2023/11/30 (Thursday)
- Lab in-personnel: Himangshu, Zach
| Status | Run 78 ending. |
|---|---|
| 1300 | Fridge ran out of LHe, G1>999mbar, G2~900-1000mbar |
| 1305 | Close V6, then close V13A and open V9, then begin to open V6 again and open V3 |
| 1316 | Close 1K Pot needle valve |
| 1318 | Close V1 and still gate valve, to pump just on LN2 Trap 1 until it's empty. |
| 1320 | Close 1K Pot speedivalve, V4a, 4He pump inlet valve. Turn off 4He pump. Close recovery valve to 4He pump outlet. NOTE: remember to open recovery valve when the pump is turned back on. |
| 1325 | Isolate LN2 Trap 1 which is now pumped (P1<.1mbar) out to dump (close V12a and speedivalve) |
| 1326 | Continue pumping on the fridge lines (open Still Gate Valve and V1) |
| 1332 | MC/Still/1K Pot/Sorb = 0.98/3.2/>7/13 K |
| 1341 | Stop pumping out fridge (close V1, V3, Still Gate valve, Condenser speedivalve). G2(Dump) = 635.6 mbar |
|---|---|
Ptrue[mbar] = Pdisplay[mbar] + ( Pbar[inHg] - 29.92 ) * 33.86
| 1344 | MC = 1.29 K. Sorb = 14.1 K |
|---|---|
| 1348 | Close V6. G2 = 636.0 mbar. Corrected dump pressure = 632.95 mbar. |
| 1348 | Isolate dump (close V9) and turn off 3He pump. |
| 1430 | Add a tube length of He exchange gas to the IVC (turbo and CVJ closed). IVC = 22 ubar, MC= 5.25K |
| 1438 | Add another tube length of exchange gas. Now IVC = 40 ubar, MC = 5.31 K |
| 1441 | Add another tube length of exchange gas, now IVC = 74 ubar, MC = 5.31 K |
| 1449 | Add 1.5 more tube lengths of exchange gas, now IVC = 0.12 mbar, close IVC valves. |
| 1455 | Pump out line to CVJ |
| 1505 | Add 1 tube length of He exchange gas into the pump manifold (turbo, IVC, and CVJ closed) then let the exchange gas into the CVJ. |
| 1506 | He recovery meter starting to turn faster |
Check bag level in He liquifiying room, was at around 90% with 1 pump on so turn on the 2nd pump
| 1507 | CVJ = 0.22 mbar, MC temp rising |
|---|
1644 CVJ = 0.03 mbar, recovery meter turning slowly.
1645 Add another tube length of He exchange gas directly into the CVJ, CVJ = 0.25 mbar