UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210411

2021/04/11 (Sunday)

Previous Day

  • Lab in-person: Derek
  • Virtual partner: Matt
Status Run 74 in progress. Warming up a second time to fix the DIB2qI short which reappeared at around 130 K. N2 in Cryostat Vacuum Jacket, some He in IVC. Mixture in dump.
1310 Derek enters lab
1315 MC(Cernox) = 285.9 K
1320 Check pressure in the CVJ after valving out turbo 1 minute. CVJ = 400 nb
1325 Move pump to IVC and remove pump hose from CVJ.
1440 Main Bath is lowered and pit is covered.
1445 Derek leaves lab

Next Day