2017/12/17 (Sunday)
| Setup: DIB1/3/4 → SL 27/19/20 → 3.2 MHz filters → cables 2,1,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3). DCRC4 → HV power supply. | |
| 1800 | Tower/MC/Coldplate = 21.5/25.5/148 mK, Still = 1.3 K / 0.100 mbar, G1/G2 = 237/218 mbar, 1K Pot = 1.62 K / 26 mbar, MB = 20.9% |
| 1805 | Fill LN2 cold trap bath. |
| 1808 | Begin LHe transfer @ 21.1% |
| 1850 | End Lhe transfer @ 89.9% |
| 1910 | Restore QET biases to their standard positive values. |