2022/09/30 (Friday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe source in storage in PAN443.
NaI trigger window: 7.6-11.2 MeV
Cooled to base three days ago after tenth 5K pumpout. Taking SiHV-triggered -80V background data with low trigger overnight
1000 Last night's data shows a decrease in dump sizes which is an indicator of when the helium films started killing the TES sensitivity.

At first dump sizes rose, maybe indicating increasing noise. Then around 10:30pm they started to fall. That's around dump 350
MC temperature pattern is a bit different. An increase in baseline from 29.4→29.8 mK around 9:30 pm, then another increase from 29.8→30.4 around 2:20 am. The change in dump sizes occurred between these two time points.
1000 Phonon baselines are high, DCRC1pA/B/D/DCRC3pA/B/C = -0.711/-0.665/-0.698/-0.638/-0.614/-0.668. Note that they are highest for the outer-ring channels (DCRC3pA&B)
1000 HV = -92.9 V, Vtest = -22.5 mV, Ileak = -24.7 uA, Vdet = -83 V (89%).
1020 Dial HV down to 0V
1020 Close V6 to stop circulation
1030 Turn off 3He pump
1205 Close 1K Pot needle valve
1215 Open V3; G1 falls, so this let mixture from Condenser side over to Still side.
1220 Close 1K Pot speedivalve, V4a, 4He pump inlet valve. Turn off 4He pump. Close recovery valve to 4He pump outlet. NOTE: remember to open recovery valve when the pump is turned back on.
1220 Turn on Still and MC heaters to 20 mW each
1330 G1(fridge) = 840 mbar.
Open V9 to release mixture into dump.
1420 MC reaches 5.78 K and is flat.
1500 Sorb reaches 7.5 K, flat.
1510 1K Pot reaches 6.0 K, still rising but only slowly.
1520 Wedge a a layer of two washers between the knurled knobs of the stripline elbow on the side near the center of the fridge. I think this is about as far up as it will go.
1525 Turn off DAQ programs and unplug DCRCs 1&3
1525 Check pressure in IVC: 0.14 ubar. A bit higher this time…
1525 Star pumping out IVC with turbo pump
1535 Fill LN2 cold trap bath
1539 Begin LHe transfer @ MB = 31.2%
1555 Bring PuBe source from storage in PAN443 back to its standard position in the K100 lab PAN43, behind the lead wall on the West side of the lead/poly shield.
1625 End LHe transfer @ MB = 94.6%
1715 MC/1Kpot/Sorb = 10.00/5.97/7.5 K
Turn off MC and Still heaters

Next Day