2021/10/13 (Wednesday)
- Lab in-personnel: Matt, Himangshu, Derek
| Status | Run 75 prep. |
|---|---|
| All mixture is in dump. Fridge isolated. 1K Pot isolated. LN2 Trap 2 still has contaminants in it. MB in pit, clean tent erected. Cryostat vacuum jacket (CVJ) pumped out. IVC open. Tower removed. | |
| 1550 | Bring S104 to wirebond lab, rebond DIB4pC/Side1pA. This is the last one, all channels should now be connected. |
| Also made progress with replacing resistors on HV board. |