UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20191023

2019/10/23 (Wednesday)

Previous Day

Status: Tower assembled with UMN TF tower. 2nd attempt at Run 71 cooldown.
1120 Install adapter plate, tape over slot on face 4 upper PCB, tape motor wires and thermometer wire closer to spool.
1445 Begin installing tower in fridge.
1704 Installed 100 mK heat sinks. Did not finish 100 mK outer screws.

Next Day