Previous Day

  • Lab in-personnel: Matt
Status Run 76 ending
Setup DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe removed from lab.
Warming up. Turbopumping cryostat vacuum jacket overnight. Mixture in dump. Mixture removed from LN2 Trap 1 but it still has contaminants. Some He exchange gas IVC. North and south lead removed from shield. NaI array powered down and vertical stack of NaI detectors (detectors 1-20) removed and put in cushioned boxes in LIGO lab.
1155 Turbo on cryostat vacuum jacket (CVJ) = 140 nbar. With Turbo valved out for a minute CVJ = 4.0 ubar. That seems kind of high.
Last time it got down to 0.74 ubar.
1200 MC(Cernox) = 277.2 K
MC hit 34 F = 274.26 K (approximately dew point) at 1:10 am this morning
1310 Check contents of warm LN2 Trap 1: 155 mbar. Pump out with Scroll pump.
1315 Remove poly from North side of shield, store in storage closet
1325 Remove short boron socks from around bottom NaI detector layer.
1330 Remove PMT bases from ends of bottom layer NaI detectors 21, 22, 23
Note: NaI Detector 21 is in West side and 23 on East side of thelab
1350 Disconnect top bars from NaI rack that anchor it to the fridge stand. Then remove the NaI rack and put it in the LIGO lab.
1355 Remove lead sheets from floor of fridge shield, store in LIGO lab
1410 Remove E and W shield walls from lab, store them in storage closet
1425 Start pumping out IVC with Scroll pump. Planning to do the leak checks again, maybe we'll get a lower background at room temperature. Took 10 or 15 minutes to get below 0.1 mbar, then switched to Turbo pump.
1545 Leak detector on IVC = 927 pbarL/s. Squirt some helium at stripline elbow: signal increases to above 1000 pbarL/s. Repeat, signal peaks from 930 to 970 pbarL/s.
1600 Raise stripline elbow by wedging apart the two compression rings and shoving some washers between them. Connect leak checker to IVC again - background much higher, 3000 pbarL/s, but falling.
1605 LD on IVC relaxes to 800 pbarL/s. Squirt helium at stripline elbow, peaks to 850 pbarL/s.
1610 Try pushing vacuum grease into gap between compression rings and up using wood coffee stirrer. Try to work it all the way around, move the washers holding it up to one side to get that area too.
1615 LD on IVC = 745 pbarL/s. Squirt helium at stripline elbow, peaks to 785 pbarL/s.
1620 Remove washers and lower stripline elbow down as low as possible, so compression rings are touching.
1620 LD on IVC = 730 pbarL/s. Squirt helium at stripline elbow, peaks to 778 pbarL/s. No improvement.
1625 LD on IVC = 690 pbarL/s. Let mixture into fridge through V14, V3, V1, Still Gate valve, Condenser Speedivalve. No change in leak signal.
1630 Pump mixture back to dump. Open V6 to 13% at first, wait for fridge pressure to start to fall. Then open V6 to ~30%.
1645 Finish pumping mixture to dump. Close fridge valves and all IVC valves, turn off 3He pump.