UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20221009

2022/10/09 (Saturday)

Previous Day

  • Lab in-personnel: Giulia
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe source behind lead wall on West side of lead/poly shield.
NaI trigger window: 7.6-11.2 MeV
Cooled to base three days ago after twelfth 5K pumpout.
1025 Check phonon channels - elevated baselines, no pulses, looks like they've gone normal
1030 MC base around 31.2 mK
1030 MC/Coldplate = 31.2/151 mK, Still = 1.13 K / 0.110 mbar / 0 mW, G1/G2 = 112/108 mbar, 1K Pot = 45° / 1.58 K / 11±1 mbar
1030 Close V6 to stop circulation
1050 Turn off 3He pump
1550 Fill LN2 cold trap bath
1555 Close 1K Pot needle valve
1610 Close 1K Pot speedivalve, V4a, 4He pump inlet valve. Close recovery valve to 4He pump outlet. NOTE: remember to open recovery valve when the pump is turned back on.
1645 Turn off 4He pump.
1645 Turn on Still and MC heaters to 20 mW each

Next Day