2022/08/14 (Sunday)
- Lab in-personnel: Giulia
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors. PuBe behind lead wall on West side of lead/poly shield. |
| 1810 | MC/Coldplate = 28.9/152 mK, Still = 1.14 K / 0.120 mbar / 0 mW, G1/G2 = 166/158 mbar, 1K Pot = 50° / 1.62 K / 20±2 mbar, MB = 55.5% |
| 1820 | Fill LN2 cold trap bath |