UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20240118

2024/01/18 (Wednesday)

Previous Day

  • Lab in-personnel: Himangshu, Ping
1415 Check contents of warm LN2 Trap 1: 16.1 mbar (16.8 on G1). Pump out Cold Trap 1 with the scroll pump.
1418 G1 = 2.5 mbar, stop pumping on trap 1
1420 Filled LN2 into cold trap dewar
1428 Started Cryocleaning Procedure
1430 Opened V6 to 11.8%
1437 Opened V6 to 12.0%
1454 Opened V6 to 12.1%
1600 End Cryocleaning, pump mixture back to pump, leaving 638 mbar in G2.
1601 Removed Cold trap 1 to warm up back up to room temperature.

Next Day