main bath=85.5% Looks like things are good, heading out. [image not archived: cool.svg] |