| | Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4) |
| 1315 | Fill LN2 cold trap full. |
| 1330 | Tower/MC/Coldplate = 25.9/28.9/177 mK, Still = 1.2 K / 0.055 mbar, G1/G2 = 148/134 mbar, 1K Pot = 1.68 K / 26 mbar. MB = 60.4% (predicted level: 65.2%) |
| 1345 | Start sequence 16.5 hour data series of flash and take data DCRC1 = -2V, DCRC2 = 2V. 0.5 min flash, 60 min cool down, 60 min run time. Random rate = 0, N beginning of run randoms = 1000. (and otherwise same settings as yesterday.) |
| | Network issues occurred during this sequence and stopped it short. There are full sets of 1-hour data at 07170729_1446 and 07170729_1647, but nothing thereafter. |