UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180902

2018/09/02 (Sunday)

Previous Day

Setup:
DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)

1.1kV → NaI B/C → Ortec 452(gain=5, shaping = 6 us, output=10V) / Ortec 575A(gain=10, shaping = 3us) → x10/x10 attenuator → DCRCX(4)
DCRC33(2) → kepco 1kV power supply → HV input
status: Took PuBe data overnight at -80V.
1305 Start LHe transfer (MB = 34.1%)
1310 Tower/MC/Coldplate = 30.9/29.5/185 mK, Still = 1.4±0.1 K / 0.070 mbar, G1/G2 = 123/119 mbar, 1K Pot = 1.60 K / 20 mbar, Turbo on IVC = 1.0 nbar.
1318 Fill LN2 cold trap bath.
1350 Sequence was running its 30-min waiting period after the final flash.
1352 Ended sequence.
1403 End LHe transfer (MB = 90.9%)
1406 Start 10 x 2hr PuBe datasets at -80V split into 10min subruns, with CDMS and NaI detectors running and DCRC2 as HV controller. Using sequence HVscan-80×10-15_5PreBias-30Flash-30wait-2hrData-10minSubRun.msl
CDMS detector: Driver Gains = 2x, QET biases = (280/260/305)/(140/280/295) uA, Front-End Gains = 10
NaI detector: 1.1kV → NaI B/C → Ortec 452(gain=5, shaping = 6 us, output=10V, Pos) / Ortec 575A(gain=10, shaping = 3us, Pos) → x10/x10 attenuator → DCRC4PB/PA, Driver Gains = 1/1, PhononWaveFormLength = 1024 (512 samples), PhononPrepulseSamples = 64 (64 samples)
1000 BOR randoms, trigger on DCRC3pB/D threshold = 7/9

Next Day