2017/09/18 (Monday)
| Status: Tower installed and has passed electrical checks. IVC passed leak check. Pumped out IVC with turbo pump over weekend. | |
| 1010 | Turbo = 30 nbar, IVC = 0.74 μbar. Better than Run 63. |
| prepare a room-temperature throughput test with simultaneous leak check on IVC. Since the LN2 traps are warm, we'll modify the usual procedure - we'll let mix directly from the dump to G1. | |
| 1025 | G1 and P1 are both around 30 mbar. This is presumably air that has leaked in. Will pump this out to air with scroll pump. Then check pressure in fridge, pump that out with scroll pump too. |
| 1045 | Pumped fridge pressures down to about 1 mbar |
| 1045 | LD is pumping on IVC with background of 1.6 pbarL/s |
Room temperature throughput test when traps are warm:
- All mixture in dump (LN2 traps warm), condenser & still valves open (3He pump on - optional)
- Open V9, V4, V3. Wait for G1 to be close to G2.
- Close V4 and V3, open V1
- monitor G1
| 1050 | Perform throughput test with procedure above. LD signal does not go up: good! Throughput result: let G1 rise to 600 mbar before Step 3, then it falls to 51 mbar and begins to rise. Throughput: 7.4 mbar/min. Compare with last June, a little lower (but that time was a lower temperature). |
|---|---|
| 1100 | Pump mixture back to dump |
| 1100 | 3He pump is very loud. This is probably bad. Does it need to be serviced? |
| 1125 | Stop pumping mixture from fridge to dump (down to 50 μbar on P1). Turn off 3He pump. |
| 1325 | Turn on 3He pump as a test. It is not nearly as loud. Can't say for sure whether it's louder than usual. However there is a high-pitched whine that seems new. |