UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170320

2017/03/20 (Monday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 →gender changer 3/1/2 → HVConn 1/3/2 → HV 1/2 → DCRC55/DCRC33
0915 Tower = 33.2 mK, Main bath = 39.4%
0920 Fill LN2 cold trap bath.
1013 Tower/MC/Coldplate = 33.1/30.6/184 mK, Still = 1.2 K / 0.110 mbar, G1/G2 = 260/235 mbar, 1K Pot = 1.694 K / 28 mbar, Main bath = 37.9%. Boil off rate: faster than slow mode (predicted level: 40.1%).
1155 Adjust trace lengths in ODB for DCRC1, DCRC2 to 26.2144ms (ChargeWaveFormLength = 131072, PhononWaveFormLength = 65536)
1201 Set HV = 60 V
1203 Adjust DCRC2 PC driver offset from 0.04 to 0.25
Channel Driver Offset
DCRC1 PA -1.35
DCRC1 PB -0.5
DCRC1 PC -0.25
DCRC2 PC 0.25
DCRC2 PD -0.05
1206 Start 30 min 60V HV transition long trace random data set wrong QET biases.
1207 HV = 60V, V_leak = 5.7 mV, V_crystal = 57.5 V
1208 Stop, data taking, need to set QET biases to the same values used for 0V noise studies last week.
1211 Start 30 min 60V HV transition long trace random data set with 26.2144ms trace length, Frontend Gain = (20/20/15)/(-/4/3), OG = 4/2, QET biases=table here ,20Hz in-run randoms with no starting/ending randoms.
1215 HV = 60V, V_leak = 3.2 mV, V_crystal = 58.6 V
1152 Recovery meter counter clicks over from 0183 to 0184 x100cuft. 11:52 is actually a guess, it may have been 11:46, or possibly 11:40. So we may be off by 2 or 4 cuft. Meter rate since 9:16 this morning has averaged 0.307 cuft/min.
1325 Ground and flash detector.
1406 When we started to take noise data last week, the gains were: Frontend Gain = (20/20/20)/(-/4/5), OG = 4/2. These weren't changed back properly for both the 1459 series on friday, and the 1211 series today. Set them properly now and re-take those series before moving on.
1414 Start 30 min 0V HV transition long trace random data set with 26.2144ms trace length, Frontend Gain = (20/20/20)/(-/4/5), OG = 4/2, QET biases=table here, 20Hz in-run randoms with no starting/ending randoms.
1434 Start LHe transfer @ MB = 31.2%
1527 End LHe transfer @ MB = 92.7%
Used 2.0 PSI pressure during transfer, with 250L Dewar less than half full. Recovery meter rate was 7.5 cuft/min during transfer.
1544 Set HV = 60 V
1546 Change DCRC2 Driver offsets.
Channel Driver Offset
DCRC1 PA -1.35
DCRC1 PB -0.5
DCRC1 PC -0.25
DCRC2 PC 1.07
DCRC2 PD 0.175
1549 Start 30 min 60V HV transition long trace random data set with 26.2144ms trace length, Frontend Gain = (20/20/20)/(-/4/5), OG = 4/2, QET biases=table here, 20Hz in-run randoms with no starting/ending randoms.
1550 HV = 60V, V_leak = 4.9 mV, V_crystal = 57.8 V
1630 Ground and flash detector. MIDAS tools flash&flash seems to not be working, flashed using testflash.msl sequence. A JIRA post describing the problem has been created.
1708 Set HV = 60 V
1712 Send all channels normal (QET bias=+/- 300uA). Adjust Driver Offsets.
Channel Driver Offset
DCRC1 PA -1.8
DCRC1 PB -1.0
DCRC1 PC -0.8
DCRC2 PC 1.3
DCRC2 PD 0.0
1713 Start 30 min 60V HV normal long trace random data set with 26.2144ms trace length, Frontend Gain = (20/20/20)/(-/4/5), OG = 4/2, QET biases=(300/300/300)/(-,-300,-300), 20Hz in-run randoms with no starting/ending randoms.
1715 HV = 60V, V_leak = 3.2 mV, V_crystal = 58.6 V
1757 Ground and flash detector
1801 Fill LN2 cold trap full.

Next Day