Status: warming up. All mixture in dump. LN2 Cold Trap 1 warm and ready to pump out. IVC has about 1 atm of N2 @ RT. Cryostat vacuum jacket has He and N2 in it. 1K Pot needle valve open.
0211 Recovery meter = 312597.00 cuft. Recovery rate = 1 cuft/35 hours.
1000 MC(Cernox) = 249.0 K, rising at 1.8 K/hour. This suggests a warming time constant of 24.4 hours. At this rate it will take 45 hours to reach dew point (around 55 F). That's Thursday at 7am.
1000 Recovery meter = 312597.14 cuft. Recovery rate = 1 cuft/59 hours.
1035 Set MC and Still heaters to 20 mW each
1040 Let 19 mbar N2 gas into vacuum manifold. Then open cryostat vacuum jacket valve to let this into the vacuum jacket. Vacuum jacket → 1.4 mbar
Let another 19 mbar N2 gas into vacuum manifold. Then open cryostat vacuum jacket valve to let this into the vacuum jacket. Vacuum jacket → 1.6 mbar
1050 MC(Cernox) = 250.5 K, rising at 1.7 K/hour. Using room temp of 296.25 K this suggests a warming time constant of 26.9 hours. Dew point is around 10 C according to the lab thermometer and humidity meter. Should take 33.7 hours to reach due point. That's Wednesday night at 8:33 pm.
1230 Took down remaining shield and West lead wall.
1500 MC(Cernox) = 258.6 K, rising at 1.94 K/hour. This suggests a warming time constant of 19.4 hours (a little faster after turning on the heaters and adding more gas to the cryostat vacuum jacket). Should take 20.5 hours to reach dew point (50 F). That's tomorrow morning at 11:28.
1500 Recovery meter = 312597.23 cuft. Recovery rate = 1 cuft/57 hours.