2017/08/08 (Tuesday)
| Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4) | |
| 0915 | Tower = 25.7 mK, Still = 0.055 mbar, G1/G2 = 138/123 mbar, 1K Pot = 1.68 K / 26 mbar. MB = 30.9% |
| 0917 | Fill LN2 cold trap bath and tweak 1K pot needle valve |
| 0924 | Ground and bake detector for 5 mins |
| 1310 | Turn off DAQ front-ends for remote DAQ development work |
| 1449 | Begin LHe transfer @ MB = 21.3% |
| 1550 | Finish LHe transfer @ MB = 94.8% |
| 1725 | Fill LN2 cold trap bath |