2022/01/27 (Thursday)
- Lab in-personnel: Matt, Nikki
| Status | Run 75 in progress |
|---|---|
| Setup | Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4) Lead shield in place. Am Source y = 0.03 mm |
| 1449 | Goldman/Tower/MC(H35)/Coldplate = 41.0/71.7/33.5/180 mK, Still = 1.40 K / 0.110 mbar / 0 mW, G1/G2= 262/235 mbar, 1K Pot = 1.59 K / 12±1 mbar, MB = 63.5%. |
| Fill LN2 cold trap bath. |