2022/04/09 (Saturday)
- Lab in-personnel: Zach
| Status | Run 76 in progress |
|---|---|
| Setup | Cable 2/1/3 → diverter/nothing/nothing → HV CONN1/2/3 → DCRC55(1)/DCRC50(3), NaI trigger signal → DCRC52(6) actually discovered later that Cables 1&3 were swapped. |
| 1215 | MC/Coldplate = 27.8/140 mK, Still = 1.12 K / 0.120 mbar / 0 mW, G1/G2= 164/159 mbar, 1K Pot = 18° / 1.62 K / 20±2 mbar |
| 1410 | MB = 62.9 %. |
| 1410 | Filled LN2 cold trap bath most of the way, the LN2 dewar is empty now. |