UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20211013

2021/10/13 (Wednesday)

Previous Day

  • Lab in-personnel: Matt, Himangshu, Derek
Status Run 75 prep.
All mixture is in dump. Fridge isolated. 1K Pot isolated. LN2 Trap 2 still has contaminants in it. MB in pit, clean tent erected. Cryostat vacuum jacket (CVJ) pumped out. IVC open. Tower removed.
1550 Bring S104 to wirebond lab, rebond DIB4pC/Side1pA. This is the last one, all channels should now be connected.
Also made progress with replacing resistors on HV board.

Next Day