UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170503

2017/05/03 (Wednesday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 →gender changer 3/1/2 → HVConn 1/3/2 → HV 1/2 → DCRC55/DCRC33
PuBe source in paraffin barrel behind shield (west side)
Took NaI-triggered data overnight @50V.
0725 It looks like the DAQ sequencer crashed as happens from time to time, the last series that was begun was 07170502_2012 (8:12 pm last night) and data is still being written to this series, 658 dumps so far, 11 hours of data. The traces still look fine.
0930 07170502_2012 is now up to 780 dumps. MIDAS browser interfaces are unresponsive.
cdms2:bin cdmssoft$ps -u cdmssoft
    PID TTY          TIME CMD
 254410 pts/8    00:00:00 bash
 950419 ?        00:09:35 mserver
1118490 ?        00:01:04 dcrc_driver.exe
1118492 ?        18:56:22 towerfe3.exe
1118494 ?        19:20:04 triggerfe2.exe
1165113 pts/19   00:00:00 bash
1166754 pts/19   00:00:00 ps
3052831 ?        00:09:36 mserver
3052833 ?        1-19:05:17 mlogger
3052835 ?        02:52:11 lazylogger
cdms2:bin cdmssoft$./start_daq_umn.sh 
Good, we are on cdms2!
Becoming a daemon...
mserver started interactively
Becoming a daemon...
Becoming a daemon...
Becoming a daemon...
cdms2:bin cdmssoft$ps -u cdmssoft
    PID TTY          TIME CMD
 254410 pts/8    00:00:00 bash
 950419 ?        00:09:35 mserver
1118490 ?        00:01:04 dcrc_driver.exe
1118492 ?        18:57:25 towerfe3.exe
1118494 ?        19:21:07 triggerfe2.exe
1165113 pts/19   00:00:00 bash
1166779 ?        00:00:01 mhttpd
1166788 pts/19   00:00:00 ps
3052831 ?        00:09:36 mserver
3052833 ?        1-19:05:27 mlogger
3052835 ?        02:52:12 lazylogger
0940 Reestablish MIDAS browser interface as per instructions. Sequence restarts about 40 seconds into Loop 8 of 20.
0945 HV = 50.01 V, Vtest = 2.7 mV, nice and stable. Vdetector = 48.8 V
0945 Tower = 32.9 mK, Main bath = 38.2%
0950 Fill LN2 cold trap bath.
1025 Start 1 1-hour data series of 1-sided 50V HV coincidence data with Frontend Gain = (20/20/5)/(3/5/2), OG = 4/2, QET biases = table from Apr 28, with 1000 beginning randoms, no flashing, and a 22ADC bin threshold trigger on DCRC2 pD (Side1 pF). Running OR trigger of NaI detectors with PuBe source on west side of shield. NaI detector C has 311 mV threshold and detector B has 288 mV threshold
1032 Tower/MC/Coldplate = 32.9/30.9/183 mK, Still = 1.2 K / 0.110 mbar, G1/G2 = 235/217 mbar, 1K Pot = 1.692 K / 28 mbar. Main Bath = 37.0%. Boil off rate: a bit faster than slow mode (predicted level: 40.3% )
1140 Dial HV down to 0V
1140 Begin a 30 minute bake. Use Flash tool, DCRCs 1-2, On 1800 s, Off 5 s, Duration 0.6 hours
1155 Start LHe transfer (MB = 34.9 %)
1226 Start 1 5-minute TEST series of 1-sided 0V HV coincidence data with no randoms and a 1500ADC bin threshold trigger on DCRC4pA. Running OR trigger of NaI detectors with PuBe source on west side of shield. NaI detector C has 311 mV threshold and detector B has 288 mV threshold
This will be the comparison case for tests of reducing the lengths of unused channels to see if we can decrease the lag time of the DAQ and increase the read efficiency.
1237 End LHe transfer (MB = 92.5%)
1240 Change ChargeWaveFormLength from 16384 to 128 on DCRCs 1,2, and 4.
1241 Start 1 5-minute TEST series of 1-sided 0V HV coincidence data with no randoms and a 1500ADC bin threshold trigger on DCRC4pA. Running OR trigger of NaI detectors with PuBe source on west side of shield. NaI detector C has 311 mV threshold and detector B has 288 mV threshold, with shortened charge traces.
1320 Both of the above test series processed without any problems. The standard series recorded 9832 events in five minutes, but the one with reduced charge trace lengths recorded 18109 events. So it seems there's a nearly x2 increase in read efficiency. We'll stick with ChargeWaveFormLength = 128 (0.0256 ms) for now (and should consider doing so for future runs when charge channels are not relevant).
1320 Dial HV up to 65 V. After 5 minutes dial down to 50V.
1335 HV = 50.00 V, Vtest = 2.3 mV → Vdetector = 49.0 V
1338 Start 1 1-hour data series of 1-sided 50V HV coincidence data with Frontend Gain = (20/20/5)/(3/5/2), OG = 4/2, QET biases = table from Apr 28, with 1000 beginning randoms, no flashing, and a 22ADC bin threshold trigger on DCRC2 pD (Side1 pF). Running OR trigger of NaI detectors with PuBe source on west side of shield. NaI detector C has 311 mV threshold and detector B has 288 mV threshold
1345 oops, trigger was not enabled correctly. Enable DCRC2pD trigger now.
1335 HV = 50.00 V, Vtest = 2.5 mV, steady → Vdetector = 48.9 V
1444 Start 19 1-hour data series of 1-sided 50V HV coincidence data with Frontend Gain = (20/20/5)/(3/5/2), OG = 4/2, QET biases = table from Apr 28, with 1000 beginning randoms, no flashing, and a 1500ADC bin threshold trigger on DCRC4 pA (TTL signal) Running OR trigger of NaI detectors with PuBe source on west side of shield. NaI detector C has 311 mV threshold and detector B has 288 mV threshold
1725 Fill LN2 cold trap bath.

Next Day