Previous Day

  • Lab in-person: Matt
  • Virtual partner: Nick/Michael
1030 Matt Fritts body temperature = 97.4 F
1115 Matt arrives in lab
1135 Turbo on IVC = 22 nbar. Better than yesterday so maybe reassembly improved things. Still high compared to a week ago, suspect the gauge is getting dirty.
1143 With turbo valved out for a while, IVC = 0.86 ubar. Better than yesterday.
1140 Pump out warm LN2 Traps 1&2 (each had about 1 mbar)
1220 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.5%
1230 Increase V6 → 12.9% to restart flow
1255 Increase V6 → 13.0% to speed up flow
1315 Increase V6 → 13.1% to speed up flow
1320 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 560-800 mbar. Pump mixture to dump.
Removed 11.7 mbar.
1335 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 13.1%
1340 Increase V6 → 13.2% to restart flow
1420 Increase V6 → 13.3% to speed up flow
1440 Stop cleaning through Trap 2 after 60 min. G2 flow pressure was 580-750 mbar. Pump mixture to dump.
Removed 4.6 mbar.
1500 Close IGH valves and turn off 3He pump
NOTE: V12b Speedivalve is still open, and LN2 Trap 2 is still in LN2 bath (because cleaning was completed remotely).
1320 Leak checks at top of fridge, around stripline elbow and KF flange, 60→200 pbarL/s. Try covering elbow with cellophane tape, doesn't seem to help much.
1340 Matt leaving lab