| 0915 | Refilled LN2 dewar |
| 1106 | Refilled Cold Trap 1 with LN2 |
| 1119 | Started LHe transfer, MB% = 0.09 |
| | The heater for the linde dewar does not work for 4 psi, we had to flip back and forth between 8 psi and turning off the heater to run the transfer. |
| 1221 | Ended LHe transfer, MB% = 91.7 |
| 1801 | U01-1: pB, U09-5: pBr2, U03-3: pCr1, U05-2: pCr2, U08-2: pAr2, U05-4 : SQUID BiasC |
| | Switched off the above buttons on the diverter board to open up the circuit with only pD as the working channel |
| 1827 | Power on all three time synced DCRCs(1,3,4) to initialize them and then connect cables to check for signal |
| 1830 | Since DCRC3 is master, keep Cable1(with Side2pF) on DCRC1 |
| | Cable 1(SQuid Bias: -91.7, -88.4, -74.6, -100.5 LockPoint: -9.45, -3.01, -4.21, -7.36 ) and Cable 3(SQuid Bias: -70.4, -101.7, 0, -75.4 LockPoint: -4.55, -4.65, 0, -2.64 ). |
| | Cant bias DCRC1. Try swapping the slaves : Timing Link: DCRC3 → DCRC1 → DCRC4 |
| | Swap Master to DCRC1: Timing Link: DCRC1 → DCRC3 → DCRC4 |
| But in 2 DCRC setup, DCRC3 needs to be master to be able to time sync it | |