UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160922

2016/09/22 (Thursday)

Previous Day

DCRC1 and DCRC3 powered on and connected through HV setup EBoxDIB 2/3 → 3.2 MHz filters → Cables → remapping board I/remapping board II → HVside2board “DIB1”/“DIB2” → DCRC55(1)/50(3). Remapping boards have all possible lines switched off. .
Baked using IR LEDs for 12 hours last night. Tower was at 0.55 K until 06:12 then fell to base over about 50 minutes.
0835 Tower/MC/Coldplate = 90/57/??(1.9 kΩ) mK, Still = 1.12 K / 95 μbar, G1/G2 = 175/160 mbar, 1K Pot = 1.57 K / 6.0 mbar. MB = 77.3%
The thermometers connected to “FRIDGE OUT 1”/“SENSOR 1” cable to the thermometer breakout box seem to be reading wrong. Coldplate is off scale, Still is higher than usual, MC Sensor = 78 mK
Boiloff rate: good. Yesterday the main bath pressure was released at 10, 30, and 85 minutes after a 94.5% fill (unusually high)
1K Pot has been pretty stable.
0840 LN2 storage Dewar is empty…
0845 Set still heater to 2.0 mW. Doesn't really help the base, tower becomes a bit oscillatory, 87-91 mK
0915 Turn off still heat
1012 Tower temp seems more stable, 87-89 mK, but varying more slowly than during still heating.
1020 Manually start 15min background data series at HV = -12V, DCRC1/Readout= 12V with FG=5, OG=8, with 1000 initial randoms, 1000 ending randoms with 150 ADC Bin trigger threshold on DIB1 Qo.
1038 Cease data run. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1050 Place Ba source near top of shield.
1058 Manually start 15min background data series at HV = 12V, DCRC1/Readout= -12V with FG=5, OG=8, with 1000 initial randoms, 1000 ending randoms with 150 ADC Bin trigger threshold on DIB1 Qo.
1114 Cease data run. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1134 Fill LN2 cold trap full.
1136 Manually start 15min background data series at HV = -11V, DCRC1/Readout= 11V with FG=5, OG=8, with 1000 initial randoms, 1000 ending randoms with 150 ADC Bin trigger threshold on DIB1 Qo.
1152 Cease data run. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1220 Manually start 15min background data series at HV = 11V, DCRC1/Readout= -11V with FG=5, OG=8, with 1000 initial randoms, 1000 ending randoms with 150 ADC Bin trigger threshold on DIB1 Qo.
1237 Cease data run. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1301 Manually start 15min background data series at HV = -10V, DCRC1/Readout= 10V with FG=5, OG=8, with 1000 initial randoms, 1000 ending randoms with 150 ADC Bin trigger threshold on DIB1 Qo.
1324 Cease data run. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1335 Watch pulses while raising and lowering Ba-133 source. Find that 8“ below top of shield strikes a good balance between more events but not too much pileup. Increase DIB1 Qo trigger threshold to 200 ADC Bin.
1345 Cease data run. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1500 Cease data tests. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1516 Manually start 15min background data series at HV = 36V, DCRC1/Readout= -12V, with 1000 initial randoms, 1000 ending randoms with 200 ADC Bin trigger threshold on DIB1 Qo.
1542 Cease data tests. Ground detector, flash with IR LEDs for 30s, then cool down for 20 minutes.
1600 Manually start 15min background data series at HV = 10V, DCRC1/Readout= -10V, with 1000 initial randoms, 1000 ending randoms with 200 ADC Bin trigger threshold on DIB1 Qo.
1620 Cease data tests. Ground detector, flash with IR LEDs for 30s, then cool down for 10 minutes.
1633 Manually start 15min background data series at HV = -9V, DCRC1/Readout= 9V, with 1000 initial randoms, 1000 ending randoms with 200 ADC Bin trigger threshold on DIB1 Qo.
1700 Cease data tests. Ground detector, flash with IR LEDs for 30s, then cool down for 10 minutes.
1714 Manually start 15min background data series at HV = 9V, DCRC1/Readout= -9V, with 1000 initial randoms, 1000 ending randoms with 200 ADC Bin trigger threshold on DIB1 Qo.
1731 Cease data tests. Ground detector, flash with IR LEDs for 30s, then cool down for 10 minutes.
1734 While cooling down, flip switches on HV Boards to use UV LEDs, and change Flash&Flash code.
1740 Place Ba source back in safe.
Fill LN2 cold trap full.
1744 Ready for 0V overnight data. Use Flash&Take script. Start 4 hours of 20min background data series at HV = 0V, DCRC1/Readout= 0V, with 1000 initial randoms, 1000 ending randoms with 150 ADC Bin trigger threshold on DIB1 Qo.
2255 Commence 8 hour UV bake.

Next Day