start › cdms › k100 › run_diary › 20240102

2024/01/02 (Tuesday)

Previous Day

  • Lab in-personnel: Zach
1204 Check contents of LN2 cold trap 1: 19.5 mbar, pump out with scroll pump
1212 Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2
1220 Continue to fill cold trap dewar, turn on He-3 pump and let mixture into the cold trap.
1225 Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture
1232 Open V6 to 12.0% to restart flow
1241 Open V6 to 12.1% to restart flow
1254 Open V6 to 12.2% to restart flow
1406 End cryocleaning mixture through trap 1. Pump mixture to dump
1434 P1 = 0.050 mbar, G1 = 2 mbar and stable. Close all valves and turn off 3He pump, leaving 625.9 mbar in dump
1435 Remove cold trap 1 from the LN2 bath to warm up overnight