UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230123

2023/01/23 (Monday)

Previous Day

  • Lab in-personnel: Zach
Status Run 77 preparation
Setup DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
IVC closed and Turbo pumping for a while. No tower - this was just for a leak test.
1130 Check contents of warm LN2 Trap 1: 10.1 mbar. Pump it out with the scroll pump.
1137 G1 = 2.0 and stable, stop pumping on trap 1.
1140 Insert cold trap 1 into the LN2 bath, begin filling with LN2.
1152 Begin cryocleaning through cold trap 1.
1157 Open V6 to 12.1% to restart flow
1205 Open V6 to 12.4% to restart flow, G2 started rising too quickly, turn back to 12.1%
1223 Mixture is flowing but G2 (569) is a bit lower than G1 (623), trying increasing V6
1226 V6 increased to 12.4%, but G2 still settles to the same value, ill leave it here.
1242 Open V6 to 12.5% to restart flow
1311 Open V6 to 12.6% to restart flow
1340 Stop cryocleaning through LN2 trap 1, pump mixture to dump.
1353 G1 = 1.8 mbar and stable, close all valves, leaving 722.2 mbar in the dump
1357 Remove cold trap 1 from the LN2 bath
1400 Check contents of warm LN2 Trap 2 again: 4.6 mbar. Pump it out with the scroll pump.
1406 G1 = 2.0 and stable, stop pumping on trap 2.
1408 Insert cold trap 2 into the LN2 bath.
1430 Begin cryocleaning through cold trap 2.
1437 Open V6 to 12.4 to restart flow
1445 Add copper tape on top of the tower (on the bottom of the 2d source mover plate) covering holes and gaps to block IR
1455 Stop cryocleaning through cold trap 2, pump mixture to dump
1510 G1 = 1.5 mbar and stable, close all valves, leaving 725.6 mbar in the dump
1513 Turn off 3He pump, remove cold trap 2 from the LN2 bath
1420 Electrical check for ZC31
Detector: Type standard
SC: none 300 K
Face: Date 1/23/2023
SQUET: ZC-31 Who HN
Signal Pin1 Pin2 Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 16 3 3 - 5 k 4.163 kΩ ok
SQUID bias B/Ret 27 39 3.973 k ok
SQUID bias C/Ret 19 6 4.441 k ok
SQUID bias D/Ret 30 42 4.076 k ok
Feedback A resistor+coil 28 41 15 - 25 k 26.60 k ok
Feedback B resistor+coil 14 1 26.05 k ok
Feedback C resistor+coil 31 44 27.93 k ok
Feedback D resistor+coil 17 5 26.71 k ok
QET A input coil resistance 2 2, 10, 11, 12, 13 15.92 k ok
QET B input coil resistance 4 47, 48, 49, 50 16.07 k ok
QET C input coil resistance 6 11, 4, 7, 8, 9 19.02 k ok
QET D input coil resistance 8 40, 43, 45, 46 16.67 k ok
1448 Started electrical check for ZC-26
Detector: Type flipped
SC: none 300 K
Face: Date 1/23/2023
SQUET: ZC-26 Who HN
Signal Pin1 Pin2 Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 16 3 3 - 5 k 4.654 kΩ ok
SQUID bias B/Ret 27 39 3.916 k ok
SQUID bias C/Ret 19 6 3.453 k ok
SQUID bias D/Ret 30 42 3.314 k ok
Feedback A resistor+coil 28 41 15 - 25 k 1.038 k maybe ok?
Feedback B resistor+coil 14 1 16.69 k ok
Feedback C resistor+coil 31 44 21.12 k ok
Feedback D resistor+coil 17 5 20.53 k ok
QET A input coil resistance 1 2, 10, 11, 12, 13 19.76 k ok
QET B input coil resistance 3 47, 48, 49, 50 12.19 k ok
QET C input coil resistance 5 11, 4, 7, 8, 9 16.32 k ok
QET D input coil resistance 7 40, 43, 45, 46 15.94 k ok

Next Day