UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20240125

2024/01/25 (Thursday)

Previous Day

  • Lab in-personnel: Shubham, Ping, Himangshu
Detector: S104 Stripline 41
SC: none 77 K
Face: 5 Date 01/24/2024
SQUET: ZC-70 Cable 2
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k – k OK
SQUID bias B/Ret 19 34 1.665 k OK
SQUID bias C/Ret 8 24 1.764 k OK
SQUID bias D/Ret 23 39 1.999 k OK
Feedback A/Ret 37 21 15 - 25 k 14.65k k OK
Feedback B/Ret 2 18 9.18 k OK
Feedback C/Ret 41 25 13.84 k OK
Feedback D/Ret 22 6 16.93 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 OL, 80 ,OL, OL, OL NOT OK
QET B/Ret 35 29, 33, 47, 48 44, 44, OL, OL OK
QET C/Ret 7 5, 9, 10, 28 48, 44.9, OL, OL OK
QET D/Ret 38 36, 40, 43, 44 54, 55.7, OL, OL OK
QET A/QET B 3 35 1000-3000 open
QET A/QET C 3 7 open
QET A/QET D 3 38 open
QET B/QET C 35 7 5.9K
QET B/QET D 35 38 open
QET C/QET D 7 38 open
open
LED 1 chassis 42 1.0 - 1.1 V 1.385
LED 2 chassis 26 3.0
Motor Coil X1 169 OPEN
Motor Coil X2 169 111
Motor Coil Y1 169 96
Motor Coil Y2 169 86
Xendstop 1k -
Yendstop 1k 234
1346 Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2 on Cable 3
Detector: S104 Stripline 43
SC: none 77 K
Face: 2 Date 01/24/2024
SQUET: ZC-13 Cable 3
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 1.735 k OK
SQUID bias B/Ret 19 34 1.857 k OK
SQUID bias C/Ret 8 24 – k OK
SQUID bias D/Ret 23 39 1.892 k NOT OK
Feedback A/Ret 37 21 15 - 25 k 7.47 k OK
Feedback B/Ret 2 18 8.01 k OK
Feedback C/Ret 41 25 – k OK
Feedback D/Ret 22 6 8.41 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 64.9, 41.3, 38.9, 39.2, 43.6 OK
QET B/Ret 35 29, 33, 47, 48 65.7, 63.2, 70.6, 63.1 OK
QET C/Ret 7 5, 9, 10, 28 38.7, 37.6, 28.6, 37.0 OK
QET D/Ret 38 36, 40, 43, 44 59.2, 53.5, 52.5, 52.8 OK
QET A/QET B 3 35 1000-3000 open
QET A/QET C 3 7 open
QET A/QET D 3 38 open
QET B/QET C 35 7 open
QET B/QET D 35 38 open
QET C/QET D 7 38 open
LED 1 chassis 42 1.0 - 1.1 V -
LED 2 chassis 26 -
1355 Electrical check of ZC-31 after connecting to Stripline 48 on Tower Face 3 on Cable 1
Detector: S104 Stripline 48
SC: none 77 K
Face: 3 Date 01/24/2024
SQUET: ZC-31 Cable 1
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 1.643 k OK
SQUID bias B/Ret 19 34 1.354 k OK
SQUID bias C/Ret 8 24 1.761 k OK
SQUID bias D/Ret 23 39 1.372 k OK
Feedback A/Ret 37 21 15 - 25 k 10.99 k OK
Feedback B/Ret 2 18 10.9 k OK
Feedback C/Ret 41 25 10.11 k OK
Feedback D/Ret 22 6 10.96 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 72, 36.2, 32.7, 33.0, 51 OK
QET B/Ret 35 29, 33, 47, 48 54, 54, 55, 54 OK
QET C/Ret 7 5, 9, 10, 28 36, 32, 25.0, 35.0 OK
QET D/Ret 38 36, 40, 43, 44 97.8, 98, 97, 98.6 OK
QET A/QET B 3 35 1000-3000 open
QET A/QET C 3 7 open
QET A/QET D 3 38 open
QET B/QET C 35 7 open
QET B/QET D 35 38 open
QET C/QET D 7 38 6.11k
LED 1 chassis 42 1.0 - 1.1 V -
LED 2 chassis 26 -
1429 Pump IVC with Leak Detector, Turbo valved out, IVC = 62 pbarL/s, with turbo= 12 pbar L/s
1440 Turn on 3He pump and open V6 to 12.4%, reestablishing circulation like yesterday. G2/G1/P1 → 597/654/0.5 mbar and settle
1450 Pump mixture to dump. Close V13a, open V3 (V9 already open), open V6 more in steps up to 30%
1458 G1 = 1.6 mbar, P1 = 0.026 mbar. Stop pumping mixture to dump. Close V12a+speedivalve, close V1, close V3, close V6
1504 V6 is fully closed, close V9, leaving 643.9 mbar in the dump. Leave 3He pump on.
Throughput test procedure, Cold Trap 1:
  1. All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
  2. Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2 (within 100 mbar).
  3. Close V12a+speedivalve and V3, open V1
  4. monitor G1
1520 Perform mixture throughput test at MC = 77 K using above procedure with 3He pump on. Let G1 rise to 450 mbar before Step 3, then it falls to 50 mbar, then rises. Throughput = 30.4 mbar/min.
1522 Open mixture to both sides of the fridge (V3) and cold LN2 Trap 1 (V12a+speedivalve).
1543 Begin blowing out LN2 (following Blow Out Liquid Nitrogen). Main bath (G3) → 335 mbar+1atm
1555 IVC = 79 pbarL/s, MB = 332 mbar+1atm
1615 IVC = 78 pbarL/s, MB = 110 mbar+1atm
1256 LN2 blowout is complete. G3 at 110 mbar and stable. Close V2A, V5A, V4A, and V1A. Close the He gas supply and the valve on the gas line.
Wait for the rubber hose to warm up to remove the tubing from the transfer stick, and then plug the transfer stick. Now you will check to see if the MB is empty. You are going to pump on the MB with the scroll pump.
1312 IVC = 450 pbarL/s
1730 Restarting LN2 transfer, Level resistor = 1.258 kΩ
1819 Level resistor = 1.340 kΩ and constant. Stop LN2 transfer. Close LN2 Dewar valve. Pull out Level Resistor and put stopper in port. Put ping-pong ball on MB exhaust port. Turn off 3He pump.

Blow Out Liquid Nitrogen

Now you are going to pump out the LN2 that was used to cool the fridge to 77 K. The LN2 is going to get pushed out of the MB with He gas, and while this is happening you will monitor the helium leak rate.

  1. Turn on the leak checker and let it warm up for 20 minutes. Once warmed up, calibrate the leak checker.
  2. Connect leak checker to IVC. First, evacuate the line connecting the leak checker to pumping manifold first (using the scroll pump), and then open the valve connecting to IVC. Take a background reading. Note it in the run diary.
  3. Remove the rubber stopper from the transfer stick and attach the rubber hose to the transfer stick (as you did previously when preparing for the LN2 transfer). Make sure that the transfer stick hasn't moved vertically at all. We want it to be < 1/8“ from where it hit the transfer cone. If the transfer stick is not within the cone, you won't be able to remove all of the LN2.
  4. Attach a short metal transfer stick to the other end of the long rubber hose and insert this into a bomb dewar (holds 25 L).
    1. Make sure there is room for the hose to wiggle (and contract) when it's become frozen by the LN2.
    2. Make sure there is an extra bomb dewar close by in case the first one fills up.
  5. Seal the end of the He recovery line (where it connects to the top of the fridge) with a KF-25 blank.
  6. Make sure the He recovery valves on the wall are closed.
  7. Make sure all the valves on the right-hand side of the IGH are closed. Open the He gas cylinder. Open the He gas valve on the wall near the IGH - there should be a hose from this port to the vent inlet.
  8. Make sure that the manual valve on the 4He pumping line is closed and that the 1K Pot speedivalve is closed.
  9. Open the vent speedivalve, then open V2a, V5a, V4a, and V1a.
  10. Check - is the leak checker reading the background of the IVC? Did you record the background rate?
  11. Remove the blank from the end of the He recovery line. Allow helium to flow through for several seconds to purge the line. Then connect the recovery line to the main bath port at the top of the fridge.
  12. You are now pressurizing the main bath with helium gas. This should push LN2 out of the main bath. The rubber hose will get cold and stiff.
  13. Monitor G3 and make sure it doesn't go above 350 mbar. If it does, slightly close the regulator valve on the He gas tank and monitor the change.
    1. The reason you closed the large speedivalve on the He-4 pump is to protect it during this process. If the valve is not closed and the pressure of the gas goes above 400 mbar, the pressure from the gas in the line will cause oil to be pushed out of the He4 pump. This is a MESS to clean up and recover from. (outdated: we now isolate the pump with a manual valve.)
  14. LN2 will begin to flow out of the MB and into the bomb dewar. This process should take about 1.5 hours; keep monitoring the leak rate throughout this time. Be ready to switch bomb dewars.
  15. When the pressure reading in G3 drops significantly, the LN2 is almost completely out. Check the leak rate and record this value in the run diary.
  16. Close V2A, V5A, V4A, and V1A. Close the He gas supply and the valve on the gas line. Wait for the rubber hose to warm up to remove the tubing from the transfer stick, and then remove the transfer stick and plug the fridge port. Now you will check to see if the MB is empty. You are going to pump on the MB with the scroll pump.
  17. Open V4A and V1A.
  18. Turn on the scroll pump and open its inlet valve a small amount until it starts making noise. You are now evacuating the MB, continue to slowly open the scroll pump until P2 reads less than 1 mbar.
  19. If the pressure of P2 is not less than 1 mbar, you have LN2 left in the main bath. The reason for this could be that the transfer stick is too high or that you actually ran out of He-4 gas to push out the LN2. Check the positioning of the transfer stick and the amount of He-4 gas left in the gas tank. Once you have found the cause for the LN2 not being pushed out and corrected it, you will need to re-start the flow of He-4 gas to the MB.
    1. Isolate the main bath (close V4A and V1A).
    2. Open the valve on the He-4 gas tank. Make sure the valve on the copper gas line is closed.
    3. Evacuate the clear hose leading to the valve on the gas line by opening V2A and V5A (as you've done before).
    4. Close V4A and V1A.
    5. Open the He-4 gas valve on the gas line.
    6. Turn off the He-4 pump.
    7. Go to the pump room and close the large speedivalve on the He-4 pump.
    8. Open V2A, V5A, V4A.
    9. As before, open V1A when the pressure goes above 70 mbar, but make sure it doesn't rise too high.
    10. Hopefully you will see the hose start to cool, which means more LN2 is being blown out. When the hose becomes limp again, you can stop the He gas flow and stopper the transfer stick. Repeat the test of evacuating the MB with the He-4 pump (described in previous steps) to make sure all of the LN2 is out. Make certain that when you are ready to pump with the He-4 pump that the large speedivalve on the pump is opened. When conrmed that there is no LN2 left in the MB, continue to the next step.
  20. At this point the MB is being pumped on by the He-4 pump and you've confirmed that all of the LN2 is out. Isolate the He-4 pump and flush the MB with He-4 gas. This step is necessary to remove the LN2 transfer stick from the MB because we don't want air to rush in and freeze when you unplug the exhaust port. If you need to remind yourself how to do this, review section in appendix on how to pump and flush the MB.
  21. Confirm that the He-4 gas supply is off. The main bath should be full of He-4 gas.
  22. Remove the LN2 transfer stick and replace the plug into that exhaust port.
  23. Evacuate the MB again. This must be done before the LHe transfer (review explicit instructions to do so in the `Pump and Flush MB'section in the appendix).
  24. If necessary, you can use the recovered LN2 to fill the LN2 cold trap. See the appendix on how to do so.