Status: Tower partially installed; still need 4K heat sinks and SQUETs. Main bath vacuum jacket is evacuated. 1K Pot needle valve closed. LN2 traps clean. Mixture is in dump, fridge evacuated.
1300 Begin attaching SQUETs and striplines, electrical checkouts.
1330 Plug in DIB1 SQUET and stripline. DIB1 checkout OK
1400 Plug in DIB4 SQUET and stripline. DIB4 checkout OK
1415 Plug in DIB3 SQUET and stripline. DIB3 checkout OK. (surprise - no stripline breaks!)
Note: also checked cross-channel resistances, to check that there is still continuity to the crystal via the wirebonds. All show continuity of a few kΩ except DIB3pD, which is the one that was left unconnected. So this looks good.
1450 Finish 4K stage. For some reason not all of the small shield sections could be attached. One was blocked by one of the blackened heat shields. No one remembers this being an issue in the last run so it is rather strange, since the orientation is the same (we think).

The photos above show a trapezoidal piece of copper tape used instead of the standard shield section.
1515 Put IVC bottom on partially, then check all three DIBs at breakout box again. All look good.
1545 IVC bottom screws are tightened most of the way. Begin gently pumping IVC with scroll pump.
1550 Opening pump valve slowly, in stages. Monitor on mechanical gauge (with valve to mechanical gauge open). Currently scroll pump ≈ 4“Hg below atm (0.87 bar)
1555 Scroll pump ≈ 12”Hg below atm (0.60 bar)
1600 At around 1/3 bar, the gauge on the turbo station finally falls below its max reading of “>1E3 mbar”.
Scroll pump ≈ 22“Hg below atm (0.26 bar), 540 mbar on turbo station gauge
Scroll pump ≈ 28”Hg below atm (0.07 bar), 140 mbar on turbo station gauge. Close valve to mechanical gauge.
1605 Scroll pump = 1.4 mbar, IVC (with pump valve closed) = 1.9 mbar. Open valve to scroll pump completely.
1610 Scroll pump = 0.14 mbar, IVC = 0.54 mbar
1630 Scroll pump = 0.10 mbar, IVC = 0.25 mbar
1645 Scroll pump = 63 μbar, IVC = 190 μbar
1700 Tighten IVC bottom screws further now that it's under vacuum.
Scroll pump = 46 μbar, IVC = 120 μbar
1705 Begin pumping IVC with turbo pump.
1715 Turbo pump = 0.64 μbar, IVC = 86 μbar
1735 Turbo pump = 0.46 μbar, IVC = 63 μbar