2023/05/04 (Thursday)
- Lab in-personnel: Zach, Himangshu
| 1311 | MC(Cernox) = 77.1 K, IVC = 3.0 mbar, G2/G1 = 546/590 mbar. |
|---|---|
| 1315 | Fill LN2 cold trap dewar |
| 1316 | IVC = 3.0 mbar, Start pumping out IVC with Scroll Pump. When pressure falls below 0.1 mbar switch to Turbo Pump. |
| 1325 | Turn on 3He pump and open V6 to 12.4%, re-establishing circulation like yesterday. G2/G1/P1 → 658/712/1.1 mbar and settled |
| 1330 | Close V12a speedivalve for 2 minutes to assess throughput. G1 falls at 64 mbar/min, good. Reopen V12a speedivalve |
| 1333 | Pump mixture to dump. Close V13a, open V3 (V9 already open), open V6 more in steps up to 30% |
| 1350 | G1 = 1.2 mbar, P1 = 0.090 mbar. Stop pumping mixture to dump. Close V12a+speedivalve, close V1, close V3, close V6 |
| 1355 | V6 is fully closed, G2 = 720.6 mbar in the dump. Leave 3He pump on. |
| Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2 (within 100 mbar).
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1357 | Perform mixture throughput test at MC = 77 K using above procedure with 3He pump on. Let G1 rise to ~500 mbar before Step 3, then it falls to ~60 mbar, then rises. Throughput = 41.8 mbar/min. |
|---|---|
| 1401 | Open mixture to both sides of the fridge (V3) and cold LN2 Trap 1 (V12a+speedivalve). |
| 1430 | Turbo in IVC = 74 nbar, with the turbo valved out for a min, IVC = 1.2 ubar |
| 1434 | Pump IVC with Leak Detector, Turbo valved out, IVC = 300 pbarL/s |
| 1445 | Begin blowing out LN2 (following Blow Out Liquid Nitrogen). Main bath (G3) → 290 mbar+1atm |
| 1450 | IVC = 300 pbarL/s, MB = 288 mbar+1atm |
| 1502 | LD on IVC = 285 pbarL/s, MB = 303 mbar+1atm, IVC at 860 nbar |
| 1512 | LD on IVC = 270 pbarL/s, MB = 294 mbar+1atm, IVC at 860 nbar |
| 1517 | Swapped Bomb dewar. |
| 1523 | LD on IVC = 254 pbarL/s, MB = 179 mbar+1atm, IVC at 860 nbar |
| 1533 | LD on IVC = 240 pbarL/s, MB = 142 mbar+1atm, IVC at 860 nbar |
| 1543 | LD on IVC = 240 pbarL/s, MB = 142 mbar+1atm, IVC at 860 nbar |
| 1544 | Check output into bomb dewar, no more liquid, assume LN2 blowout is complete. G3 at 284 mbar (since i tried putting a stopper on the rubber hose). Close V2A, V5A, V4A, and V1A. Close the He gas supply and the valve on the gas line. |
| 1550 | Checking the rubber hose again it turns out there is still more to blow out, just that the pressure wasnt high enough, restart blowout |
| 1554 | LD on IVC = 240 pbarL/s, MB = 370 mbar+1atm, IVC at 860 nbar |
| 1612 | G3 dropping quickly, no liquid coming out of the hose, LN2 blowout must be complete. Close V2A, V5A, V4A, and V1A. Close the He gas supply and the valve on the gas line. |
| 1619 | Turn off 3He pump, we'll leave it off like last time. |
| 1620 | Wait for the rubber hose to warm up to remove the tubing from the transfer stick, and then plug the transfer stick. |
| 1623 | Start pumping out main bath with scroll pump. |
| 1633 | Open scroll pump fully, P2 falls in range soon after |
| 1640 | P2 = 0.95 mbar, stop pumping on main bath by closing the scroll pump valve and turning off the scroll pump. |
| 1645 | Pressurize MB with helium to 94 mbar above 1 atm. |
| 1647 | Isolate MB by closing V1a. Pump out line to the G3 volume (including 2a and 5a) with Scroll Pump. Isolate pump (and close 2a, 5a), then open 1K Pot speedivalve to check pressure: didn't see the mechanical gauge move much, P2 went to 90 mbar. Then pump out 1K Pot (needle valve closed) with Scroll Pump to 0.034 mbar on P2. Then close 1K Pot speedivalve and V4a. Open V1a again to monitor bath pressure, G3 = 63.8 mbar. |
| 1654 | Close and turn off leak checker. IVC is at 1.9 ubar. Let 63 μbar He exchange gas into IVC (very carefully). |
| 1707 | Begin initial LHe transfer @ MB = -1.0% |
| 1754 | MC(Cernox)/Sorb/1K Pot = 76.78/110/6.99 K, IVC = 1.6 μbar, G1(fridge) = 514 mbar. G3(MB) = 436 mbar+1atm, MB = 10% |
| 1810 | MC(Cernox)/Sorb/1K Pot = 76.5/104/6.99 K, IVC = 1.2 μbar, G1(fridge) = 463 mbar. G3(MB) = 368 mbar+1atm, MB = 40% |
| 1820 | MC(Cernox)/Sorb/1K Pot = 76.35/99/6.99 K, IVC = 1.2 μbar, G1(fridge) = 458 mbar. G3(MB) = 410 mbar+1atm, MB = 66% |
| 1830 | Pausing the transfer now as the level started going low again even after inserting the stick all the way into the He dewar. I am afraid there will be more boil off during the transfer that we are out of LHe without getting too cold. So, we will keep this LHe and redo another transfer tomorrow. |
| 2130 | Current rate of temp fall is 7 K/hr. At 9:30 pm, it is at 66 K, if rate remain constant, it might get to 10K at 5:30 am tomorrow. |
| 2239 | MC at 41 K, open turbo to IVC. IVC pressure hit 1.9e-4 mbar after about a minute. |
| 2243 | Close V1a. MB = 20.2% |
| 1341 | Electrical check of ZC-70+interposer after connecting to Stripline 41 on Tower Face 5 | ||||
|---|---|---|---|---|---|
| Cooldown checkout sheet (rev C SQUET) | |||||
| Detector: | S104 | Stripline | 41 | ||
| SC: | none | 77 K 77 K | |||
| Face: | 5 | Date | 05/04/2023 | ||
| SQUET: | ZC-70 | Cable | 2 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | — k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.646 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 1.758 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.985 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 14.59 k | OK |
| Feedback B/Ret | 2 | 18 | 9.15 k | OK | |
| Feedback C/Ret | 41 | 25 | 13.82 k | OK | |
| Feedback D/Ret | 22 | 6 | 16.91 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL,68.8,OL, OL, OL | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 40.7, 41, OL, OL | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 45.4, 44.6, OL, OL | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 41.8, 42.5, OL, OL | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | 16.41 kohm | |
| QET A/QET C | 3 | 7 | 16.42 kohm | ||
| QET A/QET D | 3 | 38 | OL | ||
| QET B/QET C | 35 | 7 | 219 | ||
| QET B/QET D | 35 | 38 | OL | ||
| QET C/QET D | 7 | 38 | OL | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | 1.383 | |
| LED 2 | chassis | 26 | 1.856 | ||
| Motor Coil 1 | pBr3 | pBr4 | 34 | ||
| Motor Coil 2 | pCr3 | pCr4 | 6.56 k | ||
| Near Endstop | pAr3 | chassis | 7.96 k | ||
| Far Endstop | pAr4 | chassis | 32.26 k | ||
| Thermometer ROX | pAr1 | pDr4 | 1.216 k | ||
| 1441 | Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2 | ||||
|---|---|---|---|---|---|
| Cooldown checkout sheet (rev C SQUET) | |||||
| Detector: | S104 | Stripline | 43 | ||
| SC: | none | 77 K 77 K | |||
| Face: | 2 | Date | 5/4/2023 | ||
| SQUET: | ZC-13 | Cable | 3 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 1.727 k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.817 k | OK | |
| SQUID bias C/Ret | 8 | 24 | — k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.884 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 7.45 k | OK |
| Feedback B/Ret | 2 | 18 | 7.98 k | OK | |
| Feedback C/Ret | 41 | 25 | — k | OK | |
| Feedback D/Ret | 22 | 6 | 8.39 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 73.7, 38.2, 34.2, 34.4, 42.5 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 34.3, 34.5, 59.8, 34.4 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 39, 37.5, 26.4, 34.7 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 50.5, 38.7, 37.7, 38.1 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | OL | |
| QET A/QET C | 3 | 7 | OL | ||
| QET A/QET D | 3 | 38 | OL | ||
| QET B/QET C | 35 | 7 | OL | ||
| QET B/QET D | 35 | 38 | OL | ||
| QET C/QET D | 7 | 38 | OL | ||
| 1248 | Electrical check of ZC-39 after connecting to Stripline 48 on Tower Face 3 | ||||
|---|---|---|---|---|---|
| Note: This SQUET need to slanted to make QET B working, seems to be affected by the angle between stripline head connector with the SQUET | |||||
| Detector: | S104 | Stripline | 48 | ||
| SC: | none | 77 K 77 K | |||
| Face: | 3 | Date | 5/04/2023 | ||
| SQUET: | ZC-39 | Cable | 1 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 1.632 k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.493 k | OK | |
| SQUID bias C/Ret | 8 | 24 | — k | OK | |
| SQUID bias D/Ret | 23 | 39 | — k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 8.82 k | OK |
| Feedback B/Ret | 2 | 18 | 8.24 k | OK | |
| Feedback C/Ret | 41 | 25 | 9.17 k | OK | |
| Feedback D/Ret | 22 | 6 | 6.39 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 74.1, 34.5, 29.4, 29.7, 40.6 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 33.2, 33.4, 34.6, 33.4 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 34.1, 32.7, 23.3, 33.3 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 30, 30.3, 29.3, 29.6 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | 1735 | |
| QET A/QET C | 3 | 7 | 2535 | ||
| QET A/QET D | 3 | 38 | 2166 | ||
| QET B/QET C | 35 | 7 | 2626 | ||
| QET B/QET D | 35 | 38 | 2243 | ||
| QET C/QET D | 7 | 38 | 1079 | ||