2023/10/26 (Thursday)
- Lab in-personnel: Himangshu, Ping
| Status | Run 78 beginning, LN2 transfer yesterday, mixture in fridge |
|---|---|
| 1144 | MC(Cernox) = 77.13 K, Sorb = 121.3 K, G2/G1/P1 (circulation) = 587/544/(maxout) mbar |
| 1145 | IVC = 2.5 mbar, Start pumping out IVC with Scroll Pump. When pressure falls below 0.1 mbar switch to Turbo Pump. |
| 1150 | Fill LN2 cold trap dewar |
| 1153 | While we wait for the cold trap 1 to get filled up, take electrical checks on the three cables |
| 1217 | Turn on 3He pump and open V6 to 12.4%, reestablishing circulation like yesterday. G2/G1/P1 → 656/709/0.5 mbar and settle |
| 1223 | Close V12a+speedivalve for 2 minutes to assess throughput. G1 falls at 69 mbar/min. Reopen V12a speedivalve |
| 1227 | Pump mixture to dump. Close V13a, open V3 (V9 already open), open V6 more in steps up to 30% |
| 1245 | G1 = 1.4 mbar, P1 = 0.065 mbar. Stop pumping mixture to dump. Close V12a+speedivalve, close V1, close V3, close V6 |
| 1247 | V6 is fully closed, close V9, leaving 719.1 mbar in the dump. Leave 3He pump on. |
| Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 is cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2 (within 100 mbar).
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1254 | Perform mixture throughput test at MC = 77 K using above procedure with 3He pump on. Let G1 rise to 568 mbar before Step 3, then it falls to 76 mbar, then rises. Throughput = 50 mbar/min. |
|---|---|
| 1256 | Open mixture to both sides of the fridge (V3) and cold LN2 Trap 1 (V12a+speedivalve). |
| 1258 | Turbo on IVC = 25 nbar, with the turbo valved out for a min, IVC = 300 nbar |
| 1259 | Pump IVC with Leak Detector, Turbo valved out, IVC = 270 pbarL/s | ||||
|---|---|---|---|---|---|
| The leak checker was making a leak alarm noise once we valved the turbo out, but the rate is high, Doing a leak check now. | |||||
| 1543 | We will do another LN2 transfer to keep the fridge at 77K . We will do LN2 blowout tomorrow. | ||||
| 1154 | Electrical check of ZC-70+interposer after connecting to Stripline 41 on Tower Face 5 with Cable 2 | ||||
| Detector: | S104 | Stripline | 41 | ||
| SC: | none | 77 K | |||
| Face: | 5 | Date | 26/10/2023 | ||
| SQUET: | ZC-70 | Cable | 2 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | - | OK |
| SQUID bias B/Ret | 19 | 34 | 1.65 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 1.758 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.985 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | - k | OK |
| Feedback B/Ret | 2 | 18 | 9.15 k | OK | |
| Feedback C/Ret | 41 | 25 | 13.82 k | OK | |
| Feedback D/Ret | 22 | 6 | 16.90 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL,231,OL, OL, OL | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 57, 58, OL, OL | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 45, 42, OL, OL | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 48, 49, OL, OL | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | |||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| open | |||||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
| Motor Coil X1 | 65.3 | ||||
| Motor Coil X2 | 77.8 | ||||
| Motor Coil Y1 | 66.7 | ||||
| Motor Coil Y2 | 53.8 | ||||
| 1204 | Electrical check of ZC-39 after connecting to Stripline 48 on Tower Face 3 on Cable 1 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 43 | ||
| SC: | none | 77 K | |||
| Face: | 2 | Date | 26/10/2023 | ||
| SQUET: | ZC-39 | Cable | 1 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 1.631 k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.504 k | OK | |
| SQUID bias C/Ret | 8 | 24 | open | OK | |
| SQUID bias D/Ret | 23 | 39 | open | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 8.82 k | OK |
| Feedback B/Ret | 2 | 18 | 8.24 k | OK | |
| Feedback C/Ret | 41 | 25 | - | OK | |
| Feedback D/Ret | 22 | 6 | - | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 56, 36, 33, 33, 53 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 52, 50, 68, 50 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 37, 31, 24, 32 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 34, 35, 34, 34 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
| 1211 | Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2 on Cable 3 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 48 | ||
| SC: | none | 77 K | |||
| Face: | 3 | Date | 26/10/2023 | ||
| SQUET: | ZC-13 | Cable | 3 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 1.729 k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.911 k | OK | |
| SQUID bias C/Ret | 8 | 24 | — k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.889 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 7.45 k | OK |
| Feedback B/Ret | 2 | 18 | 7.98 k | OK | |
| Feedback C/Ret | 41 | 25 | – k | OK | |
| Feedback D/Ret | 22 | 6 | 8.39 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 65, 40, 38, 38, 43 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 77, 76, 107, 85 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 43, 35, 26, 35 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 62, 44, 43, 44 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
| 1621 | LN2 dewar refill calculations: Offset: 246 lbs, Fill weight: 30, Weight with partially filled dewar: 175 lbs, With the lines: 179.5 lbs. Amount of liquid in the partially filled dewar: (175+246-201.5) = 219.5 lbs== 99.56 litres. Initial reading on meter at start of fill will be 206-246 = -46. Amount of liquid filled: (46+30)= 76 lbs == 34.4 litres |
|---|---|
| 1711 | MC(Cernox) = 77.1 K, Sorb = 121.7 K , IVC = 1.6 mbar, G2/G1/P1 (circulation) = 545/585/1000 mbar, Level resistor = 1.348 kΩ. |
| 1716 | No change in level resistor for a while. Stop LN2 transfer. Close LN2 Dewar valve. Pull out Level Resistor and put stopper in port. Put ping-pong ball on MB exhaust port. |