2024/01/24 (Wednesday)
- Lab in-personnel: Himangshu
| Status | Run 79 beginning, LN2 transfer yesterday, mixture in fridge |
|---|
| 1250 | MC(Cernox) = 77.48 K, Sorb = 130.0 K, G2/G1/P1 (circulation) = 532/485/maxout mbar |
|---|---|
| 1255 | IVC = 2.2 mbar, Start pumping out IVC with Scroll Pump. When pressure falls below 0.1 mbar switch to Turbo Pump. |
| 1321 | P2 was maxed out when I came in. Connect the scroll pump and pump out that line. |
| 1322 | Fill LN2 cold trap dewar |
| 1330 | Turn on 3He pump and open V6 to 12.4%, reestablishing circulation like yesterday. G2/G1/P1 → 597/654/0.40 mbar and settle |
| 1334 | Close V12a+speedivalve for 2 minutes to assess throughput. G1 falls at 59 mbar/min, good. Reopen V12a+speedivalve |
| 1340 | Pump mixture to dump. Close V13a, open V3 (V9 already open), open V6 more in steps up to 30% |
| 1353 | G1 = 1.5 mbar, P1 = 0.095 mbar. Stop pumping mixture to dump. Close V12a+speedivalve, close V1, close V3, close V6 |
| 1356 | V6 is fully closed, close V9, leaving 644.1 mbar in the dump. Leave 3He pump on. |
| Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2 (within 100 mbar).
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1456 | Perform mixture throughput test at MC = 77 K using above procedure with 3He pump on. Let G1 rise to 360 mbar before Step 3, then it falls to 32 mbar, then rises. Throughput = 20 mbar/min. |
|---|---|
| 1500 | Open mixture to both sides of the fridge (V3) and cold LN2 Trap 1 (V12a+speedivalve). |
| 1504 | Turbo in IVC = 46 nbar, with the turbo valved out for a min, IVC = 460 nbar |
| 1507 | Pump IVC with Leak Detector, Turbo valved out, IVC = 1004 pbarL/s, with turbo= 233 pbar L/s |
| The leak checker was making a leak alarm noise once we valved the turbo out, but the rate is pretty low, we just turned its volume down… |
| 1620 | Electrical check of ZC-70 after connecting to Stripline 41 on Tower Face 5 with Cable 2 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 41 | ||
| SC: | none | 77 K | |||
| Face: | 5 | Date | 01/24/2024 | ||
| SQUET: | ZC-70 | Cable | 2 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | – k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.656 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 1.766 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.989 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | – k | OK |
| Feedback B/Ret | 2 | 18 | 9.19 k | OK | |
| Feedback C/Ret | 41 | 25 | 13.85 k | OK | |
| Feedback D/Ret | 22 | 6 | 16.94 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL,OL,OL, OL, OL | NOT OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 70, 66, OL, OL | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 45, 44.5, OL, OL | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 50.2, 50.9, OL, OL | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | |||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | 6K | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| open | |||||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | 1.384 | |
| LED 2 | chassis | 26 | 1.295 | ||
| Motor Coil X1 | 169 | OPEN | |||
| Motor Coil X2 | 169 | 72.5 | |||
| Motor Coil Y1 | 169 | 95.3 | |||
| Motor Coil Y2 | 169 | 86.3 | |||
| Xendstop | 1k | - | |||
| Yendstop | 1k | 234 | |||
| 1402 | Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2 on Cable 3 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 43 | ||
| SC: | none | 77 K | |||
| Face: | 2 | Date | 01/24/2024 | ||
| SQUET: | ZC-13 | Cable | 3 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 1.736 k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.857 k | OK | |
| SQUID bias C/Ret | 8 | 24 | – k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.892 k | NOT OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 7.47 k | OK |
| Feedback B/Ret | 2 | 18 | 8.01 k | OK | |
| Feedback C/Ret | 41 | 25 | – k | OK | |
| Feedback D/Ret | 22 | 6 | 8.42 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 63.1, 41.3, 38.9, 39.1, 43.7 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 109.7, 84.9, 106.8, 84.2 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 38.6, 37.5, 28.1, 36.9 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 66, 44, 43, 43.5 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
| 1310 | Electrical check of ZC-31 after connecting to Stripline 48 on Tower Face 3 on Cable 1 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 48 | ||
| SC: | none | 77 K | |||
| Face: | 3 | Date | 01/24/2024 | ||
| SQUET: | ZC-31 | Cable | 1 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | – | OK |
| SQUID bias B/Ret | 19 | 34 | 1.710 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 1.766 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.99 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | – k | OK |
| Feedback B/Ret | 2 | 18 | 9.19 k | OK | |
| Feedback C/Ret | 41 | 25 | 13.85 k | OK | |
| Feedback D/Ret | 22 | 6 | 16.94 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL, OL.OL.OL.OL | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 48, 48, OL, OL | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 45, 45, OL, OL | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 52, 51, OL, OL | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | 5.76k | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
| 1700 | Open V6 to 12.4% to restart flow, close v3 |
|---|---|
| 1713 | Start LN2 transfer to topup for tonight. Blowout will be done tomorrow |
| 1714 | MC(Cernox) = 77.5 K, Sorb = 130.6 K, IVC = –, G2/G1/P1 (circulation) = 592/648/0.6 mbar, Level resistor = 1.311 kΩ. |
| 1747 | MC(Cernox) = 77.5 K, Sorb = 130.6 K, IVC = –, G2/G1/P1 (circulation) = 592/648/0.6 mbar, Level resistor = 1.339 kΩ. |
| 1756 | Stop LN2 transfer. Close LN2 Dewar valve. Pull out Level Resistor and put stopper in port. Put ping-pong ball on MB exhaust port. |
| 1756 | Close V6 and turn off 3He pump. |