2023/11/15 (Wednesday)
- Lab in-personnel: Ping
| Status | Run 78 in progress. |
|---|
| 1317 | Tower(U28)/MC(H35)/Coldplate = 78.9/34.0/162 mK, Still(P1) = 1.19 K / 0.095 mbar / 0 mW, G1/G2 = 175/162 mbar, 1K Pot(P2) = 37.5° / 1.62 K / 20 mbar, MB = 27.7% |
|---|---|
| 1323 | Fill LN2 cold trap 1 from dewar |
| 1330 | Begin LHe transfer @ MB = 24.9% |
|---|---|
| 1415 | End LHe transfer @ MB = 95.6% |
| 2352 | Noise series with QET bias=1800 uA on all phonon channels. |
| 2358 | Noise series with QET bias=0 uA on all phonon channels. |