2021/10/14 (Thursday)
- Lab in-personnel: Matt, Derek, Giulia, Giovanna
| Status | Run 75 prep. |
|---|---|
| All mixture is in dump. Fridge isolated. 1K Pot isolated. LN2 Trap 2 still has contaminants in it. MB in pit, clean tent erected. Cryostat vacuum jacket (CVJ) pumped out. IVC open. Tower removed. | |
| Reattach more of the resistors on the HV board | |
| Find Dsub15 connector to use to connect new thermometer to LakeShore bridge. But need to figure out how to do the wire crimping. | |
| Connector more twisted pairs to phonon channel connectors. 7 of 12 finished. |